Building Construction — Vanderburgh, Indiana

WD IN20260003-16798-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ADDITIONAL ONE DOLLAR AND TWENTY FIVE CENTS PER HOUR ABOVE THE REGULAR RATE in Vanderburgh, Indiana (construction type: building) is $26.75/hr base + $23.00/hr fringe = $49.75/hr total package (WD IN20260003-16798-bld, Rev. 2).

Scroll down for all 76 trade classifications covered by this determination.

WD Number: IN20260003-16798-bld
Revision: 2
Construction Type: building
State: Indiana (IN)
County: Vanderburgh
Effective: May 17, 2026
Trades covered: 76
Official source: SAM.gov reference IN20260003View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ADDITIONAL ONE DOLLAR AND TWENTY FIVE CENTS PER HOUR ABOVE THE REGULAR RATE $26.75 $23.00 $49.75 Top 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AN FINISHES TO ALL TYPES OF ME $38.19 $23.59 $61.78 Top 10% +154% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF M $40.20 $25.68 $65.88 Top 10% +171% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.24 $38.17 $81.41 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON $34.17 $20.14 $54.31 Top 10% +57% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON $35.21 $18.19 $53.40 Above median +54% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: TERRAZZO FINISHER......................................$ 23.38 1,315.00 BRICKLAYER: TERRAZZO $27.50 $15.20 $42.70 Top 10% +23% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: TILE, MARBLE, MOSAIC $35.63 $17.23 $52.86 Top 10% +53% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: CARPENTER $33.09 $26.50 $59.59 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: CARPENTER $33.08 $26.46 $59.54 +105% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: PILEDRIVER $34.04 $26.50 $60.54 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: PILEDRIVER $34.08 $26.46 $60.54 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: SOFT FLOOR LAYERS $35.54 $22.12 $57.66 Top 10% +98% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $25.75 $13.50 $39.25 Above median +38% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $28.50 $13.50 $42.00 Above median +47% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $26.30 $16.91 $43.21 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
COMMUNICATION TECHNICIAN: INCLUDES THE INSTALLATION, OPERATION, INSPECTION, MAINTENANCE, REPAIR AND SERVICE OF RADIO, TELEVISION, RECORDING, VOICE SOU $30.00 $18.07 $48.07 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.00 $27.36 $67.36 Above median +114% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $43.30 $25.32 $68.62 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $46.14 $21.90 $68.04 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $45.45 $28.19 $73.64 Above median +134% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKS $60.17 $38.44 $98.61 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTES: A) EMPLOYER CONTRIBUTES AS A VACATION PAY CREDIT 8% BASIC HOURLY RATE FOR MORE THAN 5 YEARS OF SERVICE AND 6% BASIC HOURL $62.73 $38.44 $101.17 Top 10% +85% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $35.13 $19.57 $54.70 +97% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $36.03 $20.55 $56.58 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS $23.00 $14.40 $37.40 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $38.00 $26.39 $64.39 +80% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $35.34 $25.75 $61.09 +71% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: CAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 1: Cage Tenders, Dump Men, Flagman, Signalman, Top Laborers, Rod Men $23.18 $16.00 $39.18 Top 10% +65% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: CAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 2: Concrete Repairmen, Lock Tenders, Motor men, Muckers, Grout Machine, Track Laye $23.93 $16.00 $39.93 Top 10% +68% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: CAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 3: Mucking Machine, Laser Beam, Liner Plate & Ring Setter, Shield Drivers, Power K $24.18 $16.00 $40.18 Top 10% +69% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: CAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 4: Dynamite Men, Drillers air track or wagon drilling for explosives $24.18 $16.00 $40.18 Top 10% +69% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 BUILDING & CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; IRONWORKER TENDER; MECHANIC TENDER; CIVIL ENGINEER TENDER; RODMEN AND CHAINMEN $30.47 $19.20 $49.67 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; MECHANIC TENDERS; FLAG & SIGNAL PERSON; WINDOW WASHERS & CLEANERS; WATERBOYS $28.43 $18.55 $46.98 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 PLASTERERS' TENDERS; MORTAR MIXERS; WELDERS; CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATORS; SCAFFOLD BUILDER $29.18 $18.55 $47.73 Top 10% +100% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 WATERPROOFING; HANDLING OF CREOSOTE LUMBER OR LIKE TREATED MATERIAL; ASPHALT RAKER & LUTEMAN; KETTLEMAN; HANDLING AND REMOVAL HAZARD $31.07 $19.20 $50.27 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 DYNAMITE MEN; MASON TENDERS; DRILLERS-AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES LABORERS CLASSIFICATIONS FOR CAISSON AND TUNNEL WOR $30.43 $18.55 $48.98 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 PLASTERER TENDER; MASON TENDER; MORTAR MIXER; WELDER; CUTTING TORCH OR BURNER; CEMENT GUN OPERATOR; SCAFFOLD BUILDER $33.47 $19.20 $52.67 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 4 DYNAMITE MAN $33.97 $19.20 $53.17 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
MARBLE, TILE & TERRAZZO FINISHER $22.09 $16.34 $38.43 Top 10% $0.00 $0.00 $0.00 $0.00
MARBLE, TILE & TERRAZZO WORKERS $28.49 $16.46 $44.95 Top 10% $0.00 $0.00 $0.00 $0.00
MILLWRIGHT, ZONE 1 $36.30 $28.37 $64.67 Top 10% +78% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT, ZONE 2 $35.00 $29.33 $64.33 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH & ROLLER FOOTNOTE A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRUCTURES OV $31.20 $15.55 $46.75 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH & ROLLER FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL S $31.12 $21.20 $52.32 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: DRYWALL & PAPER HANGERS FOOTNOTE A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRU $33.20 $15.55 $48.75 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: DRYWALL FINISHERS FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE AL $31.87 $21.20 $53.07 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY & POT MAN FOOTNOTE A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRUCTURES O $32.20 $15.55 $47.75 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER: AREA #46 $31.50 $18.32 $49.82 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS $46.42 $21.33 $67.75 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS (CLAY, GREENE, PARKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) $46.65 $21.95 $68.60 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 POWER CRANES, DRAGLINES, DERRICKS, SHOVELS, GRADALLS, MECHANICS, TRACTOR HIGHLIFT, TOURNADOZER, CONCRETE MIXERS WIT $33.90 $23.00 $56.90 Top 10% +64% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP A A-FRAME WINCH TRUCK, ARTICULATING DUMP, AUTOGRADE, AUTO PATROL, BALLAST REGULATOR, BATCHER PLANT, BENDING MACHINE $43.43 $19.60 $63.03 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP B AIR COMPRESSOR, AIR COMPRESSOR WITH THROTTLE VALVE, BITUMINOUS DISTRUBTOR, BRAKEMAN, BULLFLOAT, CEMENT GUN, CONCRET $35.30 $19.60 $54.90 Top 10% +58% vs market $0.00 $0.00 $0.00 $0.00
PREMIUM FOR WORK ON STRUCTURES OVER 100 FT ABOVE FLOOR/GROUND LEVEL $34.20 $15.55 $49.75 Top 10% $0.00 $0.00 $0.00 $0.00
ROOFER $30.00 $18.30 $48.30 Above median +81% vs market $0.00 $0.00 $0.00 $0.00
ROOFERS $32.00 $16.61 $48.61 Above median +82% vs market $0.00 $0.00 $0.00 $0.00
ROOFERS: COMPOSITION $31.60 $19.43 $51.03 Bottom 10% +91% vs market $0.00 $0.00 $0.00 $0.00
ROOFERS: SLATE & TILE $31.60 $19.43 $51.03 Bottom 10% +91% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER HVAC DUCT WORK $39.53 $22.92 $62.45 Bottom 10% +118% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER HVAC DUCT WORK $40.19 $27.33 $67.52 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $44.20 $27.88 $72.08 Above median +132% vs market $0.00 $0.00 $0.00 $0.00
STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE $32.12 $21.20 $53.32 Top 10% $0.00 $0.00 $0.00 $0.00
TERRAZZO FINISHER $25.33 $14.19 $39.52 Above median $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $37.97 $18.06 $56.03 Above median $0.00 $0.00 $0.00 $0.00
THE COURT HOUSE)) $50.05 $20.39 $70.44 Top 10% $0.00 $0.00 $0.00 $0.00
TILE & MARBLE FINISHER $25.33 $14.19 $39.52 Top 10% $0.00 $0.00 $0.00 $0.00
TILE, MARBLE SETTER $37.22 $18.05 $55.27 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 1 PICKUP TRUCKS, WINCH TRUCKS, WAREHOUSEMAN, MECHANIC, STREET SWEEPERS, SINGLE AXLE TRUCKS $27.08 $21.52 $48.60 Top 10% +68% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 1 SINGLE AXLE TRUCKS SEVEN CU.YDS. OR LESS THAN TEN AND 0NE-HALF TONS, DUMPSTERS, SCOOP-MOBILES FIVE CU. YDS. AND UNDER OR LESS T $32.67 $0.42 $33.09 Top 10% +15% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 2 DRIVERS ON TANDEM AXLE EIGHTEEN CU.YDS.OR TWENTY- FOUR TONS GROSS, SIX WHEEL TRUCKS, KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCK $33.17 $0.42 $33.59 Top 10% +16% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 2 TANDEM TRUCKS OR DUMP TRUCKS; FARM TRACTOR PULLING TRAILER; BITUMINOUS DISTRIBUTORS, PAVEMENT BREAKERS $27.54 $21.52 $49.06 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 3 KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, SEMI- TRAILER WATER TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, TOURNAPULLS, TOURNATRAILERS $33.37 $0.42 $33.79 Top 10% +17% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 3 MIXER TRUCKS, ALL TYPES; LOWBOYS, ALL TYPES; SEMI- TRUCKS, ALL TYPES; ALL TRI-AXLE DUMP TRUCKS; ARTICULATED END DUMPS; END DUMP $27.76 $21.52 $49.28 Top 10% +71% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 4 DRIVERS ON HEAVY EQUIPMENT OVER SIXTEEN CU.YDS. OR TWENTY-FOUR TON, SUCH AS KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, EUCLID $33.52 $0.42 $33.94 Top 10% +17% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 5 MECHANIC FURNISHING HIS OWN TOOLS. A: $36.40 PER DAY & 450.00 PER WEEK $34.02 $0.42 $34.44 Top 10% +19% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Vanderburgh, IN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Vanderburgh

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IN20260003-16798-bld →