Building Construction — DeKalb, Indiana
WD IN20260002-20037-bld · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES O in DeKalb, Indiana (construction type: building) is $40.20/hr base + $25.68/hr fringe = $65.88/hr total package (WD IN20260002-20037-bld, Rev. 2).
Scroll down for all 148 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES O | $40.20 | $25.68 | $65.88 Top 10% +171% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES O | $37.25 | $19.85 | $57.10 Above median +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES O | $39.50 | $28.19 | $67.69 Top 10% +179% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $43.24 | $38.17 | $81.41 Above median +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONE MASON, POINTER, CAULKING | $36.24 | $17.39 | $53.63 Top 10% +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER | $34.00 | $19.71 | $53.71 Top 10% +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER | $33.75 | $20.12 | $53.87 Bottom 10% +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER | $33.83 | $20.14 | $53.97 Above median +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: STONE MASON, MARBLE MASONS, POINTER, CLEANER, AND CAULKER | $35.00 | $21.60 | $56.60 Top 10% +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $34.99 | $25.27 | $60.26 Above median +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER & PILEDRIVERMEN | $33.42 | $25.93 | $59.35 Bottom 10% +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER & PILEDRIVERMEN | $34.45 | $25.33 | $59.78 Above median +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: CARPENTERS, DRYWALL | $35.55 | $24.21 | $59.76 Top 10% +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: MILLWRIGHT | $39.10 | $25.95 | $65.05 Top 10% +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: MILLWRIGHT..$ 39.10 25.95 CARPENTER: CARPENTERS, DRYWALL | $37.54 | $24.90 | $62.44 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT (HAMILTON, HANCOCK, JOHNSON, MARION) | $39.10 | $25.95 | $65.05 Top 10% +79% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: SOFT FLOOR LAYERS (BARTHOLOMEW, JOHNSON, SHELBY COUNTIES) | $35.54 | $22.12 | $57.66 Top 10% +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $28.84 | $14.48 | $43.32 Above median +52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $23.38 | $11.94 | $35.32 Above median +24% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $24.58 | $14.99 | $39.57 Above median +39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER: AREA #121 (BENTON, CARROLL, CASS, CLINTON, FOUNTAIN, HOWARD, MIAMI, MONTGOMERY, TIPPECANOE, WARREN, WHITE AND VERMILLI | $33.50 | $21.95 | $55.45 Top 10% +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER: AREA #532 (BOONE, HAMILTON; HANCOCK COUNTY; HENDRICKS, JOHNSON, MARION AND MORGAN COUNTIES) | $35.00 | $20.61 | $55.61 Top 10% +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER: AREA #75 | $30.90 | $18.40 | $49.30 Top 10% +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER: AREA #83 (BLACKFORD, DELAWARE, GRANT, HAMILTON, HANCOCK, JAY, MADISON, TIPTON, AND WABASH COUNTIES) | $32.55 | $22.04 | $54.59 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| COMMUNICATION TECHNICIAN: INCLUDES THE INSTALLATION, OPERATION, INSPECTION, MAINTENANCE, REPAIR AND SERVICE OF RADIO, TELEVISION, RECORDING, VOICE SOU | $30.00 | $18.07 | $48.07 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.18 | $23.18 | $63.36 Above median +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $45.45 | $28.19 | $73.64 Above median +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $41.00 | $27.36 | $68.36 Above median +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $43.30 | $25.32 | $68.62 Above median +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $42.02 | $23.07 | $65.09 Above median +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERANS DAY THANKSGIVING DAY AND CHRISTMAS DAY | $42.00 | $24.15 | $66.15 Top 10% +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKS | $60.17 | $38.44 | $98.61 Top 10% +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FT. AND LESS THAN 600 CU. FT.), GENERATOR, HEATERS, MECHANICAL, HOISTS, HOIST, HOIST, OILERS, PUMPS, WELL POINTS AND ELECTRIC SUBMERSIBLE, SMALL RUBBE | $33.20 | $38.65 | $71.85 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $34.22 | $24.67 | $58.89 Above median +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $29.50 | $19.02 | $48.52 +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $36.03 | $20.55 | $56.58 Above median +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS | $39.50 | $28.19 | $67.69 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS | $35.10 | $19.39 | $54.49 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS | $23.00 | $14.40 | $37.40 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (ADAMS, ALLEN, BLACKFORD, DEKALB, DELAWARE, FULTON, GRANT, HUNTINGTON, JAY, MIAMI, NOBLE, STEUBEN, WABASH, WELLS, AND WHITLEY COUNTIES) | $35.40 | $26.92 | $62.32 Top 10% +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (BARTHOLOMEW; BENTON, BOONE; CARROLL; CASS; CLINTON; DELAWARE; FOUNTAIN; FULTON; GRANT; HAMILTON; HANCOCK; HENDRICKS; HOWARD; JOHNSON; MADI | $38.00 | $26.39 | $64.39 Top 10% +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (FULTON AND NOBLE COUNTIES) | $39.76 | $25.00 | $64.76 Top 10% +82% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS, SCAFFOLD BUILDERS, MECHANIC TENDERS, WINDOW WASHERS AND CLEANERS, RAILROAD WORKERS, MASONRY WALL | $28.06 | $18.55 | $46.61 Top 10% +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; MECHANIC TENDERS; WINDOW WASHERS AND CLEANERS; RAILROAD WORKERS; MASONRY WALL | $29.64 | $18.55 | $48.19 Top 10% +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; MECHANIC TENDERS; WINDOW WASHERS AND CLEANERS; RAILROAD WORKERS; MASONRY WALL | $28.43 | $18.55 | $46.98 Above median +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; MECHANIC TENDERS; WINDOW WASHERS AND CLEANERS; RAILROAD WORKERS; MASONRY WALL | $26.38 | $18.45 | $44.83 Bottom 10% +88% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; RAILROAD WORKERS; MASONRY WALL WASHERS; ALL PORTABLE WATER PUMPS WITH DISCHAR | $28.48 | $18.55 | $47.03 Top 10% +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 2 PLASTER TENDERS; MORTAR MIXERS; WELDERS; CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATOR; SCAFFOLD BUILDERS WHE | $30.39 | $18.55 | $48.94 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 2 PLASTER TENDERS; MORTAR MIXERS; WELDERS; CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATOR; SCAFFOLD BUILDERS WHE | $29.18 | $18.55 | $47.73 Above median +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 2 PLASTER TENDERS; MORTAR MIXERS; WELDERS; CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATOR; SCAFFOLD BUILDERS WHE | $26.88 | $18.45 | $45.33 Bottom 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 2 PLASTER TENDERS; MORTAR MIXERS; WELDERS; CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATORS; SCAFFOLD BUILDERS FO | $29.23 | $18.55 | $47.78 Top 10% +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 2 PLASTER TENDERS; MORTAR MIXERS; WELDERS; CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATORS; SCAFFOLD BUILDERS FO | $28.38 | $18.55 | $46.93 Bottom 10% +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 2 PLASTER TENDERS; MORTAR MIXERS; WELDERS; CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATORS; SCAFFOLD BUILDERS FO | $28.81 | $18.55 | $47.36 Above median +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 3 DYNAMITE MAN, MASON TENDERS; DRILLERS-AIR TRACK OR WAGON FOR EXPLOSIVES | $30.48 | $18.55 | $49.03 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 3 DYNAMITE MEN, MASON TENDERS; DRILLERS-AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES | $31.64 | $18.55 | $50.19 Top 10% +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 3 DYNAMITE MEN, MASON TENDERS; DRILLERS-AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES | $30.43 | $18.55 | $48.98 Bottom 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 3 DYNAMITE MEN-DRILLERS-AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES | $28.88 | $18.45 | $47.33 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 3 DYNAMITE MEN; MASON TENDERS; DRILLERS-AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES | $30.38 | $18.55 | $48.93 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 3 MASON TENDERS AND DYNAMITE MEN-DRILLERS-AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES | $30.06 | $18.55 | $48.61 Top 10% +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $37.68 | $27.84 | $65.52 +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $35.89 | $30.52 | $66.41 +82% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH & ROLLER, DRYWALL TAPING & FINISHING, VINYL/PAPER HANGING | $32.50 | $19.86 | $52.36 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER | $31.02 | $16.86 | $47.88 Above median +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER | $31.15 | $18.76 | $49.91 Above median +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $33.00 | $19.86 | $52.86 Top 10% +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY AND SANDBLASTING | $32.02 | $16.86 | $48.88 Bottom 10% +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY AND SANDBLASTING | $32.10 | $18.76 | $50.86 Top 10% +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRUSH & ROLLER | $41.00 | $31.26 | $72.26 Top 10% +200% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRUSH, ROLLER, PAPERHANGER, & DRYWALL FINISHING | $27.04 | $16.27 | $43.31 Top 10% +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRUSH; ROLLER; PAPERHANGING; DRYWALL FINISHERS | $25.10 | $16.39 | $41.49 Top 10% +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: DRYWALL FINISHER | $41.80 | $31.26 | $73.06 Top 10% +204% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: LEAD ABATEMENT | $32.24 | $16.27 | $48.51 Top 10% +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: SPRAY & SANDBLAST POT TENDERS AND GROUND PERSONNEL | $27.04 | $16.27 | $43.31 Top 10% +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST, & STEAM CLEANING | $27.04 | $16.27 | $43.31 Top 10% +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: SPRAY/WATERBLASTING; SANDBLASTING | $26.10 | $16.39 | $42.49 Top 10% +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF SERVICE; 6% FOR LESS THAN 5 YEARS' SERVICE | $62.27 | $38.44 | $100.71 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $26.81 | $12.40 | $39.21 +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $25.69 | $11.75 | $37.44 Bottom 10% +52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER: AREA #121 (BENTON, CARROLL, CASS, CLINTON, FOUNTAIN, HOWARD, MIAMI, MONTGOMERY, TIPPECANOE, WARREN, WHITE AND VERMILLION COUNTIES) | $33.76 | $20.05 | $53.81 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER: AREA #46 | $31.50 | $18.32 | $49.82 Top 10% +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER: AREA #83 (BLACKFORD, DELAWARE, GRANT, HAMILTON, HANCOCK, JAY, MADISON, TIPTON, AND WABASH COUNTIES) | $30.60 | $17.19 | $47.79 Top 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER AND STEAMFITTER | $45.06 | $23.16 | $68.22 Bottom 10% +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER AND STEAMFITTER | $50.05 | $20.39 | $70.44 Above median +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PIPEFITTER, STEAMFITTER | $44.93 | $23.03 | $67.96 Bottom 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBERS AND PIPEFITTERS | $46.42 | $21.33 | $67.75 Above median +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBERS AND PIPEFITTERS | $46.65 | $23.45 | $70.10 Above median +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBERS AND PIPEFITTERS (BARTHOLOMEW, BOONE, HAMILTON, HANCOCK, HENDRICKS, HOWARD, JOHNSON AND MARION COUNTIES; MIAMI COUNTY; MORGAN, SHELBY AND TIPT | $50.05 | $20.39 | $70.44 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1 MECHANIC, ASPHALT PLANT, ASPHALT SPREADER, AUTO GRADER; BATCH PLANT, BENOTO, BOILER AND THROTTLE VALVE, BORING MACHIN | $36.15 | $38.65 | $74.80 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 3 BUCK HOIST, COMBINATION, .CONVEYOR, GROUTING MACHINE, HOIST ELEVATORS, HYDRAULIC POWER UNITS, GROUTING AND PILE DRIVI | $34.00 | $38.65 | $72.65 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 5 BOBCATS AND FORKLIFTS | $30.60 | $38.65 | $69.25 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 1 A-FRAME WINCH TRUCK, AIR COMPRESSORS OVER 600 CU.FT., AIR TUGGER, AUTOGRADE, AUTO PATROL, BACKHOE, BALLAST REGULATO | $38.70 | $23.95 | $62.65 Top 10% +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 1 AIR COMPRESSOR; AIR TUGGER; AUTO PATROL; BACK FILLER; BACK HOE; BOOM CAT; BORING MACHINE; BULL DOZER; CAISSON DRILL | $37.08 | $19.96 | $57.04 Top 10% +64% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 1 AIR TUGGER; AUTO PATROL, BACK FILLER; BACK HOE; BOOM CAT; BORING MACHINE; BULL DOZER; CAISSON DRILLING MACHINE; CHE | $38.95 | $23.30 | $62.25 Top 10% +79% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 2 A FRAME TRUCK; BATCHER PLANT; BENDING MACHINE-POWER DRIVEN; BITUMINOUS MIXER; BITUMINOUS PAVER; BITUMINOUS PLANT EN | $36.13 | $19.96 | $56.09 Above median +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 2 AIR COMPRESSOR, BRAKEMAN, BULL FLOAT, CONCRETE MIXER, CONCRETE SPREADER OR PUDDLER, DECK ENGINE, DRILL HELPER, ELEC | $35.70 | $23.95 | $59.65 Top 10% +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 2 BENDING MACHINE POWER DRIVEN; BITUMINOUS MIXER; BITUMINOUS PAVER; BITUMINOUS PLANT ENGINEER; BOATMAN; BULL FLOAT; C | $38.00 | $23.30 | $61.30 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 3 AIR COMPRESSOR 210 CU FT & OVER, BITUMINOUS DISTRIBUTOR, CHAIR CART, CONCRETE CURING MACHINE, CONCRETE SAW, DOPE PO | $35.00 | $23.95 | $58.95 Top 10% +69% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 3 AIR COMPRESSOR; BITUMINOUS DISTRIBUTOR; CHAIR CART; CONCRETE CURING MACHINE; CONCRETE SAW; DOPE POT POWER AGITATED | $32.08 | $19.96 | $52.04 Top 10% +50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 3 BITUMINOUS DISTRIBUTOR; CHAIR CART; CONCRETE CUTING MACHINE; DEWATERING SYTEMS; DOPE POT POWER AGITATED; FLEX PLANE | $35.00 | $23.30 | $58.30 Top 10% +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 4 AIR COMPRESSOR, BITUMINOUS DISTRIBUTOR, CEMENT GUN, CONCRETE SAW, CONVEYOR, DECK HAND OILER, EARTH ROLLER, FORM GRA | $30.43 | $23.95 | $54.38 Top 10% +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 4 AIR COMPRESSOR; AIR COMPRESSOR; CONCRETE SAW; CONVEYOR; GENERATORS; OILER; OPERATING MINOR EQUIPMENT; POWER BROOM | $31.50 | $23.30 | $54.80 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 4 AIR COMPRESSOR; CONCRETE MIXER; CONVEYOR; GENERATOR; MECHANICAL HEATER; OILER; OPERATOR-2 PIECES OF MINER EQUIPMENT | $28.30 | $19.96 | $48.26 Top 10% +39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP A A-FRAME WINCH TRUCK, ARTICULATING DUMP, AUTOGRADE, AUTO PATROL, BALLAST REGULATOR, BATCHER PLANT, BENDING MACHINE | $43.43 | $19.60 | $63.03 Top 10% +81% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP B AIR COMPRESSOR, AIR COMPRESSOR WITH THROTTLE VALVE, BITUMINOUS DISTRIBUTOR, BRAKEMAN, BULLFLOAT, CEMENT GUN, CONCRE | $35.30 | $19.60 | $54.90 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $32.00 | $16.61 | $48.61 Above median +82% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: COMPOSITION | $34.55 | $21.04 | $55.59 Top 10% +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: SLATE & TILE | $36.05 | $21.04 | $57.09 Top 10% +113% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFERS | $32.00 | $16.61 | $48.61 Above median +82% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $40.19 | $27.33 | $67.52 Above median +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $44.45 | $30.45 | $74.90 Above median +161% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: INCLUDING HVAC DUCT WORK | $40.19 | $27.33 | $67.52 Bottom 10% +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: INCLUDING HVAC DUCT WORK | $44.85 | $27.51 | $72.36 Top 10% +153% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $44.20 | $27.88 | $72.08 Above median +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO FINISHER | $23.38 | $13.15 | $36.53 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO FINISHER.$ 25.33 14.19 BRICKLAYER, STONEMASON | $35.21 | $18.19 | $53.40 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO GRINDER FINISHER | $31.00 | $17.89 | $48.89 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER FINISHER | $35.50 | $23.62 | $59.12 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER MECHANIC | $36.30 | $22.04 | $58.34 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER/SETTER | $36.38 | $17.24 | $53.62 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER/SETTER | $37.97 | $18.06 | $56.03 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER/SETTER | $33.50 | $23.62 | $57.12 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE & MARBLE FINISHER | $25.33 | $14.19 | $39.52 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE & MARBLE FINISHER | $34.50 | $23.62 | $58.12 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE & MARBLE SETTER; MOSAIC WORKER | $37.22 | $18.05 | $55.27 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE & MARBLE FINISHER | $24.33 | $13.16 | $37.49 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE & MARBLE FINISHER | $23.38 | $13.15 | $36.53 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE & MARBLE SETTER; MOSAIC WORKER | $35.63 | $17.23 | $52.86 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER & MARBLE MASON MECHANIC | $31.55 | $19.08 | $50.63 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE, MARBLE & TERRAZZO FINISHER | $31.55 | $19.08 | $50.63 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE, MARBLE SETTER | $35.63 | $17.23 | $52.86 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE, MARBLE SETTER | $34.50 | $23.62 | $58.12 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILT MAST), GREASER ENGINEER, HIGHLIFT SHOVEL OR FRONT ENDLOADER 3 YD BUCKET AND UNDER, HOISTS, HYDRULIC BOOM TRUCK, POST HOLE DIGGER, PUMP CRETES (SQ | $34.80 | $38.65 | $73.45 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 1 SINGLE AXLE TRUCKS, SEVEN CU. YDS. OR LESS THAN TEN AND ONE-HALF TONS, DUPSTERS, SCOOP-MOBILES FIVE CU.YDS. AND UNDER OR LESS TH | $32.67 | $0.00 | $32.67 Top 10% +13% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 1 TRUCK DRIVER HELPER | $39.42 | $0.00 | $39.42 Top 10% +36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 1 TRUCK DRIVER HELPER A: $36.40 PER DAY & $450.00 PER WEEK | $32.67 | $0.00 | $32.67 Top 10% +13% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 1PICK-UP TRUCKS FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DA | $33.75 | $0.00 | $33.75 Top 10% +17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 2 DRIVERS ON TANDEM AXLE EIGHTEEN CU.YDS. OR TWENTY- FOUR TONS GROSS, SIX WHEEL TRUCKS, KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCK | $33.17 | $0.00 | $33.17 Top 10% +15% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 2 SINGLE AXLE TRUCKS FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LAB | $33.95 | $0.00 | $33.95 Top 10% +18% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 2 TRUCK DRIVER ON FORK LIFTS | $39.61 | $0.00 | $39.61 Top 10% +37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 2 TRUCK DRIVER ON FORK LIFTS & TRUCK DRIVER ON TANDEM, SEMI, OR TRI-AXLE A: $36.40 PER DAY & $450.00 PER WEEK | $33.17 | $0.00 | $33.17 Top 10% +15% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 3 KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, SEMI- TRAILER WATER TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, TOURNAPULLS, TOURNATRAILERS | $33.37 | $0.00 | $33.37 Top 10% +16% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 3 TANDEM, TRI-AXLE AND FUEL TRUCKS FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURT | $34.25 | $0.00 | $34.25 Top 10% +19% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 3 TRUCK DRIVER ON TANDEM, SEMI, OR TRI-AXLE | $39.71 | $0.00 | $39.71 Top 10% +37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 4 DRIVERS ON HEAVY EQUIPMENT OVER SIXTEEN CU.YDS. OR TWENTY-FOUR TON, SUCH AS KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, EUCLIDS | $33.52 | $0.00 | $33.52 Top 10% +16% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 4 SEMI-TRAILER TRUCKS FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LA | $34.75 | $0.00 | $34.75 Top 10% +20% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 4 TRUCK DRIVER ON WATER TRUCKS AND MECHANIC | $39.81 | $0.00 | $39.81 Top 10% +38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 5 MECHANIC FURNISHING HIS OWN TOOLS. A: $36.40 PER DAY & 450.00 PER WEEK | $34.02 | $0.00 | $34.02 Top 10% +18% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 5 TRUCK DRIVER EUCLID/EARTH MOVERS | $39.91 | $0.00 | $39.91 Top 10% +38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the DeKalb, IN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in DeKalb
Compliance Notes
- This wage determination applies to federal contracts for building construction in DeKalb, Indiana.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.