Building Construction — Johnson, Indiana

WD IN20260002-15065-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES O in Johnson, Indiana (construction type: building) is $40.20/hr base + $25.68/hr fringe = $65.88/hr total package (WD IN20260002-15065-bld, Rev. 2).

Scroll down for all 148 trade classifications covered by this determination.

WD Number: IN20260002-15065-bld
Revision: 2
Construction Type: building
State: Indiana (IN)
County: Johnson
Effective: May 17, 2026
Trades covered: 148
Official source: SAM.gov reference IN20260002View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES O $40.20 $25.68 $65.88 Top 10% +171% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES O $37.25 $19.85 $57.10 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES O $39.50 $28.19 $67.69 Top 10% +179% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.24 $38.17 $81.41 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONE MASON, POINTER, CAULKING $36.24 $17.39 $53.63 Top 10% +55% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER $34.00 $19.71 $53.71 Top 10% +55% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER $33.75 $20.12 $53.87 Bottom 10% +56% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER $33.83 $20.14 $53.97 Above median +56% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: STONE MASON, MARBLE MASONS, POINTER, CLEANER, AND CAULKER $35.00 $21.60 $56.60 Top 10% +63% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $34.99 $25.27 $60.26 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER & PILEDRIVERMEN $33.42 $25.93 $59.35 Bottom 10% +104% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER & PILEDRIVERMEN $34.45 $25.33 $59.78 Above median +106% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: CARPENTERS, DRYWALL $35.55 $24.21 $59.76 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: MILLWRIGHT $39.10 $25.95 $65.05 Top 10% +124% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: MILLWRIGHT..$ 39.10 25.95 CARPENTER: CARPENTERS, DRYWALL $37.54 $24.90 $62.44 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: MILLWRIGHT (HAMILTON, HANCOCK, JOHNSON, MARION) $39.10 $25.95 $65.05 Top 10% +79% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: SOFT FLOOR LAYERS (BARTHOLOMEW, JOHNSON, SHELBY COUNTIES) $35.54 $22.12 $57.66 Top 10% +98% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $28.84 $14.48 $43.32 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $23.38 $11.94 $35.32 Above median +24% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $24.58 $14.99 $39.57 Above median +39% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER: AREA #121 (BENTON, CARROLL, CASS, CLINTON, FOUNTAIN, HOWARD, MIAMI, MONTGOMERY, TIPPECANOE, WARREN, WHITE AND VERMILLI $33.50 $21.95 $55.45 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER: AREA #532 (BOONE, HAMILTON; HANCOCK COUNTY; HENDRICKS, JOHNSON, MARION AND MORGAN COUNTIES) $35.00 $20.61 $55.61 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER: AREA #75 $30.90 $18.40 $49.30 Top 10% +73% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER: AREA #83 (BLACKFORD, DELAWARE, GRANT, HAMILTON, HANCOCK, JAY, MADISON, TIPTON, AND WABASH COUNTIES) $32.55 $22.04 $54.59 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
COMMUNICATION TECHNICIAN: INCLUDES THE INSTALLATION, OPERATION, INSPECTION, MAINTENANCE, REPAIR AND SERVICE OF RADIO, TELEVISION, RECORDING, VOICE SOU $30.00 $18.07 $48.07 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.18 $23.18 $63.36 Above median +101% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $45.45 $28.19 $73.64 Above median +134% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.00 $27.36 $68.36 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $43.30 $25.32 $68.62 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $42.02 $23.07 $65.09 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERANS DAY THANKSGIVING DAY AND CHRISTMAS DAY $42.00 $24.15 $66.15 Top 10% +110% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKS $60.17 $38.44 $98.61 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
FT. AND LESS THAN 600 CU. FT.), GENERATOR, HEATERS, MECHANICAL, HOISTS, HOIST, HOIST, OILERS, PUMPS, WELL POINTS AND ELECTRIC SUBMERSIBLE, SMALL RUBBE $33.20 $38.65 $71.85 Top 10% $0.00 $0.00 $0.00 $0.00
GLAZIER $34.22 $24.67 $58.89 Above median +112% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $29.50 $19.02 $48.52 +75% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $36.03 $20.55 $56.58 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS $39.50 $28.19 $67.69 Top 10% $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS $35.10 $19.39 $54.49 Top 10% $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS $23.00 $14.40 $37.40 Bottom 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER (ADAMS, ALLEN, BLACKFORD, DEKALB, DELAWARE, FULTON, GRANT, HUNTINGTON, JAY, MIAMI, NOBLE, STEUBEN, WABASH, WELLS, AND WHITLEY COUNTIES) $35.40 $26.92 $62.32 Top 10% +75% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (BARTHOLOMEW; BENTON, BOONE; CARROLL; CASS; CLINTON; DELAWARE; FOUNTAIN; FULTON; GRANT; HAMILTON; HANCOCK; HENDRICKS; HOWARD; JOHNSON; MADI $38.00 $26.39 $64.39 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (FULTON AND NOBLE COUNTIES) $39.76 $25.00 $64.76 Top 10% +82% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS, SCAFFOLD BUILDERS, MECHANIC TENDERS, WINDOW WASHERS AND CLEANERS, RAILROAD WORKERS, MASONRY WALL $28.06 $18.55 $46.61 Top 10% +96% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; MECHANIC TENDERS; WINDOW WASHERS AND CLEANERS; RAILROAD WORKERS; MASONRY WALL $29.64 $18.55 $48.19 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; MECHANIC TENDERS; WINDOW WASHERS AND CLEANERS; RAILROAD WORKERS; MASONRY WALL $28.43 $18.55 $46.98 Above median +97% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; MECHANIC TENDERS; WINDOW WASHERS AND CLEANERS; RAILROAD WORKERS; MASONRY WALL $26.38 $18.45 $44.83 Bottom 10% +88% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; RAILROAD WORKERS; MASONRY WALL WASHERS; ALL PORTABLE WATER PUMPS WITH DISCHAR $28.48 $18.55 $47.03 Top 10% +98% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 PLASTER TENDERS; MORTAR MIXERS; WELDERS; CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATOR; SCAFFOLD BUILDERS WHE $30.39 $18.55 $48.94 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 PLASTER TENDERS; MORTAR MIXERS; WELDERS; CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATOR; SCAFFOLD BUILDERS WHE $29.18 $18.55 $47.73 Above median +100% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 PLASTER TENDERS; MORTAR MIXERS; WELDERS; CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATOR; SCAFFOLD BUILDERS WHE $26.88 $18.45 $45.33 Bottom 10% +90% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 PLASTER TENDERS; MORTAR MIXERS; WELDERS; CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATORS; SCAFFOLD BUILDERS FO $29.23 $18.55 $47.78 Top 10% +101% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 PLASTER TENDERS; MORTAR MIXERS; WELDERS; CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATORS; SCAFFOLD BUILDERS FO $28.38 $18.55 $46.93 Bottom 10% +97% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 PLASTER TENDERS; MORTAR MIXERS; WELDERS; CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATORS; SCAFFOLD BUILDERS FO $28.81 $18.55 $47.36 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 DYNAMITE MAN, MASON TENDERS; DRILLERS-AIR TRACK OR WAGON FOR EXPLOSIVES $30.48 $18.55 $49.03 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 DYNAMITE MEN, MASON TENDERS; DRILLERS-AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES $31.64 $18.55 $50.19 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 DYNAMITE MEN, MASON TENDERS; DRILLERS-AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES $30.43 $18.55 $48.98 Bottom 10% +106% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 DYNAMITE MEN-DRILLERS-AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES $28.88 $18.45 $47.33 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 DYNAMITE MEN; MASON TENDERS; DRILLERS-AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES $30.38 $18.55 $48.93 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 MASON TENDERS AND DYNAMITE MEN-DRILLERS-AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES $30.06 $18.55 $48.61 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $37.68 $27.84 $65.52 +80% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $35.89 $30.52 $66.41 +82% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER, DRYWALL TAPING & FINISHING, VINYL/PAPER HANGING $32.50 $19.86 $52.36 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $31.02 $16.86 $47.88 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $31.15 $18.76 $49.91 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $33.00 $19.86 $52.86 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY AND SANDBLASTING $32.02 $16.86 $48.88 Bottom 10% +103% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY AND SANDBLASTING $32.10 $18.76 $50.86 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH & ROLLER $41.00 $31.26 $72.26 Top 10% +200% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH, ROLLER, PAPERHANGER, & DRYWALL FINISHING $27.04 $16.27 $43.31 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH; ROLLER; PAPERHANGING; DRYWALL FINISHERS $25.10 $16.39 $41.49 Top 10% +73% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: DRYWALL FINISHER $41.80 $31.26 $73.06 Top 10% +204% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: LEAD ABATEMENT $32.24 $16.27 $48.51 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY & SANDBLAST POT TENDERS AND GROUND PERSONNEL $27.04 $16.27 $43.31 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST, & STEAM CLEANING $27.04 $16.27 $43.31 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY/WATERBLASTING; SANDBLASTING $26.10 $16.39 $42.49 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF SERVICE; 6% FOR LESS THAN 5 YEARS' SERVICE $62.27 $38.44 $100.71 Top 10% $0.00 $0.00 $0.00 $0.00
PLASTERER $26.81 $12.40 $39.21 +59% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $25.69 $11.75 $37.44 Bottom 10% +52% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER: AREA #121 (BENTON, CARROLL, CASS, CLINTON, FOUNTAIN, HOWARD, MIAMI, MONTGOMERY, TIPPECANOE, WARREN, WHITE AND VERMILLION COUNTIES) $33.76 $20.05 $53.81 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER: AREA #46 $31.50 $18.32 $49.82 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER: AREA #83 (BLACKFORD, DELAWARE, GRANT, HAMILTON, HANCOCK, JAY, MADISON, TIPTON, AND WABASH COUNTIES) $30.60 $17.19 $47.79 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER AND STEAMFITTER $45.06 $23.16 $68.22 Bottom 10% +120% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER AND STEAMFITTER $50.05 $20.39 $70.44 Above median +127% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTER, STEAMFITTER $44.93 $23.03 $67.96 Bottom 10% +119% vs market $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS $46.42 $21.33 $67.75 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS $46.65 $23.45 $70.10 Above median +126% vs market $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS (BARTHOLOMEW, BOONE, HAMILTON, HANCOCK, HENDRICKS, HOWARD, JOHNSON AND MARION COUNTIES; MIAMI COUNTY; MORGAN, SHELBY AND TIPT $50.05 $20.39 $70.44 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 MECHANIC, ASPHALT PLANT, ASPHALT SPREADER, AUTO GRADER; BATCH PLANT, BENOTO, BOILER AND THROTTLE VALVE, BORING MACHIN $36.15 $38.65 $74.80 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 3 BUCK HOIST, COMBINATION, .CONVEYOR, GROUTING MACHINE, HOIST ELEVATORS, HYDRAULIC POWER UNITS, GROUTING AND PILE DRIVI $34.00 $38.65 $72.65 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 5 BOBCATS AND FORKLIFTS $30.60 $38.65 $69.25 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 A-FRAME WINCH TRUCK, AIR COMPRESSORS OVER 600 CU.FT., AIR TUGGER, AUTOGRADE, AUTO PATROL, BACKHOE, BALLAST REGULATO $38.70 $23.95 $62.65 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 AIR COMPRESSOR; AIR TUGGER; AUTO PATROL; BACK FILLER; BACK HOE; BOOM CAT; BORING MACHINE; BULL DOZER; CAISSON DRILL $37.08 $19.96 $57.04 Top 10% +64% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 AIR TUGGER; AUTO PATROL, BACK FILLER; BACK HOE; BOOM CAT; BORING MACHINE; BULL DOZER; CAISSON DRILLING MACHINE; CHE $38.95 $23.30 $62.25 Top 10% +79% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 A FRAME TRUCK; BATCHER PLANT; BENDING MACHINE-POWER DRIVEN; BITUMINOUS MIXER; BITUMINOUS PAVER; BITUMINOUS PLANT EN $36.13 $19.96 $56.09 Above median +61% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 AIR COMPRESSOR, BRAKEMAN, BULL FLOAT, CONCRETE MIXER, CONCRETE SPREADER OR PUDDLER, DECK ENGINE, DRILL HELPER, ELEC $35.70 $23.95 $59.65 Top 10% +71% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 BENDING MACHINE POWER DRIVEN; BITUMINOUS MIXER; BITUMINOUS PAVER; BITUMINOUS PLANT ENGINEER; BOATMAN; BULL FLOAT; C $38.00 $23.30 $61.30 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 AIR COMPRESSOR 210 CU FT & OVER, BITUMINOUS DISTRIBUTOR, CHAIR CART, CONCRETE CURING MACHINE, CONCRETE SAW, DOPE PO $35.00 $23.95 $58.95 Top 10% +69% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 AIR COMPRESSOR; BITUMINOUS DISTRIBUTOR; CHAIR CART; CONCRETE CURING MACHINE; CONCRETE SAW; DOPE POT POWER AGITATED $32.08 $19.96 $52.04 Top 10% +50% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 BITUMINOUS DISTRIBUTOR; CHAIR CART; CONCRETE CUTING MACHINE; DEWATERING SYTEMS; DOPE POT POWER AGITATED; FLEX PLANE $35.00 $23.30 $58.30 Top 10% +68% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 AIR COMPRESSOR, BITUMINOUS DISTRIBUTOR, CEMENT GUN, CONCRETE SAW, CONVEYOR, DECK HAND OILER, EARTH ROLLER, FORM GRA $30.43 $23.95 $54.38 Top 10% +56% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 AIR COMPRESSOR; AIR COMPRESSOR; CONCRETE SAW; CONVEYOR; GENERATORS; OILER; OPERATING MINOR EQUIPMENT; POWER BROOM $31.50 $23.30 $54.80 Top 10% +58% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 AIR COMPRESSOR; CONCRETE MIXER; CONVEYOR; GENERATOR; MECHANICAL HEATER; OILER; OPERATOR-2 PIECES OF MINER EQUIPMENT $28.30 $19.96 $48.26 Top 10% +39% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP A A-FRAME WINCH TRUCK, ARTICULATING DUMP, AUTOGRADE, AUTO PATROL, BALLAST REGULATOR, BATCHER PLANT, BENDING MACHINE $43.43 $19.60 $63.03 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP B AIR COMPRESSOR, AIR COMPRESSOR WITH THROTTLE VALVE, BITUMINOUS DISTRIBUTOR, BRAKEMAN, BULLFLOAT, CEMENT GUN, CONCRE $35.30 $19.60 $54.90 Top 10% +58% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $32.00 $16.61 $48.61 Above median +82% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: COMPOSITION $34.55 $21.04 $55.59 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: SLATE & TILE $36.05 $21.04 $57.09 Top 10% +113% vs market $0.00 $0.00 $0.00 $0.00
ROOFERS $32.00 $16.61 $48.61 Above median +82% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $40.19 $27.33 $67.52 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $44.45 $30.45 $74.90 Above median +161% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC DUCT WORK $40.19 $27.33 $67.52 Bottom 10% +136% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC DUCT WORK $44.85 $27.51 $72.36 Top 10% +153% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $44.20 $27.88 $72.08 Above median +132% vs market $0.00 $0.00 $0.00 $0.00
TERRAZZO FINISHER $23.38 $13.15 $36.53 Bottom 10% $0.00 $0.00 $0.00 $0.00
TERRAZZO FINISHER.$ 25.33 14.19 BRICKLAYER, STONEMASON $35.21 $18.19 $53.40 Top 10% $0.00 $0.00 $0.00 $0.00
TERRAZZO GRINDER FINISHER $31.00 $17.89 $48.89 Top 10% $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER FINISHER $35.50 $23.62 $59.12 Top 10% $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER MECHANIC $36.30 $22.04 $58.34 Top 10% $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $36.38 $17.24 $53.62 Bottom 10% $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $37.97 $18.06 $56.03 Above median $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $33.50 $23.62 $57.12 Above median $0.00 $0.00 $0.00 $0.00
TILE & MARBLE FINISHER $25.33 $14.19 $39.52 Above median $0.00 $0.00 $0.00 $0.00
TILE & MARBLE FINISHER $34.50 $23.62 $58.12 Top 10% $0.00 $0.00 $0.00 $0.00
TILE & MARBLE SETTER; MOSAIC WORKER $37.22 $18.05 $55.27 Top 10% $0.00 $0.00 $0.00 $0.00
TILE & MARBLE FINISHER $24.33 $13.16 $37.49 Above median $0.00 $0.00 $0.00 $0.00
TILE & MARBLE FINISHER $23.38 $13.15 $36.53 Bottom 10% $0.00 $0.00 $0.00 $0.00
TILE & MARBLE SETTER; MOSAIC WORKER $35.63 $17.23 $52.86 Above median $0.00 $0.00 $0.00 $0.00
TILE SETTER & MARBLE MASON MECHANIC $31.55 $19.08 $50.63 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
TILE, MARBLE & TERRAZZO FINISHER $31.55 $19.08 $50.63 Top 10% $0.00 $0.00 $0.00 $0.00
TILE, MARBLE SETTER $35.63 $17.23 $52.86 Bottom 10% $0.00 $0.00 $0.00 $0.00
TILE, MARBLE SETTER $34.50 $23.62 $58.12 Top 10% $0.00 $0.00 $0.00 $0.00
TILT MAST), GREASER ENGINEER, HIGHLIFT SHOVEL OR FRONT ENDLOADER 3 YD BUCKET AND UNDER, HOISTS, HYDRULIC BOOM TRUCK, POST HOLE DIGGER, PUMP CRETES (SQ $34.80 $38.65 $73.45 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1 SINGLE AXLE TRUCKS, SEVEN CU. YDS. OR LESS THAN TEN AND ONE-HALF TONS, DUPSTERS, SCOOP-MOBILES FIVE CU.YDS. AND UNDER OR LESS TH $32.67 $0.00 $32.67 Top 10% +13% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1 TRUCK DRIVER HELPER $39.42 $0.00 $39.42 Top 10% +36% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1 TRUCK DRIVER HELPER A: $36.40 PER DAY & $450.00 PER WEEK $32.67 $0.00 $32.67 Top 10% +13% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1PICK-UP TRUCKS FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DA $33.75 $0.00 $33.75 Top 10% +17% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2 DRIVERS ON TANDEM AXLE EIGHTEEN CU.YDS. OR TWENTY- FOUR TONS GROSS, SIX WHEEL TRUCKS, KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCK $33.17 $0.00 $33.17 Top 10% +15% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2 SINGLE AXLE TRUCKS FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LAB $33.95 $0.00 $33.95 Top 10% +18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2 TRUCK DRIVER ON FORK LIFTS $39.61 $0.00 $39.61 Top 10% +37% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2 TRUCK DRIVER ON FORK LIFTS & TRUCK DRIVER ON TANDEM, SEMI, OR TRI-AXLE A: $36.40 PER DAY & $450.00 PER WEEK $33.17 $0.00 $33.17 Top 10% +15% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3 KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, SEMI- TRAILER WATER TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, TOURNAPULLS, TOURNATRAILERS $33.37 $0.00 $33.37 Top 10% +16% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3 TANDEM, TRI-AXLE AND FUEL TRUCKS FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURT $34.25 $0.00 $34.25 Top 10% +19% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3 TRUCK DRIVER ON TANDEM, SEMI, OR TRI-AXLE $39.71 $0.00 $39.71 Top 10% +37% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4 DRIVERS ON HEAVY EQUIPMENT OVER SIXTEEN CU.YDS. OR TWENTY-FOUR TON, SUCH AS KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, EUCLIDS $33.52 $0.00 $33.52 Top 10% +16% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4 SEMI-TRAILER TRUCKS FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LA $34.75 $0.00 $34.75 Top 10% +20% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4 TRUCK DRIVER ON WATER TRUCKS AND MECHANIC $39.81 $0.00 $39.81 Top 10% +38% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 5 MECHANIC FURNISHING HIS OWN TOOLS. A: $36.40 PER DAY & 450.00 PER WEEK $34.02 $0.00 $34.02 Top 10% +18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 5 TRUCK DRIVER EUCLID/EARTH MOVERS $39.91 $0.00 $39.91 Top 10% +38% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Johnson, IN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Johnson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IN20260002-15065-bld →