Building Construction — Sangamon, Illinois
WD IL20260004-16769-bld · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Sangamon, Illinois (construction type: building) is $43.48/hr base + $27.24/hr fringe = $70.72/hr total package (WD IL20260004-16769-bld, Rev. 2).
Scroll down for all 31 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $43.48 | $27.24 | $70.72 Above median +195% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $45.50 | $35.30 | $80.80 Above median +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $28.48 | $25.74 | $54.22 +48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER - PILEDRIVER | $32.64 | $25.74 | $58.38 +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER AND LATHER | $31.64 | $25.74 | $57.38 +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $28.51 | $21.93 | $50.44 Above median +35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN Residential Construction | $24.83 | $17.12 | $41.95 -9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $39.77 | $22.73 | $62.50 Above median +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $36.20 | $31.35 | $67.55 Above median +39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $32.90 | $29.26 | $62.16 Above median +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $35.90 | $29.26 | $65.16 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE, TILE & TERRAZZO WORKERS | $32.20 | $18.51 | $50.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $33.06 | $29.36 | $62.42 +72% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BUILDING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM | $32.23 | $20.58 | $52.81 +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: RESIDENTIAL EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM | $29.73 | $20.58 | $50.31 +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $28.50 | $19.12 | $47.62 +19% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PIPEFITTER, STEAMFITTER | $37.88 | $25.71 | $63.59 Bottom 10% +37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PIPEFITTER, STEAMFITTER | $43.89 | $25.71 | $69.60 +50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1 ASPHALT PLANT ENGINEER; ASPHALT SCREED MAN; APSCO CONCRETE SPREADER; ASPHALT PAVER; ASPHALT ROLLER ON BITUMINOUS CONT | $40.71 | $28.75 | $69.46 Above median +49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 2 ASPHALT BOOSTER & HEATER; ASPHALT DISTRIBUTOR; ASPHALT PLANT FIREMAN;BUILDING ELEVATOR; BULL FLOAT OR FLEXPLANE; CONC | $38.18 | $28.75 | $66.93 Bottom 10% +44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 3 AIR COMPRESSOR, TRACK OR SELF-PROPELLED; BULK CEMENT BATCHING- PLANTS; CONVEYORS; CONCRETE MIERS FIREMENT, GENERATORS | $34.30 | $28.75 | $63.05 Top 10% +35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 4 LATTICE BOOM CRAWLER CRANE, LATTICE BOOM TRUCK CRANE, TELESCOPIC TRUCK MOUNTED CRANE, TOWER CRANE PREMIUM PAY- CRANES | $42.32 | $28.75 | $71.07 Top 10% +52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $36.00 | $26.36 | $62.36 Above median +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $26.73 | $26.48 | $53.21 +18% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $38.54 | $30.37 | $68.91 Above median +53% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 1: DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE U | $45.35 | $25.72 | $71.07 +147% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 3- 2, 3 OR 4 AXLES HAULING 16 TONS OR MORE; 5-AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTICULATED DUMP TRUCKS; ME | $46.25 | $25.72 | $71.97 +150% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 4: LOW BOY AND OIL DISTRIBUTORS | $46.60 | $25.72 | $72.32 +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK | $47.71 | $25.72 | $73.43 +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| VACATION PAY CREDIT FORE EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE; AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE B) PAID HOLIDAYS: NEW YEAR'S DAY; MEMO | $57.99 | $38.44 | $96.43 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB.CAPACITY; WINCH TRUCK | $45.93 | $25.72 | $71.65 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Sangamon, IL — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Sangamon
Compliance Notes
- This wage determination applies to federal contracts for building construction in Sangamon, Illinois.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.