Highway Construction — Madison, Iowa

WD IA20260028-15138-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER: ZONE 1 in Madison, Iowa (construction type: highway) is $37.00/hr base + $18.62/hr fringe = $55.62/hr total package (WD IA20260028-15138-hwy, Rev. 1).

Scroll down for all 56 trade classifications covered by this determination.

WD Number: IA20260028-15138-hwy
Revision: 1
Construction Type: highway
State: Iowa (IA)
County: Madison
Effective: May 17, 2026
Trades covered: 56
Official source: SAM.gov reference IA20260028View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER: ZONE 1 $37.00 $18.62 $55.62 Top 10% +82% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: ZONE 2 $37.00 $18.62 $55.62 Top 10% +82% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: ZONE 3 $37.00 $18.62 $55.62 Top 10% +82% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: ZONE 4 $35.75 $17.09 $52.84 Top 10% +73% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: ZONE 5 $32.65 $17.09 $49.74 Top 10% +63% vs market $0.00 $0.00 $0.00 $0.00
CONCRETE FINISHER: ZONE 1 $31.85 $15.08 $46.93 Top 10% +79% vs market $0.00 $0.00 $0.00 $0.00
CONCRETE FINISHER: ZONE 2 $31.85 $15.08 $46.93 Top 10% +79% vs market $0.00 $0.00 $0.00 $0.00
CONCRETE FINISHER: ZONE 3 $31.85 $15.08 $46.93 Top 10% +79% vs market $0.00 $0.00 $0.00 $0.00
CONCRETE FINISHER: ZONE 4 $30.00 $10.70 $40.70 Top 10% +55% vs market $0.00 $0.00 $0.00 $0.00
CONCRETE FINISHER: ZONE 5 $28.95 $10.70 $39.65 Top 10% +51% vs market $0.00 $0.00 $0.00 $0.00
Carpenter & Piledrivermen: ZONE 1 $34.27 $17.08 $51.35 Top 10% +98% vs market $0.00 $0.00 $0.00 $0.00
Carpenter & Piledrivermen: ZONE 2 $32.80 $17.23 $50.03 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
Carpenter & Piledrivermen: ZONE 3 $32.68 $17.48 $50.16 Top 10% +93% vs market $0.00 $0.00 $0.00 $0.00
Carpenter & Piledrivermen: ZONE 4 $32.45 $14.80 $47.25 Top 10% +82% vs market $0.00 $0.00 $0.00 $0.00
Carpenter & Piledrivermen: ZONE 5 $31.40 $13.45 $44.85 Top 10% +73% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ZONE 1, 2, AND 3 $41.40 $18.80 $60.20 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ZONE 4 $40.10 $17.80 $57.90 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ZONE 5 $38.45 $16.05 $54.50 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ZONE 1 $32.28 $19.07 $51.35 Top 10% +61% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ZONE 2 $30.57 $19.46 $50.03 Top 10% +57% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ZONE 3 $30.56 $19.60 $50.16 Top 10% +58% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ZONE 4 $28.74 $18.51 $47.25 Top 10% +49% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ZONE 5 $27.26 $17.59 $44.85 Top 10% +41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ZONE 4 $21.60 $13.42 $35.02 Bottom 10% +53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ZONE 4 $23.57 $13.42 $36.99 +61% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ZONE 4 $25.42 $13.42 $38.84 Above median +69% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ZONE 4 $28.96 $13.42 $42.38 Top 10% +85% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ZONE 5 $21.60 $12.17 $33.77 Bottom 10% +47% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ZONE 5 $23.57 $12.17 $35.74 +56% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ZONE 5 $25.42 $12.17 $37.59 Above median +64% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ZONE 5 $28.96 $12.17 $41.13 Top 10% +79% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ZONES 1, 2, & 3 $21.36 $13.64 $35.00 Bottom 10% +53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ZONES 1, 2, & 3 $24.44 $13.64 $38.08 +66% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ZONES 1, 2, & 3 $26.29 $13.64 $39.93 Above median +74% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ZONES 1, 2, & 3 $28.96 $13.64 $42.60 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1 $34.87 $18.28 $53.15 Bottom 10% +81% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1 $37.37 $18.28 $55.65 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1 $38.92 $18.28 $57.20 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 2 $34.67 $18.28 $52.95 Bottom 10% +80% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 2 $37.22 $18.28 $55.50 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 2 $38.82 $18.28 $57.10 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 3 $32.30 $31.30 $63.60 Bottom 10% +116% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 3 $33.80 $31.30 $65.10 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 3 $35.10 $31.30 $66.40 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 4 $31.88 $20.70 $52.58 Bottom 10% +79% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 4 $33.96 $20.70 $54.66 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 4 $35.10 $20.70 $55.80 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 5 $30.40 $15.55 $45.95 Bottom 10% +56% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 5 $31.40 $15.55 $46.95 +60% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 5 $33.13 $15.55 $48.68 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 5 $34.17 $15.55 $49.72 Top 10% +69% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: ZONE 1 $29.00 $13.40 $42.40 Top 10% +60% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: ZONE 2 $29.00 $13.40 $42.40 Top 10% +60% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: ZONE 3 $29.00 $13.40 $42.40 Top 10% +60% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: ZONE 4 $29.00 $11.00 $40.00 Top 10% +51% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: ZONE 5 $27.24 $11.00 $38.24 Top 10% +44% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Madison, IA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Madison

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IA20260028-15138-hwy →