Highway Construction — Warrick, Indiana
WD IN20260006-16799-hwy · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for (DUBOIS, GIBSON, PERRY, PIKE, LINE CONSTRUCTION: GROUNDMAN, CLASS A in Warrick, Indiana (construction type: highway) is $33.96/hr base + $19.04/hr fringe = $53.00/hr total package (WD IN20260006-16799-hwy, Rev. 2).
Scroll down for all 242 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| (DUBOIS, GIBSON, PERRY, PIKE, LINE CONSTRUCTION: GROUNDMAN, CLASS A | $33.96 | $19.04 | $53.00 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $56.02 | $37.24 | $93.26 Top 10% +284% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AN FINISHES TO ALL TYPES OF ME | $38.19 | $23.59 | $61.78 Top 10% +154% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHINGS TO ALL TYPES OF | $38.56 | $18.70 | $57.26 Top 10% +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES O | $37.25 | $19.85 | $57.10 Above median +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES O | $30.00 | $20.89 | $50.89 Bottom 10% +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYP | $40.20 | $25.68 | $65.88 Top 10% +171% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKERS/INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHINGS TO ALL TYPES OF MECHANICAL S | $35.23 | $22.79 | $58.02 Top 10% +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $35.34 | $21.72 | $57.06 Above median +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, CAULKER, CLEANER, POINTER | $34.00 | $19.71 | $53.71 Top 10% +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONE MASON, POINTER, CAULKING | $36.24 | $17.39 | $53.63 Top 10% +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON | $35.21 | $18.19 | $53.40 Above median +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER | $35.83 | $20.89 | $56.72 Top 10% +64% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER | $33.75 | $20.12 | $53.87 Bottom 10% +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: BRICKLAYERS, STONE MASONS AND POINTER/ CLEANER/CAULKER | $38.16 | $18.22 | $56.38 Top 10% +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: BRICKLAYERS, STONEMASONS AND CEMENT MASONS | $33.70 | $16.57 | $50.27 Top 10% +45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: CEMENT MASON | $37.16 | $18.22 | $55.38 Top 10% +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: INCLUDING STONEMASON, AND POINTER, CAULKER & CLEANER | $42.05 | $28.22 | $70.27 Top 10% +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: STONE MASON, MARBLE MASONS, POINTER, CLEANER, AND CAULKER | $35.00 | $21.60 | $56.60 Top 10% +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: TERRAZO FINISHER | $25.33 | $14.19 | $39.52 Top 10% +14% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: TERRAZZO WORKER | $37.97 | $18.06 | $56.03 Top 10% +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: TILE LAYER, MARBLE MASON, MOSAIC WORKER | $38.16 | $18.22 | $56.38 Top 10% +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $31.09 | $28.53 | $59.62 Above median +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $34.69 | $25.59 | $60.28 Above median +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $30.52 | $29.11 | $59.63 Above median +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $35.14 | $25.10 | $60.24 Above median +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $30.59 | $29.03 | $59.62 Above median +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $30.94 | $29.08 | $60.02 Above median +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $33.74 | $25.84 | $59.58 Above median +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $34.06 | $25.67 | $59.73 Above median +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $45.91 | $35.90 | $81.81 Top 10% +181% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $34.55 | $25.59 | $60.14 Above median +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER (BARTHOLOMEW, BROWN,, DECATUR, FRANKLIN, JOHNSON , RUSH AND SHELBY COUNTIES) | $34.25 | $25.59 | $59.84 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER (HAMILTON, HANCOCK, HENDRICKS, JOHNSON, AND MARION COUNTIES) | $35.80 | $25.59 | $61.39 Top 10% +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $25.75 | $13.50 | $39.25 Above median +38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $28.50 | $13.50 | $42.00 Above median +47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $23.38 | $11.94 | $35.32 Above median +24% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER (ELKHART, FULTON AND MARSHALL COUNTIES; PULASKI COUNTY) | $31.50 | $14.30 | $45.80 Top 10% +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER (PULASKI, JASPER, ALL OF STARKE COUNTY) | $36.01 | $25.40 | $61.41 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER: AREA #121 (BENTON, CARROLL, CASS, CLINTON, FOUNTAIN, HOWARD, MIAMI, MONTGOMERY, TIPPECANOE, WARREN, WHITE AND VERMILLI | $33.50 | $21.95 | $55.45 Top 10% +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER: AREA #165 | $41.24 | $24.55 | $65.79 Top 10% +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER: AREA #406 | $43.72 | $35.59 | $79.31 Top 10% +178% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER: AREA #532 (BOONE, HAMILTON; HANCOCK COUNTY; HENDRICKS, JOHNSON, MARION AND MORGAN COUNTIES) | $35.00 | $20.61 | $55.61 Top 10% +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER: AREA #566 | $32.50 | $20.77 | $53.27 Top 10% +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER: AREA #821 | $30.02 | $18.20 | $48.22 Top 10% +69% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER: AREA #83 | $32.55 | $22.04 | $54.59 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER: AREA #83 (BLACKFORD, DELAWARE, GRANT, HAMILTON, HANCOCK, JAY, MADISON, TIPTON, AND WABASH COUNTIES) | $32.55 | $22.04 | $54.59 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| COMMUNICATION TECHNICIAN | $26.50 | $18.33 | $44.83 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| COMMUNICATION TECHNICIAN | $30.00 | $18.07 | $48.07 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CONCRETE PUMP; CONCRETE MESH DEPRESSOR, INDEPENDENTLY OPERATED; CONCRETE SPREADER, POWER-DRIVEN; END LOADER UNDER 1 1/2 CU. YD.; EXCAVATING LOADER, PO | $42.88 | $23.35 | $66.23 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $30.08 | $17.23 | $47.31 +50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $41.04 | $18.94 | $59.98 Above median +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $33.98 | $18.04 | $52.02 +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $46.00 | $29.23 | $75.23 Above median +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $27.20 | $14.54 | $41.74 +33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $38.05 | $22.32 | $60.37 Above median +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.18 | $23.18 | $63.36 Above median +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $36.00 | $21.51 | $57.51 +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.96 | $22.44 | $63.40 Above median +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $45.45 | $28.19 | $73.64 Above median +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $35.76 | $18.96 | $54.72 +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $27.64 | $13.23 | $40.87 +30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $41.00 | $27.36 | $68.36 Above median +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.64 | $20.46 | $61.10 Above median +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $33.02 | $16.10 | $49.12 +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $41.50 | $31.23 | $72.73 Above median +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $48.10 | $31.28 | $79.38 Top 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $43.30 | $25.32 | $68.62 Above median +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $39.20 | $17.95 | $57.15 +82% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.18 | $22.15 | $62.33 Above median +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $42.02 | $23.07 | $65.09 Above median +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERANS DAY THANKSGIVING DAY AND CHRISTMAS DAY | $42.00 | $24.15 | $66.15 Top 10% +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $53.55 | $44.88 | $98.43 Top 10% +255% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $31.95 | $17.75 | $49.70 +79% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $35.13 | $19.57 | $54.70 +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $29.50 | $19.02 | $48.52 +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $34.22 | $24.67 | $58.89 Above median +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $36.03 | $20.55 | $56.58 Above median +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER (JASPER AND NEWTON COUNTIES) | $44.09 | $30.73 | $74.82 Top 10% +170% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, W | $44.82 | $34.00 | $78.82 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS | $38.56 | $18.70 | $57.26 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS | $33.44 | $21.84 | $55.28 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS | $35.10 | $19.39 | $54.49 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS | $19.80 | $13.30 | $33.10 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS | $25.00 | $13.70 | $38.70 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERI | $23.00 | $14.40 | $37.40 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (ADAMS, ALLEN, BLACKFORD, DEKALB, DELAWARE, FULTON, GRANT, HUNTINGTON, JAY, MIAMI, NOBLE, STEUBEN, WABASH, WELLS, AND WHITLEY COUNTIES) | $35.40 | $26.92 | $62.32 Top 10% +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (BARTHOLOMEW, BENTON, BOONE, BROWN, CARROLL, CASS, CLAY, CLINTON, DAVIESS, DECATUR, DELAWARE, FAYETTE, FOUNTAIN,FRANKLIN, FULTON, GRANT, GR | $38.00 | $26.39 | $64.39 Top 10% +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (CLARK, CRAWFORD, FLOYD, HARRISON, JACKSON; JEFFERSON; JENNINGS, LAWRENCE, MARTIN, ORANGE, PERRY; SCOTT AND WASHINGTON COUNTIES:) | $36.17 | $25.80 | $61.97 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (DAVIESS, DUBOIS, GIBSON, KNOX, MARTIN, PERRY, PIKE, POSEY, SPENCER, VANDERBURGH, AND WARRICK) | $35.34 | $25.75 | $61.09 Top 10% +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (ELKHART, FULTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, PULASKI, AND STARKE COUNTIES) | $39.76 | $25.00 | $64.76 Top 10% +82% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (JASPER, NEWTON, PULASKI COUNTIES) | $47.75 | $41.28 | $89.03 Top 10% +150% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING (DEARBORN, DECATUR, FAYETTE, FRANKLIN, OHIO, RIPLEY, SWITZERLAND AND JENNINGS COUNTIES) | $36.17 | $25.80 | $61.97 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: SHEETER (JASPER, NEWTON, PULASKI COUNTIES) | $48.00 | $41.28 | $89.28 Top 10% +150% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKERS: (FAYETTE, RANDOLPH UNION AND WAYNE COUNTIES) | $35.39 | $24.35 | $59.74 Top 10% +67% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKERS: FENCE ERECTORS (DEARBORN, DECATUR, FAYETTE, FRANKLIN, JEFFERSON, JENNINGS, OHIO, RIPLEY, RUSH, SWITZERLAND, AND UNION) | $35.88 | $23.90 | $59.78 Top 10% +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKERS: ORNAMENTAL (DEARBORN, DECATUR, FAYETTE, FRANKLIN, JEFFERSON, JENNINGS, OHIO, RIPLEY, RUSH, SWITZERLAND, AND UNION) | $37.77 | $23.90 | $61.67 Top 10% +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKERS: STRUCTURAL, MACHINERY MOVERS, RIGGERS (DEARBORN, DECATUR, FAYETTE, FRANKLIN, JEFFERSON, JENNINGS, OHIO, RIPLEY, RUSH, SWITZERLAND, AND UN | $37.77 | $23.90 | $61.67 Top 10% +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| KOSCIUSKO, LAGRANGE, MARSHALL, NEWTON, NOBLE, PULASKI, AND STARKE COUNTIES) | $24.30 | $30.85 | $55.15 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER, CARPENTER TENDER, FENCE ERECTOR, GRADE CHECKER, GUARD RAIL ERECTOR, CONTINUOUS S | $33.45 | $27.50 | $60.95 Top 10% +156% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER, CARPENTER TENDER, FENCE ERECTOR, GRADE CHECKER, GUARD RAIL ERECTOR, CONTINUOUS S | $30.68 | $27.50 | $58.18 Bottom 10% +144% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER, LASER BEAM ALIGNER, MANHOLE ERECTOR, SEWER PIPE LAYER, WATER LINE INSTALLER, TEM | $33.75 | $27.50 | $61.25 Top 10% +157% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER, LASER BEAM ALIGNER, MANHOLE ERECTOR, SEWER PIPE LAYER, WATER LINE INSTALLER, TEM | $30.98 | $27.50 | $58.48 Bottom 10% +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN, DYNAMITE AND POWDER MAN, CONCRETE BARRIER RAIL FORM SETTER, CONCRETE SAW | $34.45 | $27.50 | $61.95 Top 10% +160% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN, DYNAMITE AND POWDER MAN, CONCRETE BARRIER RAIL FORM SETTER, CONCRETE SAW | $31.68 | $27.50 | $59.18 Bottom 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JO | $28.50 | $17.72 | $46.22 Top 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, T | $29.00 | $17.72 | $46.72 Top 10% +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LE | $29.50 | $17.72 | $47.22 Top 10% +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: UTILITY CONSTRCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN; LI | $30.65 | $18.22 | $48.87 Top 10% +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN; L | $33.45 | $27.50 | $60.95 Top 10% +156% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN; L | $30.68 | $27.50 | $58.18 Above median +144% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN; L | $30.65 | $18.00 | $48.65 Bottom 10% +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY O | $33.75 | $27.50 | $61.25 Top 10% +157% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY O | $30.98 | $27.50 | $58.48 Above median +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY O | $31.15 | $18.00 | $49.15 Bottom 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY O | $31.15 | $18.22 | $49.37 +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CON | $34.45 | $27.50 | $61.95 Top 10% +160% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CON | $31.68 | $27.50 | $59.18 Above median +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CON | $31.65 | $18.00 | $49.65 Bottom 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; HOD | $31.65 | $18.00 | $49.65 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; HOD CARRIER; GENERAL | $31.65 | $18.00 | $49.65 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR | $39.11 | $17.13 | $56.24 Bottom 10% +17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN | $25.90 | $13.97 | $39.87 Bottom 10% -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER | $31.49 | $16.93 | $48.42 Top 10% +0% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN-EQUIPMENT OPERATOR | $43.19 | $21.81 | $65.00 Top 10% +35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: HEAVY-EQUIPMENT OPERATOR: ALL CRAWLER TYPE EQUIPMENT D-4 AND LARGER) | $49.30 | $23.64 | $72.94 Top 10% +51% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: LINEMAN | $60.15 | $26.90 | $87.05 Top 10% +81% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION:: LINEMAN | $50.28 | $22.38 | $72.66 Bottom 10% +51% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION:: LINEMAN & CABLE SPLICERS | $44.52 | $18.43 | $62.95 Top 10% +31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $47.92 | $37.23 | $85.15 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $39.10 | $26.94 | $66.04 +81% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT (HAMILTON AND MARION COUNTIES, AND THE FOLLOWING TOWNSHIPS IN JOHNSON COUNTY: CAMP ATTERBURY, CLARK, PLEASANT, AND WHITE RIVER) | $26.81 | $19.28 | $46.09 Top 10% +27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT: ZONE 1: POSEY, VANDERBURGH AND WARRICK COUNTIES | $36.30 | $28.37 | $64.67 Top 10% +78% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT: ZONE 2: GIBSON, GREENE AND SULLIVAN COUNTIES | $35.00 | $29.33 | $64.33 Top 10% +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| NATURE), GUARDRAIL POST DRIVER, LEAD GREASER, HELICOPTER, HIGHLIFT SHOVEL, HOIST, HOIST, HYDRAULIC POWER UNITS HYDRO OR WATER BLASTER, LOCOMOTIVE OPER | $48.70 | $45.93 | $94.63 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER BRUSH, ROLLER | $31.02 | $16.89 | $47.91 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER SPRAY AND SAND-BLASTING | $30.52 | $15.89 | $46.41 Top 10% +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRIDGES, LEAD ABATEMENT | $31.68 | $14.46 | $46.14 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH & ROLLER, DRYWALL TAPING & FINISHING, VINYL/PAPER HANGING | $32.50 | $19.86 | $52.36 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH & ROLLER, PAPERHANGER, DRYWALL TAPING | $30.34 | $14.46 | $44.80 Top 10% +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER | $31.15 | $18.76 | $49.91 Above median +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SANDBLASTING, WATERBLASTING | $31.68 | $14.46 | $46.14 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $28.79 | $14.46 | $43.25 Above median +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $33.00 | $19.86 | $52.86 Top 10% +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY AND SANDBLASTING | $32.10 | $18.76 | $50.86 Top 10% +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRUSH & ROLLER | $41.00 | $31.26 | $72.26 Top 10% +200% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRUSH & ROLLER FOOTNOTE A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRUCTURES OV | $31.20 | $15.55 | $46.75 Top 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRUSH & ROLLER FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL S | $31.12 | $21.20 | $52.32 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRUSH & ROLLER OF MASTICS, CREOSOTES, KEWINCH KOATE, & COAL TAR EPOXY FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL | $31.12 | $21.20 | $52.32 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRUSH AND ROLLER | $41.00 | $31.26 | $72.26 Top 10% +200% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRUSH, ROLLER & PAPERHANGER | $37.42 | $15.99 | $53.41 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRUSH, ROLLER, PAPERHANGER, & DRYWALL FINISHING | $27.04 | $16.27 | $43.31 Top 10% +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRUSH; ROLLER; PAPERHANGING; DRYWALL FINISHERS | $25.10 | $16.39 | $41.49 Top 10% +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: DRYWALL FINISHERS FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE AL | $31.87 | $21.20 | $53.07 Top 10% +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: DRYWALL TAPING & FINISHING | $41.80 | $31.26 | $73.06 Top 10% +204% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: LEAD ABATEMENT | $32.24 | $16.27 | $48.51 Top 10% +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: SPRAY & POT MAN FOOTNOTE A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRUCTURES O | $32.20 | $15.55 | $47.75 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: SPRAY & SANDBLAST POT TENDERS AND GROUND PERSONNEL | $27.04 | $16.27 | $43.31 Top 10% +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: SPRAY, SANDBLAST & WATERBLAST | $37.42 | $15.99 | $53.41 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST, & STEAM CLEANING | $27.04 | $16.27 | $43.31 Top 10% +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: SPRAY/WATERBLASTING; SANDBLASTING | $26.10 | $16.39 | $42.49 Top 10% +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS:: SPRAY OF MASTICS CREOSOTES, KWINCH KOATE, COAL TAR EPOXY FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES O | $32.12 | $21.20 | $53.32 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS:: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST & STEAM CLEANING FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES | $32.12 | $21.20 | $53.32 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER (JASPER, AND NEWTON) | $48.50 | $31.12 | $79.62 Top 10% +157% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $25.69 | $11.75 | $37.44 Bottom 10% +52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER: AREA #121 (BENTON, CARROLL, CASS, CLINTON, FOUNTAIN, HOWARD, MIAMI, MONTGOMERY, TIPPECANOE, WARREN, WHITE AND VERMILLION COUNTIES) | $33.76 | $20.05 | $53.81 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER: AREA #46 | $31.50 | $18.32 | $49.82 Top 10% +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER: AREA #83 | $30.60 | $17.19 | $47.79 Top 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER: AREA #83 (BLACKFORD, DELAWARE, GRANT, HAMILTON, HANCOCK, JAY, MADISON, TIPTON, AND WABASH COUNTIES) | $30.60 | $17.19 | $47.79 Top 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER (JASPER AND NEWTON COUNTIES) | $49.77 | $28.56 | $78.33 Top 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER AND STEAMFITTER | $45.06 | $23.16 | $68.22 Bottom 10% +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER AND STEAMFITTER | $50.05 | $20.39 | $70.44 Above median +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PIPEFITTER, STEAMFITTER (JASPER, MARSHALL, PULASKI AND STARKE COUNTIES) | $44.93 | $23.03 | $67.96 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER | $32.00 | $20.13 | $52.13 +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBERS AND PIPEFITTERS | $46.42 | $21.33 | $67.75 Above median +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBERS AND PIPEFITTERS | $46.65 | $23.45 | $70.10 Above median +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBERS AND PIPEFITTERS | $40.70 | $29.52 | $70.22 Top 10% +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBERS AND PIPEFITTERS (BARTHOLOMEW, BOONE, HAMILTON, HANCOCK, HENDRICKS, HOWARD, JOHNSON AND MARION COUNTIES; MIAMI COUNTY; MORGAN, SHELBY AND TIPT | $50.05 | $20.39 | $70.44 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION: GROUP 4 AIR COMPRESSOR; ASSISTANT TO ENGINEER, OILER; BITUMINOUS PATCHING TAMPER | $34.55 | $36.65 | $71.20 Top 10% +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION:GROUP 3 PLANT ENGINEER; BASE PAVER; CONCRETE FINISHING MACHINE; CONCRETE MIXER, LES | $35.95 | $36.65 | $72.60 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 2 COMBINATION BACKHOE FRONT END LOADER MACHINE WITH LESS THAN 1/2 CU. YD., BACKHOE | $47.90 | $45.93 | $93.83 Top 10% +170% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 3 BACK FILLER, BITUMINOUS DISTRIBUTOR, BROOM AND BELT MACHINE, BULL FLOAT, COMPRES | $43.60 | $45.93 | $89.53 Top 10% +157% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 4 AIR COMPRESSORS, CONVEYOR, FIREMAN ON BOILER, GENERATOR, GROUT MACHINE, POWER CU | $41.40 | $45.93 | $87.33 Top 10% +151% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 5 DECK HAND, HETHERINGTON DRIVER, MECHANICAL HEATER, OUTBOARD OR INBOARD MOTOR BOA | $35.95 | $45.93 | $81.88 Top 10% +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION: GROUP 1 AIR COMPRESSORS IN MANIFOLD WITH THROTTLE VALVE; ASPHALT PLANT ENGINEER; A | $38.85 | $36.65 | $75.50 Top 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION: GROUP 2 AIR COMPRESSOR WITH THROTTLE VALVE OR CLEVER BROOKS TYPE COMBINATION; BACK | $37.25 | $36.65 | $73.90 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 1- AIR COMPRESSORS IN MANIFOLD WITH THROTTLE VALVE; ASPHALT PLANT ENGINEER; AUTO GRADE OR SIMILAR TYPE MACHINE; AUTO | $44.60 | $23.35 | $67.95 Top 10% +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 3- ASSISTANT PLANT ENGINEER; BASE PAVER; CONCRETE FINISHING MACHINE; CONCRETE MIXER, LESS THAN 21 CU. FT.; CURB MACHI | $41.96 | $23.35 | $65.31 Top 10% +88% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 4- AIR COMPRESSOR; ASSISTANT TO ENGINEER, OILER; AUTOMATIC DRY BATCH PLANT; BITUMINOUS DISTRIBUTOR; BITUMINOUS PATCHI | $40.46 | $23.35 | $63.81 Top 10% +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP C- AIR COMPRESSOR, OILER; AUTOMATIC DRY BATCH PLANT; BITUMINOUS DISTRIBUTOR; BITUMINO | $42.02 | $19.60 | $61.62 Top 10% +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: HEAVY, HIGHWAY AND UTILITY CONSTRUCTION: GROUP 1 (AIR COMPRESSOR OVER 600 CU FT, AIR COMPRESSORS, COMPRESSORS HOOKED IN MAN | $38.80 | $27.15 | $65.95 Top 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: HEAVY, HIGHWAY AND UTILITY CONSTRUCTION: GROUP 2 AIR COMPRESSOR 600 CU. FT. AND UNDER, AIR TUGGER, AIR VALVES, ASSISTANT CO | $32.55 | $27.15 | $59.70 Top 10% +72% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS:: GROUP A | $46.80 | $19.60 | $66.40 Top 10% +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS:: GROUP B | $44.15 | $19.60 | $63.75 Top 10% +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PREMIUM FOR WORK ON STRUCTURES OVER 100 FT ABOVE FLOOR/GROUND LEVEL | $34.20 | $15.55 | $49.75 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $42.50 | $25.76 | $68.26 Top 10% +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $33.00 | $19.51 | $52.51 Above median +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $30.97 | $14.66 | $45.63 Above median +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $32.00 | $16.61 | $48.61 Above median +82% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $30.00 | $18.30 | $48.30 Above median +81% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: COMPOSITION | $34.55 | $21.04 | $55.59 Top 10% +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: COMPOSITION | $28.73 | $20.81 | $49.54 +85% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: COMPOSITION | $24.38 | $20.09 | $44.47 Bottom 10% +66% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: COMPOSITION | $31.60 | $19.43 | $51.03 Above median +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: SLATE & TILE | $36.05 | $21.04 | $57.09 Top 10% +113% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: SLATE & TILE | $28.95 | $20.81 | $49.76 +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: SLATE & TILE | $24.60 | $20.09 | $44.69 Bottom 10% +67% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: SLATE & TILE | $31.60 | $19.43 | $51.03 Above median +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $40.19 | $27.33 | $67.52 Above median +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $45.81 | $26.57 | $72.38 Above median +153% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $37.82 | $26.37 | $64.19 Above median +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $40.91 | $25.22 | $66.13 Above median +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO FINISHER | $23.38 | $13.15 | $36.53 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO FINISHER | $25.33 | $14.19 | $39.52 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO GRINDER FINISHER | $31.00 | $17.89 | $48.89 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER MECHANIC | $36.30 | $22.04 | $58.34 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER/SETTER | $36.38 | $17.24 | $53.62 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER/SETTER | $37.97 | $18.06 | $56.03 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE & MARBLE FINISHER | $25.33 | $14.19 | $39.52 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE & MARBLE FINISHER | $24.33 | $13.16 | $37.49 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE & MARBLE FINISHER | $25.33 | $14.19 | $39.52 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE & MARBLE SETTER; MOSAIC WORKER | $35.83 | $20.89 | $56.72 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE & MARBLE SETTER; MOSAIC WORKER | $35.63 | $17.23 | $52.86 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $29.08 | $17.32 | $46.40 Above median +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $29.08 | $17.32 | $46.40 Above median +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER & MARBLE MASON MECHANIC | $31.55 | $19.08 | $50.63 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE, MARBLE & TERRAZZO WORKER | $42.05 | $28.22 | $70.27 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE, MARBLE & TERRAZZO FINISHER | $31.55 | $19.08 | $50.63 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE, MARBLE SETTER | $35.63 | $17.23 | $52.86 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE, MARBLE SETTER | $37.22 | $18.05 | $55.27 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 1 SINGLE/BATCHES AXLE STRAIGHT TRUCKS; BATCH TRUCKS, WET OR DRY 3 AXLE OR LESS; SINGLE AXLE GREASE AND MAINTENANCE TRUCK | $34.69 | $20.51 | $55.20 Top 10% +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 2 SINGLE AXLE FUEL AND WATER TRUCKS | $34.74 | $20.51 | $55.25 Top 10% +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 3 SINGLE AXLE ""DOG-LEGS"", AND TANDEM TRUCK OR DOG- LEGS; WINCH TRUCKS OR A-FRAMES WHEN USED FOR TRANSPORTATION PURPOSES; DRIVERS | $34.79 | $20.51 | $55.30 Top 10% +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 4 TANDEM AXLE FUEL TRUCKS; TANDEM AXLE WATER TRUCKS; BUTUMINOUS DISTRIBUTORS | $34.84 | $20.51 | $55.35 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 5 TANDEM TRUCKS OVER 15 TONS PAYLOAD; SINGLE AXLE SEMI TRUCKS; FARM TRACTORS HAULING MATERIAL; MIXER TRUCKS; TRUCKS PULLING TILT-T | $34.89 | $20.51 | $55.40 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 6 TANDEM TRUCKS OR ""DOG-LEGS""; SEMI-WATER TRUCK; SPRINKLER TRUCK; HEAVY EQUIPMENT-TYPE WATER WAGONS, 5,000 GALLONS AND UNDER; BU | $34.94 | $20.51 | $55.45 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 7 TRI-AXLE TRUCKS; TANDEM AXLE SEMI TRUCKS; EQUIPMENT WHEN NOT SELF-LOADED OR PUSHER LOADED, SUCH AS KOEHRING OR SIMILAR DUMPSTERS | $34.99 | $20.51 | $55.50 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 8 TANDEM-TANDEM SEMI TRUCKS; TRUCK MECHANICS AND WELDERS; HEAVY EQUIPMENT-TYPE WATER WAGON OVER 5,000 GALLONS; TRI-AXLE TRUCKS PUL | $35.04 | $20.51 | $55.55 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 9 LOW-BOYS, TANDEM TRI-AXLE; ACEY WAGONS UP TO AND INCLUDING 3 BUCKETS; EQUIPMENT WHEN NOT SELF-LOADED OR PUSHER LOADED, SUCH AS K | $35.09 | $20.51 | $55.60 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP10 PICK-UP TRUCKS REMAINING COUNTIES | $34.54 | $20.51 | $55.05 Top 10% +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP11 HELPERS; GREASERS; TIRE MEN; BATCH BOARD TENDERS; WAREHOUSEMAN REMAINING COUNTIES | $35.09 | $20.51 | $55.60 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP12 ACEY WAGON; QUAD AXLE TRUCKS; ARTICULATING DUMP REMAINING COUNTIES | $35.19 | $20.51 | $55.70 Top 10% +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Warrick, IN — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Warrick
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Warrick, Indiana.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.