Building Construction — Martin, Indiana
WD IN20260008-16787-bld · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BRICKLAYER: BRICKLAYER; STONE MASON & POINTER, CAULKER, CLEANER in Martin, Indiana (construction type: building) is $36.24/hr base + $17.39/hr fringe = $53.63/hr total package (WD IN20260008-16787-bld, Rev. 2).
Scroll down for all 15 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER: BRICKLAYER; STONE MASON & POINTER, CAULKER, CLEANER | $36.24 | $17.39 | $53.63 +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: MARBLE AND TILE SETTER | $36.24 | $17.39 | $53.63 +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: TERRAZZO FINISHER | $23.38 | $13.15 | $36.53 Bottom 10% +5% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: TILE AND MARBLE FINISHER | $24.33 | $13.16 | $37.49 +8% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $33.08 | $26.46 | $59.54 Above median +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $31.25 | $19.71 | $50.96 Above median +79% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $46.14 | $21.90 | $68.04 Above median +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR CONSTRUCTOR | $19.90 | $5.57 | $25.47 Bottom 10% -53% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: UNSKILLED | $30.47 | $19.20 | $49.67 +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: UNSKILLED | $28.38 | $18.55 | $46.93 +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 10 | $31.12 | $21.20 | $52.32 +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $32.26 | $13.70 | $45.96 Above median +48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PIPEFITTERS | $46.42 | $21.33 | $67.75 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $36.12 | $20.82 | $56.94 Above median +113% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $40.19 | $27.33 | $67.52 Above median +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Martin, IN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Martin
Compliance Notes
- This wage determination applies to federal contracts for building construction in Martin, Indiana.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.