Heavy Construction — Jefferson, Kansas

WD KS20260163-15166-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Jefferson, Kansas (construction type: heavy) is $28.89/hr base + $8.87/hr fringe = $37.76/hr total package (WD KS20260163-15166-hvy, Rev. 1).

Scroll down for all 16 trade classifications covered by this determination.

WD Number: KS20260163-15166-hvy
Revision: 1
Construction Type: heavy
State: Kansas (KS)
County: Jefferson
Effective: May 17, 2026
Trades covered: 16
Official source: SAM.gov reference KS20260163View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $28.89 $8.87 $37.76 +52% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $39.06 $18.71 $57.77 Above median +137% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.64 $18.29 $58.93 +98% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $39.00 $34.25 $73.25 Above median +213% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $18.41 $2.45 $20.86 Above median -3% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $36.24 $15.87 $52.11 Top 10% +142% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN $53.68 $26.44 $80.12 +63% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $29.07 $12.96 $42.03 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $24.77 $11.51 $36.28 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $32.13 $9.58 $41.71 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $30.32 $15.54 $45.86 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER $36.09 $16.83 $52.92 +118% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $39.57 $21.69 $61.26 Above median +152% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $36.09 $16.83 $52.92 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $39.57 $21.69 $61.26 Above median +152% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $28.60 $19.49 $48.09 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Jefferson, KS — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Jefferson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KS20260163-15166-hvy →