Building Construction — Orange, Indiana

WD IN20260015-16789-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTERS, INCLUDING DRYWALL HANGING in Orange, Indiana (construction type: building) is $31.38/hr base + $26.27/hr fringe = $57.65/hr total package (WD IN20260015-16789-bld, Rev. 1).

Scroll down for all 14 trade classifications covered by this determination.

WD Number: IN20260015-16789-bld
Revision: 1
Construction Type: building
State: Indiana (IN)
County: Orange
Effective: May 17, 2026
Trades covered: 14
Official source: SAM.gov reference IN20260015View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTERS, INCLUDING DRYWALL HANGING $31.38 $26.27 $57.65 +98% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS, INCLUDING DRYWALL HANGING $31.48 $25.46 $56.94 +96% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $9.24 $1.82 $11.06 -61% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $46.14 $21.90 $68.04 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.96 $22.44 $63.40 Above median +101% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UNSKILLED $28.38 $18.55 $46.93 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UNSKILLED $26.40 $18.90 $45.30 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH ONLY $31.02 $16.86 $47.88 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH $24.46 $15.85 $40.31 Bottom 10% +68% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER: AREA #46 $31.50 $18.32 $49.82 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $46.42 $21.33 $67.75 +118% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $14.38 $3.32 $17.70 Above median -49% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BULLDOZER $15.54 $3.38 $18.92 Above median -46% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $20.67 $7.00 $27.67 -3% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Orange, IN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Orange

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IN20260015-16789-bld →