Building Construction — Spencer, Indiana

WD IN20260012-16797-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Spencer, Indiana (construction type: building) is $12.43/hr base + $3.18/hr fringe = $15.61/hr total package (WD IN20260012-16797-bld, Rev. 2).

Scroll down for all 10 trade classifications covered by this determination.

WD Number: IN20260012-16797-bld
Revision: 2
Construction Type: building
State: Indiana (IN)
County: Spencer
Effective: May 17, 2026
Trades covered: 10
Official source: SAM.gov reference IN20260012View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $12.43 $3.18 $15.61 -46% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $31.25 $19.71 $50.96 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $11.99 $1.93 $13.92 Bottom 10% -56% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $10.00 $0.88 $10.88 Bottom 10% -70% vs market $0.00 $0.00 $0.00 $0.00
LABORER $30.47 $19.20 $49.67 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $46.42 $21.33 $67.75 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $17.83 $3.50 $21.33 -31% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $14.11 $2.74 $16.85 Above median -52% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $36.12 $20.82 $56.94 Above median +113% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $40.19 $27.33 $67.52 Above median +136% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Spencer, IN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Spencer

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IN20260012-16797-bld →