Heavy Construction — Sullivan, Indiana

WD IN20260006-15074-hvy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for (DUBOIS, GIBSON, PERRY, PIKE, LINE CONSTRUCTION: GROUNDMAN, CLASS A in Sullivan, Indiana (construction type: heavy) is $33.96/hr base + $19.04/hr fringe = $53.00/hr total package (WD IN20260006-15074-hvy, Rev. 2).

Scroll down for all 242 trade classifications covered by this determination.

WD Number: IN20260006-15074-hvy
Revision: 2
Construction Type: heavy
State: Indiana (IN)
County: Sullivan
Effective: May 17, 2026
Trades covered: 242
Official source: SAM.gov reference IN20260006View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
(DUBOIS, GIBSON, PERRY, PIKE, LINE CONSTRUCTION: GROUNDMAN, CLASS A $33.96 $19.04 $53.00 Top 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $56.02 $37.24 $93.26 Top 10% +284% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AN FINISHES TO ALL TYPES OF ME $38.19 $23.59 $61.78 Top 10% +154% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHINGS TO ALL TYPES OF $38.56 $18.70 $57.26 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES O $37.25 $19.85 $57.10 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES O $30.00 $20.89 $50.89 Bottom 10% +110% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYP $40.20 $25.68 $65.88 Top 10% +171% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKERS/INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHINGS TO ALL TYPES OF MECHANICAL S $35.23 $22.79 $58.02 Top 10% +139% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $35.34 $21.72 $57.06 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, CAULKER, CLEANER, POINTER $34.00 $19.71 $53.71 Top 10% +55% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONE MASON, POINTER, CAULKING $36.24 $17.39 $53.63 Top 10% +55% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON $35.21 $18.19 $53.40 Above median +54% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER $35.83 $20.89 $56.72 Top 10% +64% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER $33.75 $20.12 $53.87 Bottom 10% +56% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: BRICKLAYERS, STONE MASONS AND POINTER/ CLEANER/CAULKER $38.16 $18.22 $56.38 Top 10% +63% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: BRICKLAYERS, STONEMASONS AND CEMENT MASONS $33.70 $16.57 $50.27 Top 10% +45% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: CEMENT MASON $37.16 $18.22 $55.38 Top 10% +60% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: INCLUDING STONEMASON, AND POINTER, CAULKER & CLEANER $42.05 $28.22 $70.27 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: STONE MASON, MARBLE MASONS, POINTER, CLEANER, AND CAULKER $35.00 $21.60 $56.60 Top 10% +63% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: TERRAZO FINISHER $25.33 $14.19 $39.52 Top 10% +14% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: TERRAZZO WORKER $37.97 $18.06 $56.03 Top 10% +62% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: TILE LAYER, MARBLE MASON, MOSAIC WORKER $38.16 $18.22 $56.38 Top 10% +63% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $34.69 $25.59 $60.28 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $31.09 $28.53 $59.62 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $30.52 $29.11 $59.63 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $35.14 $25.10 $60.24 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $30.59 $29.03 $59.62 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $30.94 $29.08 $60.02 Above median +106% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $33.74 $25.84 $59.58 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $34.06 $25.67 $59.73 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $45.91 $35.90 $81.81 Top 10% +181% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $34.55 $25.59 $60.14 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER (BARTHOLOMEW, BROWN,, DECATUR, FRANKLIN, JOHNSON , RUSH AND SHELBY COUNTIES) $34.25 $25.59 $59.84 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER (HAMILTON, HANCOCK, HENDRICKS, JOHNSON, AND MARION COUNTIES) $35.80 $25.59 $61.39 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $25.75 $13.50 $39.25 Above median +38% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $28.50 $13.50 $42.00 Above median +47% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $23.38 $11.94 $35.32 Above median +24% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER (ELKHART, FULTON AND MARSHALL COUNTIES; PULASKI COUNTY) $31.50 $14.30 $45.80 Top 10% +61% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER (PULASKI, JASPER, ALL OF STARKE COUNTY) $36.01 $25.40 $61.41 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER: AREA #121 (BENTON, CARROLL, CASS, CLINTON, FOUNTAIN, HOWARD, MIAMI, MONTGOMERY, TIPPECANOE, WARREN, WHITE AND VERMILLI $33.50 $21.95 $55.45 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER: AREA #165 $41.24 $24.55 $65.79 Top 10% +131% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER: AREA #406 $43.72 $35.59 $79.31 Top 10% +178% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER: AREA #532 (BOONE, HAMILTON; HANCOCK COUNTY; HENDRICKS, JOHNSON, MARION AND MORGAN COUNTIES) $35.00 $20.61 $55.61 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER: AREA #566 $32.50 $20.77 $53.27 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER: AREA #821 $30.02 $18.20 $48.22 Top 10% +69% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER: AREA #83 $32.55 $22.04 $54.59 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER: AREA #83 (BLACKFORD, DELAWARE, GRANT, HAMILTON, HANCOCK, JAY, MADISON, TIPTON, AND WABASH COUNTIES) $32.55 $22.04 $54.59 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
COMMUNICATION TECHNICIAN $26.50 $18.33 $44.83 Above median $0.00 $0.00 $0.00 $0.00
COMMUNICATION TECHNICIAN $30.00 $18.07 $48.07 Top 10% $0.00 $0.00 $0.00 $0.00
CONCRETE PUMP; CONCRETE MESH DEPRESSOR, INDEPENDENTLY OPERATED; CONCRETE SPREADER, POWER-DRIVEN; END LOADER UNDER 1 1/2 CU. YD.; EXCAVATING LOADER, PO $42.88 $23.35 $66.23 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.04 $18.94 $59.98 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $33.98 $18.04 $52.02 +65% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $46.00 $29.23 $75.23 Above median +139% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $27.20 $14.54 $41.74 +33% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $38.05 $22.32 $60.37 Above median +92% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.18 $23.18 $63.36 Above median +101% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $36.00 $21.51 $57.51 +83% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.96 $22.44 $63.40 Above median +101% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $45.45 $28.19 $73.64 Above median +134% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $35.76 $18.96 $54.72 +74% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $27.64 $13.23 $40.87 +30% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.00 $27.36 $68.36 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.64 $20.46 $61.10 Above median +94% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $33.02 $16.10 $49.12 +56% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.50 $31.23 $72.73 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $48.10 $31.28 $79.38 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $43.30 $25.32 $68.62 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $39.20 $17.95 $57.15 +82% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.18 $22.15 $62.33 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $30.08 $17.23 $47.31 +50% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $42.02 $23.07 $65.09 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERANS DAY THANKSGIVING DAY AND CHRISTMAS DAY $42.00 $24.15 $66.15 Top 10% +110% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $53.55 $44.88 $98.43 Top 10% +255% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $31.95 $17.75 $49.70 +79% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $35.13 $19.57 $54.70 +97% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $29.50 $19.02 $48.52 +75% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $34.22 $24.67 $58.89 Above median +112% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $36.03 $20.55 $56.58 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER (JASPER AND NEWTON COUNTIES) $44.09 $30.73 $74.82 Top 10% +170% vs market $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, W $44.82 $34.00 $78.82 Top 10% $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS $38.56 $18.70 $57.26 Top 10% $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS $33.44 $21.84 $55.28 Top 10% $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS $35.10 $19.39 $54.49 Top 10% $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS $19.80 $13.30 $33.10 Bottom 10% $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS $25.00 $13.70 $38.70 Top 10% $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERI $23.00 $14.40 $37.40 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER (ADAMS, ALLEN, BLACKFORD, DEKALB, DELAWARE, FULTON, GRANT, HUNTINGTON, JAY, MIAMI, NOBLE, STEUBEN, WABASH, WELLS, AND WHITLEY COUNTIES) $35.40 $26.92 $62.32 Top 10% +75% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (BARTHOLOMEW, BENTON, BOONE, BROWN, CARROLL, CASS, CLAY, CLINTON, DAVIESS, DECATUR, DELAWARE, FAYETTE, FOUNTAIN,FRANKLIN, FULTON, GRANT, GR $38.00 $26.39 $64.39 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (CLARK, CRAWFORD, FLOYD, HARRISON, JACKSON; JEFFERSON; JENNINGS, LAWRENCE, MARTIN, ORANGE, PERRY; SCOTT AND WASHINGTON COUNTIES:) $36.17 $25.80 $61.97 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (DAVIESS, DUBOIS, GIBSON, KNOX, MARTIN, PERRY, PIKE, POSEY, SPENCER, VANDERBURGH, AND WARRICK) $35.34 $25.75 $61.09 Top 10% +71% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (ELKHART, FULTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, PULASKI, AND STARKE COUNTIES) $39.76 $25.00 $64.76 Top 10% +82% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (JASPER, NEWTON, PULASKI COUNTIES) $47.75 $41.28 $89.03 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING (DEARBORN, DECATUR, FAYETTE, FRANKLIN, OHIO, RIPLEY, SWITZERLAND AND JENNINGS COUNTIES) $36.17 $25.80 $61.97 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: SHEETER (JASPER, NEWTON, PULASKI COUNTIES) $48.00 $41.28 $89.28 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS: (FAYETTE, RANDOLPH UNION AND WAYNE COUNTIES) $35.39 $24.35 $59.74 Top 10% +67% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS: FENCE ERECTORS (DEARBORN, DECATUR, FAYETTE, FRANKLIN, JEFFERSON, JENNINGS, OHIO, RIPLEY, RUSH, SWITZERLAND, AND UNION) $35.88 $23.90 $59.78 Top 10% +68% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS: ORNAMENTAL (DEARBORN, DECATUR, FAYETTE, FRANKLIN, JEFFERSON, JENNINGS, OHIO, RIPLEY, RUSH, SWITZERLAND, AND UNION) $37.77 $23.90 $61.67 Top 10% +73% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS: STRUCTURAL, MACHINERY MOVERS, RIGGERS (DEARBORN, DECATUR, FAYETTE, FRANKLIN, JEFFERSON, JENNINGS, OHIO, RIPLEY, RUSH, SWITZERLAND, AND UN $37.77 $23.90 $61.67 Top 10% +73% vs market $0.00 $0.00 $0.00 $0.00
KOSCIUSKO, LAGRANGE, MARSHALL, NEWTON, NOBLE, PULASKI, AND STARKE COUNTIES) $24.30 $30.85 $55.15 Top 10% $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER, CARPENTER TENDER, FENCE ERECTOR, GRADE CHECKER, GUARD RAIL ERECTOR, CONTINUOUS S $33.45 $27.50 $60.95 Top 10% +156% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER, CARPENTER TENDER, FENCE ERECTOR, GRADE CHECKER, GUARD RAIL ERECTOR, CONTINUOUS S $30.68 $27.50 $58.18 Bottom 10% +144% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER, LASER BEAM ALIGNER, MANHOLE ERECTOR, SEWER PIPE LAYER, WATER LINE INSTALLER, TEM $33.75 $27.50 $61.25 Top 10% +157% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER, LASER BEAM ALIGNER, MANHOLE ERECTOR, SEWER PIPE LAYER, WATER LINE INSTALLER, TEM $30.98 $27.50 $58.48 Bottom 10% +146% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN, DYNAMITE AND POWDER MAN, CONCRETE BARRIER RAIL FORM SETTER, CONCRETE SAW $34.45 $27.50 $61.95 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN, DYNAMITE AND POWDER MAN, CONCRETE BARRIER RAIL FORM SETTER, CONCRETE SAW $31.68 $27.50 $59.18 Bottom 10% +149% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JO $28.50 $17.72 $46.22 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, T $29.00 $17.72 $46.72 Top 10% +96% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LE $29.50 $17.72 $47.22 Top 10% +98% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UTILITY CONSTRCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN; LI $30.65 $18.22 $48.87 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN; L $33.45 $27.50 $60.95 Top 10% +156% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN; L $30.68 $27.50 $58.18 Above median +144% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN; L $30.65 $18.00 $48.65 Bottom 10% +104% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY O $33.75 $27.50 $61.25 Top 10% +157% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY O $30.98 $27.50 $58.48 Above median +146% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY O $31.15 $18.00 $49.15 Bottom 10% +106% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY O $31.15 $18.22 $49.37 +107% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CON $34.45 $27.50 $61.95 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CON $31.68 $27.50 $59.18 Above median +149% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CON $31.65 $18.00 $49.65 Bottom 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; HOD $31.65 $18.00 $49.65 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; HOD CARRIER; GENERAL $31.65 $18.00 $49.65 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: EQUIPMENT OPERATOR $39.11 $17.13 $56.24 Bottom 10% +17% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN $25.90 $13.97 $39.87 Bottom 10% -17% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER $31.49 $16.93 $48.42 Top 10% +0% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN-EQUIPMENT OPERATOR $43.19 $21.81 $65.00 Top 10% +35% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: HEAVY-EQUIPMENT OPERATOR: ALL CRAWLER TYPE EQUIPMENT D-4 AND LARGER) $49.30 $23.64 $72.94 Top 10% +51% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN $60.15 $26.90 $87.05 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION:: LINEMAN $50.28 $22.38 $72.66 Bottom 10% +51% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION:: LINEMAN & CABLE SPLICERS $44.52 $18.43 $62.95 Top 10% +31% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $47.92 $37.23 $85.15 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $39.10 $26.94 $66.04 +81% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT (HAMILTON AND MARION COUNTIES, AND THE FOLLOWING TOWNSHIPS IN JOHNSON COUNTY: CAMP ATTERBURY, CLARK, PLEASANT, AND WHITE RIVER) $26.81 $19.28 $46.09 Top 10% +27% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT: ZONE 1: POSEY, VANDERBURGH AND WARRICK COUNTIES $36.30 $28.37 $64.67 Top 10% +78% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT: ZONE 2: GIBSON, GREENE AND SULLIVAN COUNTIES $35.00 $29.33 $64.33 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
NATURE), GUARDRAIL POST DRIVER, LEAD GREASER, HELICOPTER, HIGHLIFT SHOVEL, HOIST, HOIST, HYDRAULIC POWER UNITS HYDRO OR WATER BLASTER, LOCOMOTIVE OPER $48.70 $45.93 $94.63 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER BRUSH, ROLLER $31.02 $16.89 $47.91 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
PAINTER SPRAY AND SAND-BLASTING $30.52 $15.89 $46.41 Top 10% +93% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRIDGES, LEAD ABATEMENT $31.68 $14.46 $46.14 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER, DRYWALL TAPING & FINISHING, VINYL/PAPER HANGING $32.50 $19.86 $52.36 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER, PAPERHANGER, DRYWALL TAPING $30.34 $14.46 $44.80 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $31.15 $18.76 $49.91 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SANDBLASTING, WATERBLASTING $31.68 $14.46 $46.14 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $28.79 $14.46 $43.25 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $33.00 $19.86 $52.86 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY AND SANDBLASTING $32.10 $18.76 $50.86 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH & ROLLER $41.00 $31.26 $72.26 Top 10% +200% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH & ROLLER FOOTNOTE A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRUCTURES OV $31.20 $15.55 $46.75 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH & ROLLER FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL S $31.12 $21.20 $52.32 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH & ROLLER OF MASTICS, CREOSOTES, KEWINCH KOATE, & COAL TAR EPOXY FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL $31.12 $21.20 $52.32 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH AND ROLLER $41.00 $31.26 $72.26 Top 10% +200% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH, ROLLER & PAPERHANGER $37.42 $15.99 $53.41 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH, ROLLER, PAPERHANGER, & DRYWALL FINISHING $27.04 $16.27 $43.31 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH; ROLLER; PAPERHANGING; DRYWALL FINISHERS $25.10 $16.39 $41.49 Top 10% +73% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: DRYWALL FINISHERS FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE AL $31.87 $21.20 $53.07 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: DRYWALL TAPING & FINISHING $41.80 $31.26 $73.06 Top 10% +204% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: LEAD ABATEMENT $32.24 $16.27 $48.51 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY & POT MAN FOOTNOTE A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRUCTURES O $32.20 $15.55 $47.75 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY & SANDBLAST POT TENDERS AND GROUND PERSONNEL $27.04 $16.27 $43.31 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY, SANDBLAST & WATERBLAST $37.42 $15.99 $53.41 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST, & STEAM CLEANING $27.04 $16.27 $43.31 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY/WATERBLASTING; SANDBLASTING $26.10 $16.39 $42.49 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS:: SPRAY OF MASTICS CREOSOTES, KWINCH KOATE, COAL TAR EPOXY FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES O $32.12 $21.20 $53.32 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS:: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST & STEAM CLEANING FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES $32.12 $21.20 $53.32 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER (JASPER, AND NEWTON) $48.50 $31.12 $79.62 Top 10% +157% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $25.69 $11.75 $37.44 Bottom 10% +52% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER: AREA #121 (BENTON, CARROLL, CASS, CLINTON, FOUNTAIN, HOWARD, MIAMI, MONTGOMERY, TIPPECANOE, WARREN, WHITE AND VERMILLION COUNTIES) $33.76 $20.05 $53.81 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER: AREA #46 $31.50 $18.32 $49.82 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER: AREA #83 $30.60 $17.19 $47.79 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER: AREA #83 (BLACKFORD, DELAWARE, GRANT, HAMILTON, HANCOCK, JAY, MADISON, TIPTON, AND WABASH COUNTIES) $30.60 $17.19 $47.79 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER (JASPER AND NEWTON COUNTIES) $49.77 $28.56 $78.33 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER AND STEAMFITTER $45.06 $23.16 $68.22 Bottom 10% +120% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER AND STEAMFITTER $50.05 $20.39 $70.44 Above median +127% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTER, STEAMFITTER (JASPER, MARSHALL, PULASKI AND STARKE COUNTIES) $44.93 $23.03 $67.96 Top 10% +119% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $32.00 $20.13 $52.13 +68% vs market $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS $46.42 $21.33 $67.75 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS $46.65 $23.45 $70.10 Above median +126% vs market $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS $40.70 $29.52 $70.22 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS (BARTHOLOMEW, BOONE, HAMILTON, HANCOCK, HENDRICKS, HOWARD, JOHNSON AND MARION COUNTIES; MIAMI COUNTY; MORGAN, SHELBY AND TIPT $50.05 $20.39 $70.44 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION: GROUP 4 AIR COMPRESSOR; ASSISTANT TO ENGINEER, OILER; BITUMINOUS PATCHING TAMPER $34.55 $36.65 $71.20 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION:GROUP 3 PLANT ENGINEER; BASE PAVER; CONCRETE FINISHING MACHINE; CONCRETE MIXER, LES $35.95 $36.65 $72.60 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 2 COMBINATION BACKHOE FRONT END LOADER MACHINE WITH LESS THAN 1/2 CU. YD., BACKHOE $47.90 $45.93 $93.83 Top 10% +170% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 3 BACK FILLER, BITUMINOUS DISTRIBUTOR, BROOM AND BELT MACHINE, BULL FLOAT, COMPRES $43.60 $45.93 $89.53 Top 10% +157% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 4 AIR COMPRESSORS, CONVEYOR, FIREMAN ON BOILER, GENERATOR, GROUT MACHINE, POWER CU $41.40 $45.93 $87.33 Top 10% +151% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 5 DECK HAND, HETHERINGTON DRIVER, MECHANICAL HEATER, OUTBOARD OR INBOARD MOTOR BOA $35.95 $45.93 $81.88 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION: GROUP 1 AIR COMPRESSORS IN MANIFOLD WITH THROTTLE VALVE; ASPHALT PLANT ENGINEER; A $38.85 $36.65 $75.50 Top 10% +117% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION: GROUP 2 AIR COMPRESSOR WITH THROTTLE VALVE OR CLEVER BROOKS TYPE COMBINATION; BACK $37.25 $36.65 $73.90 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1- AIR COMPRESSORS IN MANIFOLD WITH THROTTLE VALVE; ASPHALT PLANT ENGINEER; AUTO GRADE OR SIMILAR TYPE MACHINE; AUTO $44.60 $23.35 $67.95 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3- ASSISTANT PLANT ENGINEER; BASE PAVER; CONCRETE FINISHING MACHINE; CONCRETE MIXER, LESS THAN 21 CU. FT.; CURB MACHI $41.96 $23.35 $65.31 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4- AIR COMPRESSOR; ASSISTANT TO ENGINEER, OILER; AUTOMATIC DRY BATCH PLANT; BITUMINOUS DISTRIBUTOR; BITUMINOUS PATCHI $40.46 $23.35 $63.81 Top 10% +83% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP C- AIR COMPRESSOR, OILER; AUTOMATIC DRY BATCH PLANT; BITUMINOUS DISTRIBUTOR; BITUMINO $42.02 $19.60 $61.62 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: HEAVY, HIGHWAY AND UTILITY CONSTRUCTION: GROUP 1 (AIR COMPRESSOR OVER 600 CU FT, AIR COMPRESSORS, COMPRESSORS HOOKED IN MAN $38.80 $27.15 $65.95 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: HEAVY, HIGHWAY AND UTILITY CONSTRUCTION: GROUP 2 AIR COMPRESSOR 600 CU. FT. AND UNDER, AIR TUGGER, AIR VALVES, ASSISTANT CO $32.55 $27.15 $59.70 Top 10% +72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS:: GROUP A $46.80 $19.60 $66.40 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS:: GROUP B $44.15 $19.60 $63.75 Top 10% +83% vs market $0.00 $0.00 $0.00 $0.00
PREMIUM FOR WORK ON STRUCTURES OVER 100 FT ABOVE FLOOR/GROUND LEVEL $34.20 $15.55 $49.75 Top 10% $0.00 $0.00 $0.00 $0.00
ROOFER $42.50 $25.76 $68.26 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $33.00 $19.51 $52.51 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $30.97 $14.66 $45.63 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $32.00 $16.61 $48.61 Above median +82% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $30.00 $18.30 $48.30 Above median +81% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: COMPOSITION $34.55 $21.04 $55.59 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: COMPOSITION $28.73 $20.81 $49.54 +85% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: COMPOSITION $24.38 $20.09 $44.47 Bottom 10% +66% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: COMPOSITION $31.60 $19.43 $51.03 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: SLATE & TILE $36.05 $21.04 $57.09 Top 10% +113% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: SLATE & TILE $28.95 $20.81 $49.76 +86% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: SLATE & TILE $24.60 $20.09 $44.69 Bottom 10% +67% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: SLATE & TILE $31.60 $19.43 $51.03 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $40.19 $27.33 $67.52 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $45.81 $26.57 $72.38 Above median +153% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $37.82 $26.37 $64.19 Above median +124% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $40.91 $25.22 $66.13 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
TERRAZZO FINISHER $23.38 $13.15 $36.53 Bottom 10% $0.00 $0.00 $0.00 $0.00
TERRAZZO FINISHER $25.33 $14.19 $39.52 Above median $0.00 $0.00 $0.00 $0.00
TERRAZZO GRINDER FINISHER $31.00 $17.89 $48.89 Top 10% $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER MECHANIC $36.30 $22.04 $58.34 Top 10% $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $36.38 $17.24 $53.62 Bottom 10% $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $37.97 $18.06 $56.03 Above median $0.00 $0.00 $0.00 $0.00
TILE & MARBLE FINISHER $25.33 $14.19 $39.52 Above median $0.00 $0.00 $0.00 $0.00
TILE & MARBLE FINISHER $24.33 $13.16 $37.49 Above median $0.00 $0.00 $0.00 $0.00
TILE & MARBLE FINISHER $25.33 $14.19 $39.52 Top 10% $0.00 $0.00 $0.00 $0.00
TILE & MARBLE SETTER; MOSAIC WORKER $35.83 $20.89 $56.72 Top 10% $0.00 $0.00 $0.00 $0.00
TILE & MARBLE SETTER; MOSAIC WORKER $35.63 $17.23 $52.86 Above median $0.00 $0.00 $0.00 $0.00
TILE FINISHER $29.08 $17.32 $46.40 Above median +94% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $29.08 $17.32 $46.40 Above median +94% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER & MARBLE MASON MECHANIC $31.55 $19.08 $50.63 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
TILE, MARBLE & TERRAZZO WORKER $42.05 $28.22 $70.27 Above median $0.00 $0.00 $0.00 $0.00
TILE, MARBLE & TERRAZZO FINISHER $31.55 $19.08 $50.63 Top 10% $0.00 $0.00 $0.00 $0.00
TILE, MARBLE SETTER $35.63 $17.23 $52.86 Bottom 10% $0.00 $0.00 $0.00 $0.00
TILE, MARBLE SETTER $37.22 $18.05 $55.27 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1 SINGLE/BATCHES AXLE STRAIGHT TRUCKS; BATCH TRUCKS, WET OR DRY 3 AXLE OR LESS; SINGLE AXLE GREASE AND MAINTENANCE TRUCK $34.69 $20.51 $55.20 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2 SINGLE AXLE FUEL AND WATER TRUCKS $34.74 $20.51 $55.25 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3 SINGLE AXLE ""DOG-LEGS"", AND TANDEM TRUCK OR DOG- LEGS; WINCH TRUCKS OR A-FRAMES WHEN USED FOR TRANSPORTATION PURPOSES; DRIVERS $34.79 $20.51 $55.30 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4 TANDEM AXLE FUEL TRUCKS; TANDEM AXLE WATER TRUCKS; BUTUMINOUS DISTRIBUTORS $34.84 $20.51 $55.35 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 5 TANDEM TRUCKS OVER 15 TONS PAYLOAD; SINGLE AXLE SEMI TRUCKS; FARM TRACTORS HAULING MATERIAL; MIXER TRUCKS; TRUCKS PULLING TILT-T $34.89 $20.51 $55.40 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 6 TANDEM TRUCKS OR ""DOG-LEGS""; SEMI-WATER TRUCK; SPRINKLER TRUCK; HEAVY EQUIPMENT-TYPE WATER WAGONS, 5,000 GALLONS AND UNDER; BU $34.94 $20.51 $55.45 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 7 TRI-AXLE TRUCKS; TANDEM AXLE SEMI TRUCKS; EQUIPMENT WHEN NOT SELF-LOADED OR PUSHER LOADED, SUCH AS KOEHRING OR SIMILAR DUMPSTERS $34.99 $20.51 $55.50 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 8 TANDEM-TANDEM SEMI TRUCKS; TRUCK MECHANICS AND WELDERS; HEAVY EQUIPMENT-TYPE WATER WAGON OVER 5,000 GALLONS; TRI-AXLE TRUCKS PUL $35.04 $20.51 $55.55 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 9 LOW-BOYS, TANDEM TRI-AXLE; ACEY WAGONS UP TO AND INCLUDING 3 BUCKETS; EQUIPMENT WHEN NOT SELF-LOADED OR PUSHER LOADED, SUCH AS K $35.09 $20.51 $55.60 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP10 PICK-UP TRUCKS REMAINING COUNTIES $34.54 $20.51 $55.05 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP11 HELPERS; GREASERS; TIRE MEN; BATCH BOARD TENDERS; WAREHOUSEMAN REMAINING COUNTIES $35.09 $20.51 $55.60 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP12 ACEY WAGON; QUAD AXLE TRUCKS; ARTICULATING DUMP REMAINING COUNTIES $35.19 $20.51 $55.70 Top 10% +93% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Sullivan, IN — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.