Building Construction — Allen, Kansas

WD KS20260044-15180-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Allen, Kansas (construction type: building) is $45.60/hr base + $35.47/hr fringe = $81.07/hr total package (WD KS20260044-15180-bld, Rev. 1).

Scroll down for all 22 trade classifications covered by this determination.

WD Number: KS20260044-15180-bld
Revision: 1
Construction Type: building
State: Kansas (KS)
County: Allen
Effective: May 17, 2026
Trades covered: 22
Official source: SAM.gov reference KS20260044View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $45.60 $35.47 $81.07 Above median +261% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $29.07 $15.61 $44.68 +70% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK..$ 19.04 3.95 CARPENTER $17.92 $2.09 $20.01 Top 10% -19% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.01 $3.33 $21.34 -12% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $38.75 $18.52 $57.27 +93% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, EXCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS $27.63 $10.96 $38.59 Top 10% +30% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC A. VACATION PAY: 6% FOR 6 MONTHS TO 5 YEARS SERVICE; 8% WITH 5 OR MORE YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL $60.69 $38.44 $99.13 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $13.33 $0.00 $13.33 $0.00 $0.00 $0.00 $0.00
GLAZIER $18.92 $6.64 $25.56 +4% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $39.00 $34.25 $73.25 Top 10% +213% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $23.02 $15.09 $38.11 +63% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.37 $2.77 $15.14 Above median -30% vs market $0.00 $0.00 $0.00 $0.00
METAL BUILDING ERECTOR $11.19 $1.83 $13.02 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $15.72 $1.95 $17.67 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $36.18 $19.97 $56.15 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $45.90 $19.94 $65.84 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION $27.79 $10.85 $38.64 Above median +28% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $14.48 $2.96 $17.44 -23% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $52.18 $27.15 $79.33 Above median +224% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $28.20 $10.85 $39.05 +60% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $23.18 $5.83 $29.01 +19% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER: FIRE SPRINKLER $41.83 $27.60 $69.43 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Allen, KS — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Allen

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KS20260044-15180-bld →