Building Construction — Jasper, Indiana

WD IN20260005-15047-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Jasper, Indiana (construction type: building) is $56.02/hr base + $37.24/hr fringe = $93.26/hr total package (WD IN20260005-15047-bld, Rev. 2).

Scroll down for all 82 trade classifications covered by this determination.

WD Number: IN20260005-15047-bld
Revision: 2
Construction Type: building
State: Indiana (IN)
County: Jasper
Effective: May 17, 2026
Trades covered: 82
Official source: SAM.gov reference IN20260005View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $56.02 $37.24 $93.26 Top 10% +284% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $41.20 $30.93 $72.13 Above median +197% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.24 $38.17 $81.41 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $33.00 $22.33 $55.33 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $31.00 $19.16 $50.16 +45% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $31.11 $18.40 $49.51 +43% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, CAULKER, CLEANER, POINTER $34.00 $19.71 $53.71 Top 10% +55% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: INCLUDING STONEMASON, AND POINTER, CAULKER & CLEANER $42.05 $28.22 $70.27 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $43.58 $34.66 $78.24 Top 10% +169% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER & PILEDRIVERMEN $33.42 $25.93 $59.35 Bottom 10% +104% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER & PILEDRIVERMEN $35.51 $25.51 $61.02 Top 10% +110% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $28.84 $14.48 $43.32 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $37.28 $18.53 $55.81 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER (JASPER, PULASKI AND STARKE COUNTIES) $35.48 $21.68 $57.16 +101% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER (MARSHALL COUNTY AND PULASKI) $28.84 $14.48 $43.32 +52% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER (PULASKI, JASPER, STARKE) $36.01 $25.40 $61.41 +115% vs market $0.00 $0.00 $0.00 $0.00
COMMUNICATION TECHNICIAN $26.50 $18.33 $44.83 Above median $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $46.00 $29.23 $75.23 Above median +139% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.18 $23.18 $63.36 Above median +101% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $52.00 $32.85 $84.85 Top 10% +170% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANK $62.27 $38.44 $100.71 +84% vs market $0.00 $0.00 $0.00 $0.00
FT. AND LESS THAN 600 CU. FT.), GENERATOR, HEATERS, MECHANICAL, HOISTS, HOIST, HOIST, OILERS, PUMPS, WELL POINTS AND ELECTRIC SUBMERSIBLE, SMALL RUBBE $33.20 $38.65 $71.85 Top 10% $0.00 $0.00 $0.00 $0.00
GLAZIER $53.55 $44.88 $98.43 Top 10% +255% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $34.22 $24.67 $58.89 Above median +112% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER (JASPER, NEWTON) $44.09 $30.73 $74.82 +170% vs market $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, W $44.82 $34.00 $78.82 Top 10% $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING, AND DISPOSAL OF ALL INSULATION MATERIALS $41.20 $30.93 $72.13 Top 10% $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERAILS $37.25 $19.85 $57.10 $0.00 $0.00 $0.00 $0.00
INSULATOR/ASBESTOS WORKER: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL $37.25 $19.85 $57.10 +135% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (ELKHART, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, PULASKI, AND STARKE COUNTIES) $39.76 $25.00 $64.76 +82% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (JASPER, NEWTON, PULASKI COUNTIES) $47.75 $41.28 $89.03 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (JASPER, NEWTON, PULASKI) THE FOLLOWING HOLIDAYS SHALL BE OBSERVED: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING $38.00 $26.39 $64.39 +80% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (KOSCIUSKO AND LAGRANGE) $35.40 $26.92 $62.32 +75% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: SHEETER (JASPER, NEWTON, PULASKI COUNTIES) $48.00 $41.28 $89.28 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: BUILDING CONSTRUCTION: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; MECHANIC TENDERS; WINDOW WASHERS AND CLEANERS; WATERBO $29.88 $18.70 $48.58 +104% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: BUILDING CONSTRUCTION: GROUP 2 WATERPROOFING; HANDLING OF CREOSOT LUMBER OR LIKE TREATED MATERIAL; ASPHALT RAKERS AND LUTEMEN; KETTLEMEN; AI $30.38 $18.70 $49.08 +106% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: BUILDING CONSTRUCTION: GROUP 3 WATER BLAST MACHINE OPERATOR; MORTAR MIXERS; WELDERS; CUTTING TORCH OR BURNER; CEMENT NOZZLE. LABORERS; CEMEN $31.88 $18.70 $50.58 +112% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; MECHANIC TENDERS; RODMEN AND CHAINMEN, RAILROAD WORKERS, MASONRY WALL WORKERS $39.89 $30.30 $70.19 Top 10% +195% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; MECHANIC TENDERS; RODMEN AND CHAINMEN, RAILROAD WORKERS, MASONRY WALL WORKERS $26.98 $18.00 $44.98 Bottom 10% +89% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 PLASTER TENDERS, MASONS TENDERS; MORTAR MIXERS; WELDERS; CUTTING TORCH OR BURNER; CEMENT NOZZLE; CEMENT GUN; SCAFFOLD BUILDERS WHEN $40.64 $30.30 $70.94 Top 10% +198% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 DYNAMITE MEN; DRILLERS, AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES; LABORER SPECIALIST $40.89 $30.30 $71.19 +199% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 DYNAMITE MEN; DRILLERS, MASON TENDERS; AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES; LABORER SPECIALIST...$ 28.48 18.00 LABORERS: GROU $27.73 $18.00 $45.73 +92% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $47.92 $36.93 $84.85 Above median +133% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $35.89 $30.52 $66.41 +82% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $32.50 $19.86 $52.36 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $33.00 $19.86 $52.86 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH & ROLLER $41.00 $31.26 $72.26 Top 10% +200% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH, ROLLER, PAPERHANGER, & DRYWALL FINISHING $25.04 $15.32 $40.36 Bottom 10% +68% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: DRYWALL FINISHER $41.80 $31.26 $73.06 Top 10% +204% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: LEAD ABATEMENT $32.24 $16.27 $48.51 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY & SANDBLAST POT TENDERS AND GROUND PERSONNEL $27.04 $16.27 $43.31 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST, & STEAM CLEANING $27.04 $16.27 $43.31 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF SERVICE; 6% FOR LESS THAN 5 YEARS' SERVICE $60.17 $38.44 $98.61 Bottom 10% $0.00 $0.00 $0.00 $0.00
PIPEFITTER (JASPER, AND NEWTON) $48.50 $31.12 $79.62 Top 10% +157% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $25.69 $11.75 $37.44 Bottom 10% +52% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $32.70 $17.70 $50.40 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER (JASPER, PULASKI AND STARKE COUNTIES) $33.28 $17.32 $50.60 +105% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER (MARSHALL COUNTY AND PULASKI) $26.81 $12.40 $39.21 +59% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER (JASPER AND NEWTON COUNTIES) $49.77 $28.56 $78.33 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTER, STEAMFITTER (JASPER, MARSHALL, PULASKI AND STARKE COUNTIES) $44.93 $23.03 $67.96 Top 10% +119% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 MECHANIC, ASPHALT PLANT, AUTO GRADER; BATC PLANT, BENOTO, BOILER AND THROTTLE VALVE, BORING MACHINE, (MINING MACHINE $48.70 $38.65 $87.35 +151% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1: MECHANIC, ASPHALT PLANT, ASPHLAT SPREADER, AUTO GRADER; BATCH PLANT, BENOTO, BOILER AND THROTTLE VALVE, BORING MACHI $36.15 $38.65 $74.80 +115% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 AIR COMPRESSORS (30 FEEDING AND COMMON RECEIVERS, ASPHALT SPREADER, BOILERS, BULLDOZERS, COMBINATION BACKHOE-END LOAD $47.90 $38.65 $86.55 +149% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2: AIR COMPRESSOR, BOB CAT, BOILERS, BROOM, BULL DOZERS WITH ENGINES LESS THAN 140 NET HORSEPOWER, COMBINATION BACKHOE $34.80 $38.65 $73.45 +111% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 3 CONCRETE MIXER, CONVEYOR, PORTABLE, STEAM GENERATORS, TRACTORS, AIR COMPRESSOR (SMALL 150 AND UNDER - 1 TO 5 TO EXCEE $43.60 $38.65 $82.25 +136% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 3: BUCK HOIST, COMBINATION, CONVEYOR, GROUTING MACHINE, HOIST ELEVATORS, HYDRAULIC POWER UNITS, GROUTING AND PILE DRIVI $34.00 $38.65 $72.65 +109% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 HEATERS, MECHANICAL, OILERS, SWITHMEN, BULL GANG $41.40 $38.65 $80.05 +130% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 5 FORKLIFTS $35.95 $38.65 $74.60 +114% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 5 GROUP 5: BOBCATS AND FORKLIFTS $30.60 $38.65 $69.25 +99% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $47.47 $27.81 $75.28 Top 10% +181% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: COMPOSITION $34.55 $21.04 $55.59 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: SLATE & TILE $36.05 $21.04 $57.09 Top 10% +113% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $44.20 $27.88 $72.08 Above median +132% vs market $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER FINISHER $32.50 $21.11 $53.61 Bottom 10% $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $34.50 $23.62 $58.12 Above median $0.00 $0.00 $0.00 $0.00
TILE, MARBLE & TERRAZZO WORKER $42.05 $28.22 $70.27 Above median $0.00 $0.00 $0.00 $0.00
TILE, MARBLE SETTER.$ 34.50 23.62 TILE & MARBLE FINISHER $32.50 $21.11 $53.61 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4 SEMI TRAILER TRUCKS FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LA $34.25 $0.00 $34.25 +19% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 1 SINGLE AXLE TRUCKS SEVEN CU.YDS. OR LESS THAN TEN AND ONE-HALF TONS, DUMPSTERS, SCOOP-MOBILES FIVE CU.YDS. AND UNDER OR LESS TH $32.67 $0.00 $32.67 +13% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 2 DRIVERS ON TANDEM AXLE EIGHTEEN CU.YDS. OR TWENTY-FOUR TONS GROSS, SIX WHEEL TRUCKS, KOEHRING OR SIMILAR DUMPSTERS, TRACT RUCKS $33.17 $0.00 $33.17 +15% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 4 DRIVERS ON HEAVY EQUIPMENT OVER SIXTEEN CU.YDS. OR TWENTY-FOUR TON, SUCH AS KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, EUCLID $33.37 $0.00 $33.37 Bottom 10% +16% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 5 MECHANIC FURNISHING HIS OWN TOOLS $34.02 $0.00 $34.02 +18% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Jasper, IN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Jasper

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IN20260005-15047-bld →