Building Construction — Scott, Indiana

WD IN20260010-15306-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Scott, Indiana (construction type: building) is $9.73/hr base + $1.20/hr fringe = $10.93/hr total package (WD IN20260010-15306-bld, Rev. 1).

Scroll down for all 16 trade classifications covered by this determination.

WD Number: IN20260010-15306-bld
Revision: 1
Construction Type: building
State: Indiana (IN)
County: Scott
Effective: May 17, 2026
Trades covered: 16
Official source: SAM.gov reference IN20260010View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $9.73 $1.20 $10.93 Bottom 10% -68% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $10.24 $0.00 $10.24 Bottom 10% -65% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $16.20 $2.93 $19.13 -38% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $10.00 $0.58 $10.58 Bottom 10% -66% vs market $0.00 $0.00 $0.00 $0.00
HOD CARRIER $12.90 $4.30 $17.20 Bottom 10% $0.00 $0.00 $0.00 $0.00
HOD CARRIER $14.38 $4.30 $18.68 Bottom 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $10.00 $0.00 $10.00 Bottom 10% -72% vs market $0.00 $0.00 $0.00 $0.00
LABORER $9.43 $2.19 $11.62 -51% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $7.25 $0.00 $7.25 Bottom 10% -70% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $10.75 $0.66 $11.41 Bottom 10% -63% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $14.14 $2.71 $16.85 -46% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $11.06 $0.00 $11.06 Above median -68% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BULLDOZER $9.00 $0.00 $9.00 -74% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: LOADER $14.67 $0.00 $14.67 Above median -58% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $10.00 $0.00 $10.00 Bottom 10% -65% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $12.87 $0.00 $12.87 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Scott, IN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Scott

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IN20260010-15306-bld →