Building Construction — Pike, Indiana

WD IN20260014-16791-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER in Pike, Indiana (construction type: building) is $43.24/hr base + $38.17/hr fringe = $81.41/hr total package (WD IN20260014-16791-bld, Rev. 2).

Scroll down for all 22 trade classifications covered by this determination.

WD Number: IN20260014-16791-bld
Revision: 2
Construction Type: building
State: Indiana (IN)
County: Pike
Effective: May 17, 2026
Trades covered: 22
Official source: SAM.gov reference IN20260014View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $43.24 $38.17 $81.41 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $21.10 $15.08 $36.18 +4% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, POINTER CAULKER AND STONEMASON $34.17 $20.14 $54.31 +57% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: TERRAZZO AND MOSAIC WORKER $27.50 $15.20 $42.70 +23% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDING DRYWALL HANGING $33.09 $26.50 $59.59 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $10.15 $0.89 $11.04 -61% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $46.14 $21.90 $68.04 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $15.94 $2.74 $18.68 Bottom 10% -33% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL REINFORCING $35.34 $25.75 $61.09 +71% vs market $0.00 $0.00 $0.00 $0.00
LABORER $30.47 $19.20 $49.67 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: DRYWALL FINISHERS FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE AL $30.37 $19.32 $49.69 Bottom 10% +107% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $15.14 $0.35 $15.49 Bottom 10% -37% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $32.26 $13.70 $45.96 Above median +48% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTERS $46.42 $21.33 $67.75 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $10.54 $1.84 $12.38 Above median -64% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: CRANE, FRONT END LOADER, & OILER $32.25 $23.00 $55.25 +59% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $9.10 $1.24 $10.34 -61% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $40.19 $27.33 $67.52 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE $30.62 $19.32 $49.94 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 1 PICKUP TRUCKS, WINCH TRUCKS,WAREHOUSEMAN, MECHANIC, STREET SWEEPERS, SINGLE AXLE TRUCKS $28.98 $21.82 $50.80 +76% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 2 TANDEM TRUCKS OR DUMP TRUCKS; FARM TRACTOR-PULLING TRAILER; BITUMINOUS DISTRIBUTORS, PAVEMENT BREAKERS $29.44 $21.82 $51.26 +77% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 3 MIXER TRUCKS, ALL TYPES; LOWBOYS, ALL TYPES; SEMI-TRUCKS, ALL TYPES; ALL TRI-AXLE DUMP TRUCKS; ARTICULATED END DUMPS; END DUMPS $29.66 $21.82 $51.48 Top 10% +78% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Pike, IN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Pike

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IN20260014-16791-bld →