Heavy Construction — Will, Illinois
WD IL20260011-16732-hvy · Revision 2 · Effective May 20, 2026
The Davis-Bacon prevailing wage for AN EXTRA $.50 PER HOUR. UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDE in Will, Illinois (construction type: heavy) is $50.85/hr base + $51.05/hr fringe = $101.90/hr total package (WD IL20260011-16732-hvy, Rev. 2).
Scroll down for all 98 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| AN EXTRA $.50 PER HOUR. UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDE | $50.85 | $51.05 | $101.90 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| AN EXTRA $.50 PER HOUR. UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDE | $56.05 | $51.05 | $107.10 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN | $54.75 | $51.05 | $105.80 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $48.60 | $38.53 | $87.13 Top 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $51.00 | $36.13 | $87.13 Top 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, AND WHITESIDE COUNTIES) | $48.60 | $38.53 | $87.13 Top 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER AND PILEDRIVER | $49.76 | $38.26 | $88.02 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER AND PILEDRIVER (KANE, MCHENRY, AND KENDALL COUNTIES) | $52.01 | $38.86 | $90.87 Top 10% +147% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: BUILDING | $52.01 | $38.85 | $90.86 Top 10% +147% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: HEAVY & HIGHWAY | $52.01 | $38.85 | $90.86 Above median +147% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $46.25 | $45.10 | $91.35 Top 10% +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $50.70 | $40.60 | $91.30 Top 10% +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $48.50 | $42.82 | $91.32 Top 10% +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $41.03 | $36.39 | $77.42 Top 10% +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $38.00 | $24.03 | $62.03 Above median +67% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| COMBINATION - SMALL EQUIPMENT OPERATOR; DIRECTIONAL BORING MACHINE; GENERATORS - SMALL 50 KW AND UNDER; GENERATORS - LARGE , OVER 50 KW; HEATERS, MECH | $59.00 | $51.00 | $110.00 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $48.28 | $50.46 | $98.74 Top 10% +113% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $52.00 | $45.01 | $97.01 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $41.00 | $43.40 | $84.40 Top 10% +82% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (BOONE & DEKALB COUNTIES) | $62.61 | $43.96 | $106.57 Top 10% +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (DEKALB, KANE & KENDALL COUNTIES) | $60.17 | $43.50 | $103.67 Top 10% +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (KANE AND MCHENRY COUNTIES) | $59.11 | $42.23 | $101.34 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY | $59.17 | $27.12 | $86.29 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK; WORKING INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK FROM BOTTOM TO A HEIGHT OF 48 FEET; FORM STRIPPERS; M | $51.40 | $36.94 | $88.34 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (BOONE, DEKALB, AND MCHENRY COUNTIES) | $41.37 | $44.41 | $85.78 Top 10% +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (DEKALB, DUPAGE, KANE, KENDALL, AND MCHENRY COUNTIES) | $48.83 | $39.84 | $88.67 Top 10% +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (KENDALL AND WILL COUNTIES) | $47.80 | $42.50 | $90.30 Top 10% +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, ORNAMENTAL (LAKE, DUPAGE AND MCHENRY COUNTIES) | $59.26 | $44.81 | $104.07 Top 10% +114% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: SHEETER (DU PAGE, LAKE, AND MCHENRY COUNTIES) | $62.71 | $46.58 | $109.29 Top 10% +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: STRUCTURAL AND REINFORCING (DU PAGE, LAKE, AND MCHENRY COUNTIES) | $62.46 | $46.58 | $109.04 Top 10% +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1 COMMON LABORER, ASPHALT LABORER, ASPHALT PLANT LABORER, STRIPING LABORER, CLIPPER TYPE CONCRETE SAW, SELF-PROPELLED SAWS | $51.40 | $36.94 | $88.34 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1 GENERAL LABORERS; ASPHALT | $51.40 | $36.94 | $88.34 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 AIR TAMPERS & VIBRATORS | $51.68 | $36.94 | $88.62 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 CEMENT GUN LABORERS | $51.48 | $36.94 | $88.42 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 SEWER AND DRAIN PIPE LAYERS AND MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE USED, ON PUBLIC UTILITY WORK; PUMPCRETE PIPE HANDLERS | $51.75 | $36.94 | $88.69 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3 ASPHALT RAKERS; HOD CARRIERS; PLASTERER LABORERS; GUNNITE LABORERS, SLAB FOR SETTERS ON ROADS, HIGHWAYS, STREETS, AIRPORT RUNAWAYS, AN | $51.40 | $36.94 | $88.34 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3 MORTAR & CONCRETE MIXERS | $51.68 | $36.94 | $88.62 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 4 RAKERS AND LUTEMEN; MACHINE SCREWMAN; KETTLEMEN; MIXERMEN, DRUM-MEN; JACKHAMMERMEN; MITE BOX SPREADERS; LABORERS ON BIRCH OVERMAN AND | $51.40 | $36.94 | $88.34 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 4 STRINGLINE & FORM SETTER; TORCHMAN, SHEETING & CRIBBING, BLACK TOP RAKERS & LUTEMEN, MACHINE SCREWMEN | $51.68 | $36.94 | $88.62 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 5 CEMENT GUN NOZZLE | $51.60 | $36.94 | $88.54 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 5 CHAIN SAW MAN, JACKHAMMER MAN, DRILLMAN, CONCRETE BREADERS & AIR SPADE | $51.63 | $36.94 | $88.57 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 6 ALL UNDERGROUND CAVERN LABORERS; CAISSON LABORERS 50 FEET OR MORE BELOW GROUND LEVEL; LABORERS WORKING UNDER RADIO ACTIVE CONDITIONS | $51.75 | $36.94 | $88.69 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 6 ASBESTOS ABATEMENT LABORERS; TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS; DOSIMETER | $51.60 | $36.94 | $88.54 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 6 TUNNEL LABORERS, TILE LAYERS & BOTTOM MEN | $51.75 | $36.94 | $88.69 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 7 CAISSON DIGGERS, DYNAMITERS | $51.75 | $36.94 | $88.69 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 7 DOSIMETER USED FOR MONITORING NUCLEAR EXPOSURE; ASBESTOS ABATEMENT WORKER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER; AND CHIMNEY AND | $51.60 | $36.94 | $88.54 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 8 FLAGMAN | $51.40 | $36.94 | $88.34 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 9 ASBESTOS APATEMENT LABORERS, TOXIC & HAZARDOUS WASTE REMOVAL LABORERS & DOSIMETER MONITORING NUCLEAR EXPOSURE | $52.40 | $36.94 | $89.34 Top 10% +186% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, COMPRESSED AIR: 34 LBS AND OVER | $55.40 | $36.94 | $92.34 Top 10% +196% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, SEWER CONSTRUCTION: GROUP 1 SIGNALMEN TOP LABORERS, AND ALL OTHER LABORERS NOT MENTIONED | $51.40 | $36.94 | $88.34 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, SEWER CONSTRUCTION: GROUP 2 CONCRETE LABORERS; STEEL SETTERS | $51.53 | $36.94 | $88.47 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, SEWER CONSTRUCTION: GROUP 3 CEMENT CARRIERS; CEMENT MIXERS; CONCRETE REPAIRMEN; MORTAR MEN; SCAFFOLD MEN; AND SECOND BOTTOM MEN | $51.63 | $36.94 | $88.57 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, SEWER CONSTRUCTION: GROUP 4 BOTTOM MEN; BRACERS-BRACING; BRICKLAYER'S TENDER; CATCH BASIN DIGGER; DRAINLAYER; DYNAMITER; FORM MEN; JACKHAMMER | $51.75 | $36.94 | $88.69 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, SEWER CONSTRUCTION: GROUP 5 ASBESTOS ABATEMENT LABORERS, TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS & DOSIMETER USE MONITORING NUCLEAR EXPOSU | $51.40 | $36.94 | $88.34 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TUNNEL: GROUP 1 CAGE TENDERS; DUMPMEN; FLAGMEN; SIGNALMEN; TOP LABORERS | $51.40 | $36.94 | $88.34 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TUNNEL: GROUP 2 AIR HOIST OPERATOR; KEY BOARD OPERATOR; CONCRETE LABORER; GROUT; LOCK TENDERS; STEEL SETTERS; TUGGERS; SWITCHMEN; CAR PUSHER | $51.53 | $36.94 | $88.47 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TUNNEL: GROUP 3 CONCRETE REPAIRMEN; LOCK TENDERS; MORTAR MEN; MUCKERS; GROUT MACHINE OPERATORS; TRACK LAYERS | $51.63 | $36.94 | $88.57 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TUNNEL: GROUP 4 AIR TRAC DRILL OPERATOR; MINER; BRICKLAYER TENDERS; CONCRETE BLOWER OPERATOR; DRILLERS; DYNAMITERS; ERECTOR OPERATOR; FORM ME | $51.75 | $36.94 | $88.69 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TUNNEL: GROUP 5 ASBESTOS ABATEMENT LABORER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER; DOSIMETER MONITORING NUCLEAR EXPOSURE | $51.40 | $36.94 | $88.34 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GENERAL LABORER GENERAL LABORER: CARPENTER TENDER, TOOL CRIBMAN, FIREMAN OR SALAMANDER TENDER, FLAGMAN, GRAVEL BOX MAN, BUMPMAN & SPOTTER, FO | $47.04 | $36.31 | $83.35 Top 10% +167% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: SKILLED LABORER SKILLED LABORER: ASBESTOS ABATEMENT WORKER; HAZARDOUS WASTE WORKER HANDLING ANY MATERIALS WITH ANY FOREIGN MATTER HARMFUL TO | $50.39 | $36.31 | $86.70 Top 10% +178% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY | $49.22 | $23.73 | $72.95 Top 10% +43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN | $48.44 | $29.09 | $77.53 Top 10% +52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY | $37.81 | $19.86 | $57.67 Top 10% +13% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY | $39.19 | $20.32 | $59.51 Top 10% +17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: LINEMAN AND EQUIPMENT OPERATOR | $62.10 | $37.29 | $99.39 Top 10% +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 2 BATCH PLANT*; BITUMINOUS MIXER; BOILER AND THROTTLE VALVE; BULLDOZER; CAR LOADER TRAILING CONVEYORS; COMBINATION BA | $62.45 | $51.00 | $113.45 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER; CONCRETE MIXER, TWO BAG AN | $60.40 | $51.00 | $111.40 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 5 BOBCATS; BRICK FORKLIFTS; OILERS; DIRECTIONAL BORING | $57.80 | $51.00 | $108.80 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.09 | $13.40 | $58.49 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.89 | $13.40 | $58.29 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.69 | $13.40 | $58.09 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.54 | $13.40 | $57.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.38 | $0.30 | $45.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.18 | $0.30 | $45.48 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.98 | $0.30 | $45.28 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.83 | $0.30 | $45.13 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH ONLY | $53.05 | $33.91 | $86.96 Top 10% +190% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, DRYWALL TAPER/FINISHER, SANDBLASTER, AND SPRAY | $53.05 | $27.63 | $80.68 Top 10% +169% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL | $45.15 | $29.41 | $74.56 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED | $56.60 | $51.05 | $107.65 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $37.90 | $37.66 | $75.56 Top 10% +89% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MO | $53.30 | $51.05 | $104.35 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL DEVICE MONITOR | $43.40 | $22.71 | $66.11 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 2 - 3 AXLES FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX AXLES | $48.47 | $26.70 | $75.17 Top 10% +161% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 2 OR 3 AXLE TRUCKS FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION $562.80 PER WEEK. B. LOWBOY IS AN ADDITIONAL $1.50 PER HOUR | $46.12 | $0.30 | $46.42 Top 10% +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 2-3 AXLES FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX AXLES. LOW-BOY IS AN ADDITIONAL $1 | $45.31 | $0.30 | $45.61 Top 10% +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 4 AXLE TRUCKS FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION $562.80 PER WEEK. B. LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN A | $46.27 | $0.30 | $46.57 Top 10% +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 4 AXLES FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX AXLES. LOW-BOY IS AN ADDITIONAL $1.50 | $45.46 | $0.30 | $45.76 Top 10% +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 4 AXLES FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX AXLES | $48.62 | $26.70 | $75.32 Top 10% +162% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 5 AXLE TRUCKS FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION $562.80 PER WEEK. B. LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN A | $46.47 | $0.30 | $46.77 Top 10% +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 5 AXLES FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX AXLES. LOW-BOY IS AN ADDITIONAL $1.50 | $45.66 | $0.30 | $45.96 Top 10% +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 5 AXLES FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX AXLES | $48.82 | $26.70 | $75.52 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 6 AXLE TRUCKS FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION $562.80 PER WEEK. B. LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN A | $46.67 | $0.30 | $46.97 Top 10% +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 6 AXLES FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX AXLES. LOW-BOY IS AN ADDITIONAL $1.50 | $45.86 | $0.30 | $46.16 Top 10% +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 6 AXLES FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX AXLES | $48.93 | $26.70 | $75.63 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| VIBRATORS-ANY TYPE-8 FEET OR MORE BELOW GROUND LEVEL | $51.75 | $36.94 | $88.69 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| WHEEL EXCAVATOR* & WIDENER; RAISED OR BLIND HOE DRILL, TUNNEL & SHAFT | $63.00 | $51.00 | $114.00 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Will, IL — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Will
Compliance Notes
- This wage determination applies to federal contracts for heavy construction in Will, Illinois.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.