Building Construction — Floyd, Iowa

WD IA20260043-15102-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER in Floyd, Iowa (construction type: building) is $48.48/hr base + $33.91/hr fringe = $82.39/hr total package (WD IA20260043-15102-bld, Rev. 1).

Scroll down for all 25 trade classifications covered by this determination.

WD Number: IA20260043-15102-bld
Revision: 1
Construction Type: building
State: Iowa (IA)
County: Floyd
Effective: May 17, 2026
Trades covered: 25
Official source: SAM.gov reference IA20260043View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $48.48 $33.91 $82.39 Above median +151% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $29.80 $17.16 $46.96 +54% vs market $0.00 $0.00 $0.00 $0.00
CAULKER $17.21 $8.18 $25.39 Above median $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.99 $1.73 $18.72 -29% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $25.02 $9.76 $34.78 +15% vs market $0.00 $0.00 $0.00 $0.00
INSULATOR: MECHANICAL $18.09 $4.67 $22.76 Above median -3% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $24.43 $16.24 $40.67 Above median +28% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $36.30 $25.80 $62.10 Above median +95% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $35.53 $24.45 $59.98 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $15.21 $3.23 $18.44 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $29.36 $17.99 $47.35 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $18.00 $2.70 $20.70 Above median -10% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $26.64 $14.47 $41.11 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $25.14 $18.26 $43.40 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $22.31 $8.36 $30.67 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $21.51 $6.41 $27.92 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $25.36 $15.62 $40.98 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $32.41 $16.30 $48.71 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $45.20 $23.25 $68.45 Above median +133% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $25.66 $9.61 $35.27 +20% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:- FORKLIFT $35.29 $18.35 $53.64 +82% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:- FORKLIFT $37.62 $18.35 $55.97 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $15.53 $4.57 $20.10 -11% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT, AND HVAC UNIT INSTALLATION $21.10 $7.81 $28.91 -2% vs market $0.00 $0.00 $0.00 $0.00
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY $56.30 $38.44 $94.74 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Floyd, IA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Floyd

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IA20260043-15102-bld →