Residential Construction — Whiteside, Illinois
WD IL20260026-16752-res · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BRICKLAYER in Whiteside, Illinois (construction type: residential) is $13.74/hr base + $2.55/hr fringe = $16.29/hr total package (WD IL20260026-16752-res, Rev. 1).
Scroll down for all 54 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $13.74 | $2.55 | $16.29 Bottom 10% -61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, INCLUDING DRYWALL HANGING AND BATT INSULATION (CARROLL, LEE, AND WHITESIDE COUNTIES) Rate A | $31.32 | $26.23 | $57.55 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, INCLUDING DRYWALL HANGING AND BATT INSULATION (CARROLL, LEE, AND WHITESIDE COUNTIES) Rate B | $24.61 | $15.94 | $40.55 Top 10% +10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: INCLUDING DRYWALL HANGING AND BATT INSULATION | $30.00 | $33.60 | $63.60 Above median +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: INCLUDING DRYWALL HANGING AND BATT INSULATION | $20.24 | $14.74 | $34.98 Bottom 10% -5% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: INCLUDING DRYWALL HANGING AND BATT INSULATION | $30.22 | $29.94 | $60.16 Above median +64% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: INCLUDING DRYWALL HANGING AND BATT INSULATION | $33.40 | $24.85 | $58.25 +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: INCLUDING DRYWALL HANGING AND BATT INSULATION | $44.46 | $40.96 | $85.42 Top 10% +133% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: RATE A: MULTI-UNIT BUILDING CONTAINING MORE THAN 8 UNITS | $31.32 | $26.23 | $57.55 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: RATE B: SINGLE FAMILY HOME DUPLEX AND A MULTI-UNIT BUILDING UP TO AND INCLUDING 8 UNITS | $24.61 | $15.94 | $40.55 Top 10% +10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $10.69 | $2.49 | $13.18 -65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $15.00 | $0.00 | $15.00 -72% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (BUREAU, FORD, IROQUOIS, LA SALLE, PUTNAM & STARK COUNTIES) | $45.33 | $33.33 | $78.66 Top 10% +70% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (CARROLL, JO DAVIESS, AND WHITESIDE COUNTIES) | $19.60 | $17.81 | $37.41 Top 10% -19% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (CARROLL, JO DAVIESS, LEE, AND WHITESIDE COUNTIES) | $30.61 | $28.17 | $58.78 Top 10% +27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (FORD, IROQUOIS, LA SALLE, MARSHALL, PUTNAM AND LIVINGSTON COUNTIES) | $25.02 | $15.23 | $40.25 Top 10% -13% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (IROQUOIS, AND VERMILION COUNTIES) | $28.32 | $10.18 | $38.50 Top 10% -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (JO DAVIESS COUNTY) | $42.45 | $20.55 | $63.00 Top 10% +36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (PEORIA DIVISION - MARSHALL AND STARK COUNTIES) | $26.58 | $18.50 | $45.08 Top 10% -3% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELLIOT, GIBSON CITY, HARPSTER, MELVIN, PAXTON, ROBERTS & SIBLEY), JO DAVIESS, LASALLE, LEE, LIVINGSTON, PUTNAM, WHITESIDE COUNTIES) | $47.64 | $25.42 | $73.06 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELLIOT, GIBSON CITY, HARPSTER, MELVIN, PAXTON, ROBERTS & SIBLEY), JO DAVIESS, LASALLE, LEE, LIVINGSTON, PUTNAM, WHITESIDE COUNTIES) | $46.54 | $25.42 | $71.96 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| ELLIOT, GIBSON CITY, HARPSTER, MELVIN, PAXTON, ROBERTS & SIBLEY), JO DAVIESS, LASALLE, LEE, LIVINGSTON, PUTNAM, WHITESIDE COUNTIES) | $45.29 | $25.42 | $70.71 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELLIOT, GIBSON CITY, HARPSTER, MELVIN, PAXTON, ROBERTS & SIBLEY), JO DAVIESS, LASALLE, LEE, LIVINGSTON, PUTNAM, WHITESIDE COUNTIES) | $46.15 | $25.42 | $71.57 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELLIOT, GIBSON CITY, HARPSTER, MELVIN, PAXTON, ROBERTS & SIBLEY), JO DAVIESS, LASALLE, LEE, LIVINGSTON, PUTNAM, WHITESIDE COUNTIES) | $45.88 | $25.42 | $71.30 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| FLOOR LAYER: CARPET | $18.05 | $2.64 | $20.69 -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, UNSKILLED | $11.39 | $4.48 | $15.87 Above median -49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.83 | $0.30 | $45.13 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER, EXCLUDING DRYWALL FINISHING: BRUSH | $40.00 | $26.90 | $66.90 Top 10% +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH ONLY, EXCLUDING DRYWALL FINISHING: NEW APARTMENTS AND CONDOMINIUMS THREE STORIES AND OVER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PR | $35.29 | $14.50 | $49.79 Top 10% +66% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH ONLY: EXCLUDING DRYWALL FINISHING | $45.15 | $29.41 | $74.56 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH ONLY: EXCLUDING DRYWALL FINISHING | $40.00 | $26.90 | $66.90 Bottom 10% +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH ONLY: EXCLUDING DRYWALL FINISHING | $41.00 | $27.80 | $68.80 Above median +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH: EXCLUDING DRYWALL FINISHING | $30.00 | $17.37 | $47.37 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $14.61 | $3.17 | $17.78 -62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $13.29 | $3.07 | $16.36 Bottom 10% -64% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UN | $45.29 | $25.42 | $70.71 +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 2 (IROQUOIS, VERMILION COUNTIES) | $45.88 | $25.42 | $71.30 Top 10% +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 3 (IROQUOIS, VERMILION COUNTIES) | $46.15 | $25.42 | $71.57 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 3.$ 44.10 24.27 TRUCK DRIVER, GROUP 2.$ 43.83 24.27 TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRES | $43.24 | $24.27 | $67.51 Top 10% +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS | $44.49 | $24.27 | $68.76 Bottom 10% +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (IROQUOIS, VERMILION COUNTIES) | $46.54 | $25.42 | $71.96 Top 10% +150% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK | $45.59 | $24.27 | $69.86 Bottom 10% +143% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (IROQUOIS, VERMILION COUNTIES) | $47.64 | $25.42 | $73.06 Top 10% +154% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 2 OR 3 AXLE TRUCKS (FORD, AND LIVINGSTON COUNTIES) FOOTNOTES: A. $1055.60 PER WEEK. B. LOWBOY WORK CLASSIFICATION IS AN ADITIONAL $1.50 | $44.82 | $0.25 | $45.07 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 2 OR 3 AXLES (IROQUOIS COUNTY) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONA | $44.82 | $0.25 | $45.07 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 4 AXLE TRUCKS (FORD, AND LIVINGSTON COUNTIES) FOOTNOTES: A. $1055.60 PER WEEK. B. LOWBOY WORK CLASSIFICATION IS AN ADITIONAL $1.50 PER H | $44.97 | $0.25 | $45.22 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 4 AXLES (IROQUOIS COUNTY) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.2 | $44.97 | $0.25 | $45.22 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 4 AXLES (LEE COUNTY) FOOTNOTE: A.HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $ | $44.98 | $0.30 | $45.28 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 5 AXLE TRUCKS (FORD, AND LIVINGSTON COUNTIES) FOOTNOTES: A. $1055.60 PER WEEK. B. LOWBOY WORK CLASSIFICATION IS AN ADITIONAL $1.50 PER H | $45.17 | $0.25 | $45.42 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 5 AXLES (IROQUOIS COUNTY) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.2 | $45.17 | $0.25 | $45.42 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 5 AXLES (LEE COUNTY) FOOTNOTE: A.HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $ | $45.18 | $0.30 | $45.48 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 6 AXLE TRUCKS (FORD, AND LIVINGSTON COUNTIES) FOOTNOTES: A. $1055.60 PER WEEK. B. LOWBOY WORK CLASSIFICATION IS AN ADITIONAL $1.50 PER H | $45.37 | $0.25 | $45.62 Top 10% +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 6 AXLES (IROQUOIS COUNTY) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.2 | $45.37 | $0.25 | $45.62 Top 10% +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 6 AXLES (LEE COUNTY) FOOTNOTE: A.HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $ | $45.38 | $0.30 | $45.68 Top 10% +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Whiteside, IL — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Compliance Notes
- This wage determination applies to federal contracts for residential construction in Whiteside, Illinois.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.