Building Construction — Harrison, Iowa

WD IA20260067-15982-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Harrison, Iowa (construction type: building) is $38.26/hr base + $20.54/hr fringe = $58.80/hr total package (WD IA20260067-15982-bld, Rev. 1).

Scroll down for all 25 trade classifications covered by this determination.

WD Number: IA20260067-15982-bld
Revision: 1
Construction Type: building
State: Iowa (IA)
County: Harrison
Effective: May 17, 2026
Trades covered: 25
Official source: SAM.gov reference IA20260067View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $38.26 $20.54 $58.80 Above median +150% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $48.48 $33.91 $82.39 Above median +151% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $34.80 $19.24 $54.04 +77% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $21.61 $9.92 $31.53 +21% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $32.29 $28.45 $60.74 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $46.40 $20.89 $67.29 Above median +123% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $35.53 $24.45 $59.98 +89% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $37.50 $30.99 $68.49 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $38.82 $17.04 $55.86 +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.81 $0.00 $12.81 -44% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $14.57 $0.00 $14.57 Above median -36% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.11 $0.00 $16.11 Above median -30% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.41 $0.00 $17.41 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $24.20 $9.62 $33.82 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $22.96 $7.49 $30.45 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $21.35 $8.54 $29.89 +27% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $19.77 $6.64 $26.41 +13% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $43.20 $23.25 $66.45 Above median +126% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $45.20 $23.25 $68.45 Above median +133% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:- BOBCAT/SKID STEER/SKID LOADER, LOADER WITH OR WITHOUT ATTACHMENTS, PAVER, ROLLER $34.70 $21.94 $56.64 +92% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:- BULLDOZER, LOADER $32.62 $21.94 $54.56 +85% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $20.11 $4.99 $25.10 +11% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $31.07 $9.72 $40.79 +38% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $34.80 $19.24 $54.04 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY $55.88 $38.44 $94.32 Bottom 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Harrison, IA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Harrison

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IA20260067-15982-bld →