Heavy Construction — La Porte, Indiana

WD IN20260001-15048-hvy · Revision 3 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in La Porte, Indiana (construction type: heavy) is $56.02/hr base + $37.24/hr fringe = $93.26/hr total package (WD IN20260001-15048-hvy, Rev. 3).

Scroll down for all 120 trade classifications covered by this determination.

WD Number: IN20260001-15048-hvy
Revision: 3
Construction Type: heavy
State: Indiana (IN)
County: La Porte
Effective: May 17, 2026
Trades covered: 120
Official source: SAM.gov reference IN20260001View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $56.02 $37.24 $93.26 Top 10% +284% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $41.20 $30.93 $72.13 Above median +197% vs market $0.00 $0.00 $0.00 $0.00
BENOTO (REQUIRES 2 ENGINEERS; BOILER & THROTTLE VALVE; BORING MACHINE; CAISSON RIGS; CENTRAL REDI-MIX PLANT; COMBINATION BACKHOE ENDLOADER WITH BACKHO $48.70 $45.93 $94.63 Top 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $58.91 $39.75 $98.66 Top 10% +146% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.24 $38.17 $81.41 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: MARBLE AND TILE FINISHER $33.00 $21.84 $54.84 Top 10% +58% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: MARBLE FINISHER; TILE FINISHER $34.00 $21.84 $55.84 Top 10% +61% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: TERRAZZO FINISHER $33.00 $21.84 $54.84 Top 10% +58% vs market $0.00 $0.00 $0.00 $0.00
BY EMPLOYEES WITHING THIS BARGAINING UNIT. SIX WHEEL POLE TRAILERS AND ONE MAN OIL DISTRIBUTORS, FORK-LIFT OVER FOUR TON AND MOBILE MIXERS. A: $37.90 $33.37 $0.00 $33.37 Top 10% $0.00 $0.00 $0.00 $0.00
CARPENTER $34.70 $25.98 $60.68 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $45.91 $35.90 $81.81 Top 10% +181% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER: BUILDING CONSTRUCTION $28.84 $14.48 $43.32 Top 10% +52% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER: BUILDING CONSTRUCTION (LAKE COUNTY AND PORTER COUNTIES) $35.48 $21.68 $57.16 Top 10% +101% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY CONSTRUCTION (LAKE COUNTY AND PORTER COUNTIES) $32.00 $15.74 $47.74 Top 10% +68% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY CONSTRUCTION (LAKE COUNTY) $33.94 $13.80 $47.74 Top 10% +68% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER: HEAVY/HIGHWAY $31.50 $14.30 $45.80 Top 10% +61% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON: BUILDING CONSTRUCTION $36.01 $25.40 $61.41 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
COMMUNICATION TECHNICIAN- INCLUDES THE INSTALLATION, OPERATION, INSPECTION, MODIFICATION, MAINTENANCE AND REPAIR OF SYSTEMS USED FOR THE TRANSMISSION $26.50 $18.33 $44.83 Top 10% $0.00 $0.00 $0.00 $0.00
COMPRESSOR, GENERATOR, HEATERS, MECHANICAL, HOISTS, HOIST, HOIST, OILERS, PUMPS, WELL POINTS AND ELECTRIC SUBMERSIBLE, SMALL RUBBER TIRED END LOADERS $33.20 $38.65 $71.85 Top 10% $0.00 $0.00 $0.00 $0.00
COUNTY) $36.15 $38.65 $74.80 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $49.00 $32.89 $81.89 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $52.00 $32.85 $84.85 Top 10% +170% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDES THE INSTALLATION, OPERATION, INSPECTION, MODIFICATION, MAINTENANCE AND REPAIR OF SYSTEMS USED FOR THE TRANSMISSION AND RECEPTION $46.00 $29.23 $75.23 Top 10% +139% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $53.55 $44.88 $98.43 Top 10% +255% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $34.22 $24.67 $58.89 Above median +112% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER (LAKE, LAPORTE AND PORTER COUNTIES) $44.09 $30.63 $74.72 Top 10% +169% vs market $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, W $44.82 $34.00 $78.82 Top 10% $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING, AND DISPOSAL OF ALL INSULATION MATERIALS $41.20 $30.93 $72.13 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER (ST. JOSEPH AND LAPORTE COUNTIES) $39.76 $25.00 $64.76 Top 10% +82% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: SHEETER (LAKE, PORTER AND LAPORTE $48.00 $41.28 $89.28 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL & ORNAMENTAL (LAKE, PORTER AND LAPORTE $47.75 $41.28 $89.03 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: BUILDING CONSTRUCTION: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; RAILROAD WORKERS, MASONRY WALL WORKERS,; PORTABLE WATE $39.26 $28.90 $68.16 Top 10% +186% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: BUILDING CONSTRUCTION: GROUP 2 PLASTER TENDERS, MASONS TENDERS; MORTAR MIXERS; WELDERS; CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEM $40.01 $28.90 $68.91 Top 10% +189% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: BUILDING CONSTRUCTION: GROUP 3 DYNAMITE MEN; DRILLERS, AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES. (LAKE COUNTY) $40.26 $28.90 $69.16 Top 10% +190% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: CAISSON AND TUNNEL WORK (LAKE COUNTY) Premium for all employees working in compressed air shall be as follows: 0 - 15 lbs. $1.00 per hour 16 $40.30 $28.90 $69.20 Top 10% +191% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; MECHANIC TENDERS; RODMEN AND CHAINMEN, RAILROAD WORKERS, MASONRY WALL WORKERS $39.89 $30.30 $70.19 Top 10% +195% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN; LIGHTING INSTALLER; LIN $27.40 $17.22 $44.62 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY OR PERMANENT; WELDER IN $27.90 $17.22 $45.12 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 PLASTER TENDERS, MASONS TENDERS; MORTAR MIXERS; WELDERS; CUTTING TORCH OR BURNER; CEMENT NOZZLE; CEMENT GUN; SCAFFOLD BUILDERS WHEN $40.64 $30.30 $70.94 Top 10% +198% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 AIR TRACK AND WAGE DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CONCRETE SAW JOINT CUTTING $28.40 $17.22 $45.62 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 DYNAMITE MEN; DRILLERS, AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES; LABORER SPECIALIST (LAKE, LA PORTE, AND PORTER COUNTIES) $40.89 $30.30 $71.19 Top 10% +199% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; CARPENTER TENDER; FENCE ERECTOR; GRADE CHECKER; GUARD RAIL ERECTOR; CONTINUOUS $33.45 $27.50 $60.95 Top 10% +156% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER: LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, T $33.75 $27.50 $61.25 Top 10% +157% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; DYNAMITE AND POWDER MAN; CONCRETE BARRIER RAIL FORM SETTER; GENERAL LA $34.45 $27.50 $61.95 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER, CARPENTER TENDER, FENCE ERECTOR, GRADE CHECKER, GUARD RAIL ERECTOR, CONTINUOUS STEEL ROD $33.45 $27.50 $60.95 Top 10% +156% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER, LASER BEAM ALIGNER, MANHOLE ERECTOR, SEWER PIPE LAYER, WATER LINE INSTALLER, TEMPORARY O $33.75 $27.50 $61.25 Top 10% +157% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY O $33.75 $27.50 $61.25 Top 10% +157% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN, DYNAMITE AND POWDER MAN, CONCRETE BARRIER RAIL FORM SETTER, CONCRETE SAW JOINT C $34.45 $27.50 $61.95 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
LABORERS:: GROUP 1 $29.88 $18.70 $48.58 Bottom 10% +104% vs market $0.00 $0.00 $0.00 $0.00
LABORERS:: GROUP 1 $30.65 $18.00 $48.65 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
LABORERS:: GROUP 1.$ 33.45 27.50 LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND $34.45 $27.50 $61.95 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
LABORERS:: GROUP 2 $30.38 $18.70 $49.08 Bottom 10% +106% vs market $0.00 $0.00 $0.00 $0.00
LABORERS:: GROUP 2 $31.15 $18.00 $49.15 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
LABORERS:: GROUP 3 $31.88 $18.70 $50.58 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORERS:: GROUP 3 $31.65 $18.00 $49.65 Bottom 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LAPORTE, AND PORTER COUNTIES) $43.60 $45.93 $89.53 Top 10% $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION:: EQUIPMENT OPERATOR 1: (LAKE & PORTER COUNTIES) $38.33 $18.92 $57.25 Top 10% +19% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION:: GROUNDMAN (LAKE & PORTER COUNTIES) $31.49 $16.71 $48.20 Top 10% +0% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION:: GROUNDMAN-TRUCK DRIVER (LAKE & PORTER COUNTIES) $31.49 $16.71 $48.20 Top 10% +0% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION:: LINEMAN (LAKE & PORTER COUNTIES) $50.28 $22.16 $72.44 Top 10% +50% vs market $0.00 $0.00 $0.00 $0.00
MECHANICAL; OILERS; SWITCHMEN $41.40 $45.93 $87.33 Top 10% $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $47.92 $37.23 $85.15 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $35.89 $30.52 $66.41 +82% vs market $0.00 $0.00 $0.00 $0.00
NATURE), GUARDRAIL POST DRIVER, LEAD GREASER, HELICOPTER, HIGHLIFT SHOVEL, HOIST, HOIST, HYDRAULIC POWER UNITS HYDRO OR WATER BLASTER, LOCOMOTIVE OPER $49.05 $43.40 $92.45 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR), .CONVEYOR, GROUTING MACHINE, HOIST ELEVATORS, HYDRAULIC POWER UNITS, GROUTING AND PILE DRIVING, STUD WELDER, TRENCHING MACHINES LESS THAN 1 $34.00 $38.65 $72.65 Top 10% $0.00 $0.00 $0.00 $0.00
OR PUSHER LOADED, SUCH AS KOEHRING OR SIMILAR DUMPSTERS, TRACK TRUCKS, EUCLID BOTTOM DUMP AND HUG BOTTOM DUMP, TOURNATRAILERS, TOURNAROCKERS, ACEY WAG $35.09 $20.51 $55.60 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER, DRYWALL TAPING & FINISHING, VINYL/PAPER HANGING (LA PORTE; ST. JOSEPH COUNTIES) $32.50 $19.86 $52.36 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY (LA PORTE; ST. JOSEPH COUNTIES) $33.00 $19.86 $52.86 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: DRYWALL FINISHING) $41.00 $31.26 $72.26 Top 10% +200% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: PAINTER) $41.00 $31.26 $72.26 Top 10% +200% vs market $0.00 $0.00 $0.00 $0.00
PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF SERVICE, AND 6% OF REGULAR HOURLY RATE FOR LESS THAN 5 YEARS OF SERVICE $70.68 $38.44 $109.12 Top 10% $0.00 $0.00 $0.00 $0.00
PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF SERVICE; 6% FOR LESS THAN 5 YEARS' SERVICE $62.27 $38.44 $100.71 Top 10% $0.00 $0.00 $0.00 $0.00
PIPEFITTER (LAKE, LA PORTE, PORTER) $48.50 $31.12 $79.62 Top 10% +157% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER (LAKE COUNTY AND PORTER COUNTIES) $33.28 $17.32 $50.60 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER (LAKE COUNTY) $32.70 $17.70 $50.40 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER: BUILDING CONSTRUCTION $26.81 $12.40 $39.21 Top 10% +59% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER (LAKE, LAPORTE AND PORTER COUNTIES) $49.77 $28.56 $78.33 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTER, STEAMFITTER (LA PORTE COUNTY AND ST. JOSEPH COUNTIES) $44.93 $0.00 $44.93 Top 10% +45% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 5 FORK LIFTS $35.95 $45.93 $81.88 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 2 COMBINATION BACKHOE FRONT END LOADER MACHINE WITH LESS THAN 1/2 CU. YD., BACKHOE BUCKET OR WITH ATTACH $48.60 $43.40 $92.00 Top 10% +164% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 3 BACK FILLER, BITUMINOUS DISTRIBUTOR, BROOM AND BELT MACHINE, BULL FLOAT, COMPRESSOR, CONCRETE CUTTER W $48.15 $43.40 $91.55 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 4 AIR COMPRESSORS, CONVEYOR, FIREMAN ON BOILER, GENERATOR, GROUT MACHINE, POWER CURING SPRAYING MACHINE $46.95 $43.40 $90.35 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 5 DECK HAND, HETHERINGTON DRIVER, MECHANICAL HEATER, OUTBOARD OR INBOARD MOTOR BOAT, OILER, POWER SAW, W $45.90 $43.40 $89.30 Top 10% +157% vs market $0.00 $0.00 $0.00 $0.00
RECEIVER); ASPHALT SPREADER; BOILERS; BULLDOZERS; COMBINATION BACKHOE END LOADER WITH BACKHOE BUCKET 1/2 CU. YD. AND UNDER OR WITH ATTACHMENTS; CORBOY $47.90 $45.93 $93.83 Top 10% $0.00 $0.00 $0.00 $0.00
RESIDENTIAL) $30.60 $38.65 $69.25 Top 10% $0.00 $0.00 $0.00 $0.00
ROOFER $47.47 $27.81 $75.28 Top 10% +181% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: COMPOSITION $34.55 $21.04 $55.59 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: SLATE & TILE $36.05 $21.04 $57.09 Top 10% +113% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $44.45 $30.43 $74.88 Above median +161% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $52.96 $31.41 $84.37 Above median +194% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $44.20 $27.88 $72.08 Above median +132% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTERS (PORTER COUNTY) $48.10 $27.05 $75.15 Top 10% +142% vs market $0.00 $0.00 $0.00 $0.00
TELECOMMUNICATION TECHNICIAN - WORK COVERS LOW VOLTAGE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES INCLUDING, TELEPHONE AND $41.50 $31.23 $72.73 Top 10% $0.00 $0.00 $0.00 $0.00
THROTTLE VALVE, CONCRETE BREAKER, CONCRETE MIXER, FORKLIFT, GREASER ENGINEER, HIGHLIFT SHOVEL OR FRONT ENDLOADER 3 YD BUCKET AND UNDER, HOISTS, HYDRUL $34.80 $38.65 $73.45 Top 10% $0.00 $0.00 $0.00 $0.00
TON OR MORE CAPACITY) 95% OF J.L. RATE (LAKE & PORTER COUNTIES) $47.35 $21.53 $68.88 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION $36.60 $35.48 $72.08 +149% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION $36.15 $35.48 $71.63 Bottom 10% +148% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION $38.20 $35.48 $73.68 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION $38.00 $35.48 $73.48 Above median +154% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION $37.80 $35.48 $73.28 Above median +154% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION $37.60 $35.48 $73.08 +153% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 1 PICKUP TRUCKS FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY $33.75 $0.00 $33.75 Top 10% +17% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 2 SINGLE AXLE TRUCKS FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABO $33.95 $0.00 $33.95 Top 10% +18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 3 TANDEM, TRIAXLE AND FUEL TRUCKS FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH $34.25 $0.00 $34.25 Top 10% +19% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 4 SEMI TRAILER TRUCKS FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LAB $34.75 $0.00 $34.75 Top 10% +20% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 1 SINGLE AXLE TRUCKS, SEVEN CU. YDS. OR LESS THAN TEN AND ONE-HALF TONS, DUPSTERS, SCOOP-MOBILES FIVE $32.67 $0.00 $32.67 Top 10% +13% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 2 DRIVERS ON TANDEM AXLE EIGHTEEN CU.YDS. OR TWENTY- FOUR TONS GROSS, SIX WHEEL TRUCKS, KOEHRING OR SI $33.17 $0.00 $33.17 Top 10% +15% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 4 DRIVERS ON HEAVY EQUIPMENT OVER SIXTEEN CU.YDS. OR TWENTY-FOUR TON, SUCH AS KOEHRING OR SIMILAR DUMP $33.52 $0.00 $33.52 Top 10% +16% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 5 MECHANIC FURNISHING HIS OWN TOOLS. A: $37.90 PER DAY & 460.00 PER WEEK $34.02 $0.00 $34.02 Top 10% +18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1 SINGLE/BATCHES AXLE STRAIGHT TRUCKS; BATCH TRUCKS, WET OR DRY 3 AXLE OR LESS; SINGLE AXLE GREASE $34.69 $20.51 $55.20 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 SINGLE AXLE FUEL AND WATER TRUCKS $34.74 $20.51 $55.25 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3 SINGLE AXLE ""DOG-LEGS"", AND TANDEM TRUCK OR DOG- LEGS; WINCH TRUCKS OR A-FRAMES WHEN USED FOR $34.79 $20.51 $55.30 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 4 TANDEM AXLE FUEL TRUCKS; TANDEM AXLE WATER TRUCKS; BUTUMINOUS DISTRIBUTORS $34.84 $20.51 $55.35 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5 TANDEM TRUCKS OVER 15 TONS PAYLOAD; SINGLE AXLE SEMI TRUCKS; FARM TRACTORS HAULING MATERIAL; MIX $34.89 $20.51 $55.40 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 6 TANDEM TRUCKS OR ""DOG-LEGS""; SEMI-WATER TRUCK; SPRINKLER TRUCK; HEAVY EQUIPMENT-TYPE WATER WAG $34.94 $20.51 $55.45 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 7 TRI-AXLE TRUCKS; TANDEM AXLE SEMI TRUCKS; EQUIPMENT WHEN NOT SELF-LOADED OR PUSHER LOADED, SUCH $34.99 $20.51 $55.50 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 8 TANDEM-TANDEM SEMI TRUCKS; TRUCK MECHANICS AND WELDERS; HEAVY EQUIPMENT-TYPE WATER WAGON OVER 5 $35.04 $20.51 $55.55 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP11 HELPERS; GREASERS; TIRE MEN; BATCH BOARD TENDERS; WAREHOUSEMAN LAPORTE & ST. JOSEPH COUNTIES HEAVY AND HIGHWAY CONSTRUCTION $35.09 $20.51 $55.60 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP12 ACEY WAGON; QUAD AXLE TRUCKS; ARTICULATING DUMP LAPORTE & ST. JOSEPH COUNTIES HEAVY AND HIGHWAY CONSTRUCTION $35.19 $20.51 $55.70 Top 10% +93% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER:GROUP 10 PICK-UP TRUCKS LAPORTE & ST. JOSEPH COUNTIES HEAVY AND HIGHWAY CONSTRUCTION $34.54 $20.51 $55.05 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the La Porte, IN — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in La Porte

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IN20260001-15048-hvy →