Building Construction — Fayette, Indiana
WD IN20260004-15059-bld · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF M in Fayette, Indiana (construction type: building) is $40.20/hr base + $25.68/hr fringe = $65.88/hr total package (WD IN20260004-15059-bld, Rev. 2).
Scroll down for all 101 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF M | $40.20 | $25.68 | $65.88 Top 10% +171% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHINGS TO ALL TYPES OF | $38.56 | $18.70 | $57.26 Top 10% +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES O | $30.00 | $20.89 | $50.89 Bottom 10% +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKERS/INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHINGS TO ALL TYPES OF MECHANICAL S | $35.23 | $22.79 | $58.02 Top 10% +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $43.24 | $38.17 | $81.41 Above median +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $33.70 | $16.57 | $50.27 +45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON | $35.21 | $18.19 | $53.40 Above median +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER | $33.83 | $20.14 | $53.97 Above median +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $31.38 | $26.27 | $57.65 Above median +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: CARPENTER | $32.43 | $25.78 | $58.21 Bottom 10% +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: PILEDRIVER | $33.43 | $25.78 | $59.21 Above median +150% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: SOFT FLOOR LAYERS | $35.54 | $22.12 | $57.66 Top 10% +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER: AREA #566 | $32.50 | $20.77 | $53.27 Top 10% +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER: AREA #821 (BROWN, CLARKE, DEARBORN, FLOYD, FRANKLIN, JENNINGS, OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $30.02 | $18.20 | $48.22 Top 10% +69% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER: AREA #83 | $32.55 | $22.04 | $54.59 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| COMMUNICATION TECHNICIAN: INCLUDES THE INSTALLATION, OPERATION, INSPECTION, MAINTENANCE, REPAIR AND SERVICE OF RADIO, TELEVISION, RECORDING, VOICE SOU | $30.00 | $18.07 | $48.07 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $38.05 | $22.32 | $60.37 Above median +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.96 | $22.44 | $63.40 Above median +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $45.45 | $28.19 | $73.64 Above median +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $43.30 | $25.32 | $68.62 Above median +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.18 | $22.15 | $62.33 Above median +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $31.95 | $17.75 | $49.70 +79% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $35.13 | $19.57 | $54.70 +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $36.03 | $20.55 | $56.58 Above median +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS | $38.56 | $18.70 | $57.26 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS | $19.80 | $13.30 | $33.10 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS | $25.00 | $13.70 | $38.70 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS | $23.00 | $14.40 | $37.40 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $35.40 | $26.92 | $62.32 +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (BROWN, DECATUR, FAYETTE, FRANKLIN, HENRY, JENNINGS, RANDOLPH, AND RUSH COUNTIES) | $38.00 | $26.39 | $64.39 Top 10% +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (CLARK, FLOYD, HARRISON, JENNINGS, SWITZERLAND, AND RIPLEY COUNTIES) | $36.17 | $25.80 | $61.97 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (FAYETTE, RANDOLPH UNION AND WAYNE COUNTIES) | $32.69 | $24.50 | $57.19 Top 10% +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING (DEARBORN, DECATUR, FAYETTE, FRANKLIN, OHIO, RIPLEY, SWITZERLAND AND JENNINGS COUNTIES) | $36.17 | $25.80 | $61.97 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: FENCE ERECTORS (DEARBORN, DECATUR, FAYETTE, FRANKLIN, OHIO, RIPLEY, SWITZERLAND, & JENNINGS COUNTIES) | $35.88 | $23.90 | $59.78 Top 10% +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: STRUCTURAL & ORNAMENTAL (DEARBORN, DECATUR, FAYETTE, FRANKLIN, OHIO, RIPLEY, SWITZERLAND, & JENNINGS COUNTIES) | $37.77 | $23.90 | $61.67 Top 10% +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS, SCAFFOLD BUILDERS, MECHANIC TENDERS, RODMEN & CHAINMEN, SIGNALMEN & FLAGMEN, WINDOW WASHERS & CL | $26.40 | $18.90 | $45.30 Top 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; MECHANIC TENDERS; CIVIL ENGINEER TENDERS AND SURVEYOR TENDERS; RODMEN & CHAIN | $28.06 | $18.55 | $46.61 Top 10% +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; RAILROAD WORKERS; MASONRY WALL WASHERS; PORTABLE WATER PUMPS WITH DISCHARGE U | $28.38 | $18.55 | $46.93 Top 10% +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 2 PLASTER TENDERS, MORTAR MIXERS, WELDERS, CUTTING TORCH OR BURNER, CEMENT NOZZLE LABORERS, CEMENT GUN OPERATORS, SCAFFOLD BUILDERS WH | $27.40 | $18.90 | $46.30 Top 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 2 PLASTER TENDERS; MORTAR MIXERS; WELDERS; CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATORS; SCAFFOLD BUILDERS FO | $29.13 | $18.55 | $47.68 Above median +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 2 PLASTER TENDERS; MORTAR MIXERS; WELDERS; CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATORS; SCAFFOLD BUILDERS WH | $28.81 | $18.55 | $47.36 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 2 WATERPROOFING; HAULING OF CREOSOTE LUMBER OR LIKE TREATED MATERIAL; ASPHLAT RAKERS AND LUTEMEN; KETTLEMEN; AIR TOOL OPERATOR; PNEUMA | $28.81 | $18.55 | $47.36 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 3 DYNAMITE MEN, MASON TENDERS, DRILLERS-AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES | $30.38 | $18.55 | $48.93 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 3 DYNAMITE MEN, MASON TENDERS, DRILLERS-AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES | $28.15 | $18.90 | $47.05 Bottom 10% +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 3 DYNAMITE MEN; MASON TENDERS; DRILLERS-AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES | $30.06 | $18.55 | $48.61 Bottom 10% +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 3 PLASTER TENDERS; MORTAR MIXERS; WELDERS; CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATORS; SCAFFOLD BUILDERS FO | $30.06 | $18.55 | $48.61 Top 10% +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR | $39.11 | $17.13 | $56.24 Bottom 10% +17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN | $25.90 | $13.97 | $39.87 Bottom 10% -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: LINEMAN; EQUIPMENT OPERATOR | $22.25 | $6.35 | $28.60 Top 10% -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION:: GROUNDMAN | $13.83 | $6.35 | $20.18 Top 10% -58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION:: LINEMAN & CABLE SPLICERS | $44.52 | $18.43 | $62.95 Top 10% +31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE, TILE LAYER & TERRAZZO WORKER | $27.26 | $8.09 | $35.35 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $39.10 | $25.95 | $65.05 +79% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRIDGES, LEAD ABATEMENT | $31.68 | $14.46 | $46.14 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH & ROLLER, PAPERHANGER, DRYWALL TAPING | $30.34 | $14.46 | $44.80 Top 10% +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER | $31.02 | $16.86 | $47.88 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER, PAPERHANGER, SPRAY, SANDBLAST & WATERBLAST | $23.21 | $15.85 | $39.06 Top 10% +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SANDBLASTING, WATERBLASTING | $31.68 | $14.46 | $46.14 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $28.79 | $14.46 | $43.25 Above median +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY AND SAND-BLASTING | $32.02 | $16.86 | $48.88 Top 10% +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRUSH; ROLLER; PAPERHANGING; DRYWALL FINISHERS | $25.10 | $16.39 | $41.49 Top 10% +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: SPRAY/WATERBLASTING; SANDBLASTING | $26.10 | $16.39 | $42.49 Top 10% +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $57.41 | $38.44 | $95.85 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $56.57 | $38.44 | $95.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF SERVICE; 6% FOR LESS THAN 5 YEARS' SERVICE | $60.17 | $38.44 | $98.61 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER (DEARBORN, FRANKLIN, OHIO, RIPLEY AND SWITZERLAND COUNTIES) | $24.25 | $14.65 | $38.90 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER: AREA #46 | $31.50 | $18.32 | $49.82 Top 10% +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER: AREA #83 | $30.60 | $17.19 | $47.79 Top 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER AND STEAMFITTER | $50.05 | $20.39 | $70.44 Above median +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER | $32.00 | $20.13 | $52.13 +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBERS AND PIPEFITTERS | $46.42 | $21.33 | $67.75 Above median +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBERS AND PIPEFITTERS | $40.70 | $29.52 | $70.22 Top 10% +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 1 AIR COMPRESSOR AIR TUGGER; AUTO PATROL; BACK FILLER; BACK HOE; BOOM CAT; BORING MACHINE; BULL DOZER; CAISSON DRILLI | $40.48 | $22.70 | $63.18 Top 10% +82% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 2 A FRAME TRUCK; BATCHER PLANT; BENDING MACHINE-POWER DRIVEN; BITUMINOUS MIXER; BITUMINOUS PAVER; BITUMINOUS PLANT EN | $39.53 | $22.70 | $62.23 Top 10% +79% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP A A-FRAME WINCH TRUCK, ARTICULATING DUMP, AUTOGRADE, AUTO PATROL, BALLAST REGULATOR, BATCHER PLANT, BENDING MACHINE | $43.43 | $19.60 | $63.03 Top 10% +81% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP B AIR COMPRESSOR AIR COMPRESSOR WITH THROTTLE VALVE, BITUMINOUS DISTRIBUTOR, BRAKEMAN, BULLFLOAT, CEMENT GUN, CONRETE | $35.30 | $19.60 | $54.90 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS:: GROUP 3 AIR COMPRESSOR; BITUMINOUS DISTRIBUTOR; CHAIR CART; CONCRETE CURING MACHINE; CONCRETE SAW; DOPE POT POWER AGITATED | $35.48 | $22.70 | $58.18 Top 10% +67% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS:: GROUP 4 AIR COMPRESSOR; CONCRETE MIXER; CONVEYOR; GENERATOR; MECHANICAL HEATER; OILER; OPERATOR-2 PIECES OF MINER EQUIPMEN | $31.78 | $22.70 | $54.48 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $33.00 | $19.51 | $52.51 Above median +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $30.97 | $14.66 | $45.63 Above median +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $32.00 | $16.61 | $48.61 Above median +82% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $31.23 | $25.79 | $57.02 +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $34.32 | $22.82 | $57.14 +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $28.66 | $18.03 | $46.69 +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO FINISHER | $25.33 | $14.19 | $39.52 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO FINISHER | $23.38 | $13.15 | $36.53 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER/SETTER | $37.97 | $18.06 | $56.03 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER/SETTER | $36.38 | $17.24 | $53.62 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE & MARBLE FINISHER | $24.33 | $13.16 | $37.49 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE & MARBLE SETTER; MOSAIC WORKER | $35.63 | $17.23 | $52.86 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE & MARBLE FINISHER | $23.38 | $13.15 | $36.53 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE & MARBLE SETTER; MOSAIC WORKER | $35.63 | $17.23 | $52.86 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $18.58 | $6.69 | $25.27 +6% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 1 PICKUP TRUCKS, WINCH TRUCKS,WAREHOUSEMAN, MECHANIC, STREET SWEEPERS, SINGLE AXLE TRUCKS HARRISON COUNTY | $27.08 | $21.52 | $48.60 Top 10% +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 1 SINGLE AXLE TRUCKS SEVEN CU.YDS. OR LESS THAN TEN AND ONE-HALF TONS, DUMPSTERS, SCOOP-MOBILES FIVE CU. YDS. AND UNDER OR LESS T | $32.67 | $0.42 | $33.09 Top 10% +15% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 2 DRIVERS ON TANDEM AXLE EIGHTEEN CU.YDS. OR TWENTY-FOUR TONS GROSS, SIX WHEEL TRUCKS, KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCK | $33.17 | $0.42 | $33.59 Top 10% +16% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 2 TANDEM TRUCKS OR DUMP TRUCKS; FARM TRACTOR-PULLING TRAILER; BITUMINOUS DISTRIBUTORS, PAVEMENT BREAKERS HARRISON COUNTY | $27.54 | $21.52 | $49.06 Top 10% +70% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 3 KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, SEM-TRAILER WATER TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, TOURNAPULLS, TOURNATRAILERS | $33.37 | $0.42 | $33.79 Top 10% +17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 3 MIXER TRUCKS, ALL TYPES; LOWBOYS, ALL TYPES; SEMI-TRUCKS, ALL TYPES; ALL TRI-AXLE DUMP TRUCKS; ARTICULATED END DUMPS; END DUMPS | $27.76 | $21.52 | $49.28 Above median +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 4 DRIVERS ON HEAVY EQUIPMENT OVER SIXTEEN CU.YDS. OR TWENTY-FOUR TON, SUCH AS KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, EUCLID | $33.52 | $0.42 | $33.94 Top 10% +17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 5 MECHANIC, WITH HIS OWN TOOLS | $34.02 | $0.42 | $34.44 Top 10% +19% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Fayette, IN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Fayette
Compliance Notes
- This wage determination applies to federal contracts for building construction in Fayette, Indiana.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.