Building Construction — Randolph, Illinois
WD IL20260001-15757-bld · Revision 5 · Effective May 20, 2026
The Davis-Bacon prevailing wage for (BUREAU, LA SALLE, LIVINGSTON, AND PUTNAM COUNTIES) in Randolph, Illinois (construction type: building) is $59.15/hr base + $51.00/hr fringe = $110.15/hr total package (WD IL20260001-15757-bld, Rev. 5).
Scroll down for all 295 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| (BUREAU, LA SALLE, LIVINGSTON, AND PUTNAM COUNTIES) | $59.15 | $51.00 | $110.15 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS ABATEMENT WORKER | $35.25 | $28.34 | $63.59 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS ABATEMENT WORKER | $33.38 | $25.06 | $58.44 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS ABATEMENT WORKER | $33.95 | $27.28 | $61.23 | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANIC | $55.02 | $35.75 | $90.77 Top 10% +279% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANIC | $45.91 | $33.45 | $79.36 Bottom 10% +231% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI | $45.88 | $38.15 | $84.03 +251% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI | $36.06 | $24.35 | $60.41 Bottom 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BASE MACHINE MEN | $31.13 | $21.09 | $52.22 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BASE MACHINE MEN | $33.90 | $15.99 | $49.89 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN | $51.60 | $51.05 | $102.65 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN | $53.60 | $51.05 | $104.65 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN | $56.05 | $51.05 | $107.10 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN | $56.75 | $51.05 | $107.80 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BLACK TOP PLANT OILER | $43.15 | $39.10 | $82.25 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $45.23 | $32.76 | $77.99 +70% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $45.50 | $35.30 | $80.80 Above median +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $40.20 | $23.59 | $63.79 Above median +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $35.01 | $23.14 | $58.15 Above median +40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER (ADAMS, BROWN, CASS, GREENE, HANCOCK, MACOUPIN, MORGAN, MCDONOUGH, PIKE, SCHUYLER, AND SCOTT COUNTIES) | $30.79 | $21.69 | $52.48 Top 10% +26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON | $29.51 | $20.35 | $49.86 Bottom 10% +20% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON | $30.59 | $23.19 | $53.78 Above median +30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON | $40.00 | $24.72 | $64.72 Above median +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON | $43.80 | $27.23 | $71.03 Top 10% +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON | $30.79 | $21.69 | $52.48 +26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON | $33.49 | $24.93 | $58.42 Above median +41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: BRICKLAYER, MARBLE, TERRAZZO WORKER, AND TILE LAYER (BOND, CALHOUN, CLINTON, JERSEY, MACOUPIN, MONROE, MONTGOMERY, AND WASHINGTON COUNTIES | $33.13 | $22.05 | $55.18 Top 10% +33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER (CARROLL, HENRY, JO DAVIESS, MERCER, WHITESIDE, AND ROCK ISLAND COUNTIES) | $47.00 | $28.64 | $75.64 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $39.00 | $37.45 | $76.45 Top 10% +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, LATHER, PILEDRIVER, AND MILLWRIGHT DIVERS | $38.62 | $18.90 | $57.52 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, LATHER, SOFT FLOOR LAYER (BOONE, OGLE, AND WINNEBAGO COUNTIES) | $47.25 | $37.87 | $85.12 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER/LATHER | $34.30 | $29.94 | $64.24 Top 10% +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER/LATHER | $33.58 | $29.10 | $62.68 Above median +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER/LATHER | $33.57 | $29.10 | $62.67 Above median +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER/LATHER | $32.83 | $27.45 | $60.28 +64% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER/LATHER | $31.39 | $25.99 | $57.38 Bottom 10% +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER/LATHER | $34.14 | $28.60 | $62.74 Top 10% +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER/LATHER | $34.10 | $28.60 | $62.70 Above median +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER/LATHER | $33.36 | $28.60 | $61.96 Above median +69% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER/LATHER: (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, AND WHITESIDE) | $42.14 | $37.12 | $79.26 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER/LATHER: DEKALB, LEE, OGLE | $50.41 | $38.53 | $88.94 Top 10% +142% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: CARPENTERS, LATHERS, CARPET, LINOLEUM, AND SOFT TILE LAYERS | $34.25 | $29.53 | $63.78 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: LATHER, PILEDRIVER AND MILLWRIGHT (CLINTON, MONROE RANDOLPH, AND WASHINGTON COUNTIES) | $41.36 | $18.90 | $60.26 Top 10% +64% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: LATHER, PILEDRIVER, AND MILLWRIGHT | $41.36 | $18.90 | $60.26 Top 10% +64% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPET INSTALLER: CARPET, LINOLEUM, HARDWOOD AND TILE LAYER (CLINTON, MONROE RANDOLPH, AND WASHINGTON COUNTIES) | $36.08 | $18.90 | $54.98 Top 10% +165% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPET INSTALLER: CARPET, LINOLEUM, HARDWOOD, AND TILE LAYER | $36.08 | $18.90 | $54.98 Top 10% +165% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CATV INSTALLER (BUREAU, HENRY, LA SALLE, PUTNAM, & STARK COUNTIES) | $37.50 | $32.78 | $70.28 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, AND MONTGOMERY COUNTIES) | $39.00 | $30.60 | $69.60 Top 10% +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON AND PLASTERER (BUREAU, LA SALLE, MARSHALL, PUTNAM, AND WOODFORD COUNTIES) | $40.50 | $33.54 | $74.04 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $50.70 | $40.60 | $91.30 Top 10% +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $41.03 | $36.39 | $77.42 Top 10% +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER (ADAMS, BROWN, CASS, FULTON, HANCOCK, MCDONOUGH, MENARD, PIKE, AND SCHUYLER COUNTIES) | $31.80 | $26.89 | $58.69 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER (FULTON, KNOX, MERCER, AND WARREN COUNTIES) | $29.14 | $20.42 | $49.56 Above median +33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER (FULTON, MARSHALL, MASON, AND WOODFORD COUNTIES) | $30.52 | $25.22 | $55.74 Top 10% +50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER (HENDERSON, MERCER, ROCK ISLAND, AND WHITESIDE COUNTIES) | $28.16 | $23.48 | $51.64 Top 10% +39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER (HENRY, LIVINGSTON, AND STARK COUNTIES) | $36.70 | $22.08 | $58.78 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER (LIVINGSTON, MCLEAN, AND WOODFORD COUNTIES) | $32.12 | $22.29 | $54.41 Above median +46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASONS & PLASTERERS | $30.83 | $18.06 | $48.89 Top 10% +31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| EACH FOOT ABOVE 200 MULTIPLE UNIT MACHINE - 1.00 PER HOUR; UNDERGROUND WORK - 1.00 PER HOUR; UNDER AIR PRESSURE - 1.00 PER HOUR; HAZARDOUS WASTE OR AS | $34.30 | $28.75 | $63.05 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICAL LOW VOLTAGE WIRING INSTALLER, BUILDING (ALEXANDER, BOND, CLAY, CLINTON, EDWARDS, EFFINGHAM, FAYETTE, FRANKLIN, GALLATIN, HAMILTON, HARDIN | $38.44 | $19.37 | $57.81 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICAL LOW VOLTAGE WIRING INSTALLER, BUILDING (CHAMPAIGN, DEWITT, DOUGLAS, FORD, IROQUIOS, LASALLE, LIVINGSTON, MARSHALL, PIATT, PUTNAM, AND WOODF | $36.25 | $21.65 | $57.90 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICAL LOW VOLTAGE WIRING INSTALLER: BUILDING Installation, service and maintenance of low-voltage systems which utilizes the transmission and/or | $37.70 | $23.40 | $61.10 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICAL LOW VOLTAGE WIRING INSTALLER: BUILDING Installation, service and maintenance of low-voltage systems which utilizes the transmission and/or | $39.66 | $21.44 | $61.10 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICAL LOW VOLTAGE WIRING INSTALLER: BUILDING Installation, service and maintenance of low-voltage systems which utilizes the transmission and/or | $40.63 | $20.47 | $61.10 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICAL LOW VOLTAGE WIRING INSTALLER: BUILDING Installation, service and maintenance of low-voltage systems which utilizes the transmission and/or | $35.27 | $15.65 | $50.92 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICAL LOW VOLTAGE WIRING INSTALLER: BUILDING Installation, service and maintenance of low-voltage systems which utilizes the transmission and/or | $40.64 | $20.46 | $61.10 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICAL LOW VOLTAGE WIRING INSTALLER: BUILDING Installation, service and maintenance of low-voltage systems which utilizes the transmission and/or | $36.91 | $20.99 | $57.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (BOND, CLINTON, MACOUPIN, MONROE, MONTGOMERY, RANDOLPH, AND WASHINGTON COUNTIES) | $52.41 | $30.27 | $82.68 Top 10% +78% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (BUREAU, HENRY, LA SALLE, PUTNAM AND STARK COUNTIES) | $50.45 | $44.96 | $95.41 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (CALHOUN, GREEN, JERSEY, AND MACOUPIN COUNTIES) | $54.53 | $29.46 | $83.99 Top 10% +81% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (CARROLL, HENRY, JO DAVIESS, MERCER, WHITESIDE, AND ROCK ISLAND COUNTIES) | $46.00 | $28.56 | $74.56 Top 10% +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (CASS, LOGAN, MACOUPIN, MASON, MENARD, MONTGOMERY, MORGAN, AND SCOTT COUNTIES) | $39.80 | $23.08 | $62.88 Top 10% +36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (DE KALB COUNTY) | $60.17 | $43.50 | $103.67 Top 10% +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (GALESBURG DIVISION - FULTON, HENDERSON, KNOX, MCDONOUGH, MERCER, AND WARREN COUNTIES) | $45.65 | $26.77 | $72.42 Top 10% +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (JO DAVIESS COUNTY) | $42.45 | $20.55 | $63.00 Top 10% +36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (LA SALLE, LIVINGSTON, MCLEAN, MARSHALL, PUTNAM, AND WOODFORD COUNTIES) | $49.63 | $22.51 | $72.14 Top 10% +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (MC LEAN AND WOODFORD COUNTIES) | $43.86 | $23.72 | $67.58 Top 10% +46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (PEORIA DIVISION - FULTON; MASON; AND STARK COUNTIES) | $39.50 | $24.24 | $63.74 Top 10% +38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (PEORIA DIVISION - MARSHALL AND WOODFORD COUNTIES) | $45.65 | $26.77 | $72.42 Top 10% +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (QUINCY DIVISION - ADAMS, BROWN, HANCOCK, MCDONOUGH, PIKE, AND SCHUYLER COUNTIES) | $35.00 | $20.67 | $55.67 Top 10% +20% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, ELECTRICAL TECHNICIAN (DE KALB COUNTY) Work includes the installation, maintenance and removal of telecommunication facilities, telephone | $49.70 | $38.45 | $88.15 Top 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC FOOTNOTES: A) EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF | $62.73 | $38.44 | $101.17 Top 10% +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC FOOTNOTES: A. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SE | $57.99 | $38.44 | $96.43 Top 10% +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FIRE STOP TECHNICIAN | $44.02 | $32.76 | $76.78 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| FIRE STOP TECHNICIAN | $36.73 | $31.21 | $67.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $39.74 | $27.78 | $67.52 Above median +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $33.37 | $21.80 | $55.17 +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $35.37 | $21.80 | $57.17 Above median +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $48.28 | $28.50 | $76.78 Above median +166% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER (ADAMS, BROWN, CASS, LOGAN, MACOUPIN, MASON, MENARD, MONTGOMERY, MORGAN, PIKE, SCHUYLER, AND SCOTT COUNTIES) | $39.77 | $22.73 | $62.50 Top 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER (BOND, CALHOUN, CLINTON, GREENE, JACKSON, JERSEY, MACOUPIN, MADISON, MARION, MONROE, PERRY, RANDOLPH, ST. CLAIR, AND WASHINGTON COUNTIES) | $43.32 | $25.43 | $68.75 Top 10% +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, W | $41.27 | $32.76 | $74.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, W | $34.43 | $31.21 | $65.64 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (ADAMS, BROWN, CASS, FULTON, GREENE, LOGAN, MACOUPIN, MASON, MENARD, MONTGOMERY MORGAN, PIKE, SCHUYLER, AND SCOTT COUNTIES) | $36.20 | $31.35 | $67.55 Top 10% +39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (ADAMS, HANCOCK, HENDERSON, KNOX, MC DONOUGH, MERCER, SCHUYLER, AND WARREN COUNTIES) | $36.30 | $25.80 | $62.10 Top 10% +28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, MONTGOMERY, RANDOLPH, AND WASHINGTON COUNTIES) | $41.65 | $31.18 | $72.83 Top 10% +50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (BOONE, CARROLL, DEKALB, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE, AND WINNEBAGO COUNTIES) | $41.37 | $44.41 | $85.78 Top 10% +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (CARROLL, HENRY, JO DAVIESS, KNOX, MERCER, ROCK ISLAND, WARREN, AND WHITESIDE COUNTIES) | $38.25 | $32.28 | $70.53 Top 10% +45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (DEKALB COUNTY) | $48.83 | $39.84 | $88.67 Top 10% +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (FULTON, KNOX, LIVINGSTON, MCLEAN, MARSHALL, MASON, STARK, AND WOODFORD COUNTIES) | $39.24 | $33.88 | $73.12 Top 10% +51% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (LA SALLE, MARSHALL, AND PUTNMAN COUNTIES) | $45.50 | $38.90 | $84.40 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (MCLEAN COUNTY) | $37.71 | $29.65 | $67.36 Top 10% +39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $33.00 | $28.34 | $61.34 Above median +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $31.13 | $25.06 | $56.19 Above median +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $31.70 | $27.28 | $58.98 Above median +89% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $34.00 | $30.04 | $64.04 Top 10% +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER : CARPENTER TENDER; TOOL CRIBMEN; FIREMEN OR ALAMANDER TENDER; FLAGMAN; GRAVEL BOX MEN, DUMPMEN & SPOTTERS; FORM HANDLERS; MATERIAL HANDLERS | $40.47 | $34.05 | $74.52 Top 10% +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1 CARPENTER TENDERS; MASON TENDERS; PLASTERERS TENDERS; MORTAR MIXERS; KETTLEMEN AND CARRIER OF HOT STUFF; TOOL CRIB MEN; FIRMEN OR SALA | $36.59 | $27.04 | $63.63 Top 10% +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1 COMMON LABORER, BOBCAT, FORKLIFT | $51.40 | $36.94 | $88.34 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1 GENERAL LABORER | $32.84 | $27.89 | $60.73 Bottom 10% +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1 GENERAL LABORER | $34.14 | $30.59 | $64.73 Top 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1 GENERAL LABORER (CLINTON COUNTY) | $35.38 | $29.35 | $64.73 Top 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1 UNSKILLED - ALL CLASSIFICATIONS NOT LISTED BELOW | $40.54 | $32.42 | $72.96 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER | $33.34 | $27.89 | $61.23 Bottom 10% +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER | $34.64 | $30.59 | $65.23 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (CLINTON COUNTY) | $35.88 | $29.35 | $65.23 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 DYNAMITE MEN; ASBESTOS ABATEMENT LABORER; HAZARDOUS WASTE WORKER (LIVINGSTON, MARSHALL, STARK, AND WOODFORD COUNTIES) | $38.59 | $27.04 | $65.63 Top 10% +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 POWER VIRBRATOR | $51.75 | $36.94 | $88.69 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 SEMI-SKILLED - HANDLING OF MATERIALS TREATED WITH OIL, CREOSOTE, ASPHALT AND/OR FORIEGN MATERIAL HARMFUL TO SKIN OR CLOTHING; TRACK LA | $40.54 | $32.42 | $72.96 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3 DYNAMITE MAN (CLINTON COUNTY) | $36.88 | $29.35 | $66.23 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3 DYNAMITE MAN AND POWDER MAN | $34.34 | $27.89 | $62.23 Bottom 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3 DYNAMITE MAN AND POWDER MAN | $35.64 | $30.59 | $66.23 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3 SKILLED - MASON TENDERS; CAISSON WORKERS PLUS DEPTH; GUNNITE NOZZLE MEN; LEAD MAN ON SEWER WORK; WELDERS, CUTTERS, BURNERS & TORCHMEN | $40.54 | $32.42 | $72.96 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3 TORCHMAN, MORTARMAN | $51.40 | $36.94 | $88.34 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 4 DYNAMITE MAN | $41.54 | $32.42 | $73.96 Top 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 4 POWER TAMPER | $51.75 | $36.94 | $88.69 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 5 JACKHAMMER & AIR SPADE, CHAINSAW, SWINGING STAGE AND BOATSWAIN CHAIR, CEMENT GUN NOZZLEMAN, HOD CARRIER, PLASTER TENDER, TUNNEL MAN, A | $51.75 | $36.94 | $88.69 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 6 TILE LAYERS, BOTTOM MEN | $52.10 | $36.94 | $89.04 Top 10% +185% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 7 CAISSON LABORERS, DYNAMITERS | $52.10 | $36.94 | $89.04 Top 10% +185% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 8 ASBESTOS ABATEMENT LABORERS, TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS, DOSIMETER MONITORING NUCLEAR EXPOSURE | $51.80 | $36.94 | $88.74 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER5 | $42.54 | $32.42 | $74.96 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASBESTOS ABATEMENT WORKER | $35.92 | $29.26 | $65.18 Above median +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASBESTOS ABATEMENT WORKER | $33.49 | $29.26 | $62.75 Bottom 10% +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: DYNAMITE MEN; ASBESTOS ABATEMENT LABORER; AND HAZARDOUS WASTE WORKER (HENDERSON, HENRY, KNOX, WARREN, AND STARK COUNTIES) | $37.66 | $27.80 | $65.46 Top 10% +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GENERAL LABORER | $35.14 | $28.49 | $63.63 Top 10% +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GENERAL LABORER | $32.92 | $29.26 | $62.18 Above median +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GENERAL LABORER | $30.49 | $29.26 | $59.75 Bottom 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GENERAL LABORER (HENDERSON, HENRY, KNOX, WARREN, AND STARK COUNTIES) | $35.66 | $27.80 | $63.46 Top 10% +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GENERAL LABORER: CARPENTER TENDER, TOOL CRIBMAN, FIREMAN OR SALAMANDER TENDER, FLAGMAN, GRAVEL BOX MAN, BUMPMAN & SPOTTER, FORM HANDLER, MATE | $41.34 | $33.11 | $74.45 Above median +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 1 GENERAL LABORER | $32.81 | $31.92 | $64.73 Top 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 1 GENERAL LABORER | $34.14 | $30.59 | $64.73 Top 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 1 GENERAL LABORER (BOND AND MONTGOMERY COUNTIES) | $32.41 | $32.32 | $64.73 Top 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 1 GENERAL LABORER (BOND COUNTY) | $29.65 | $35.08 | $64.73 Top 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 1 GENERAL LABORER (CLINTON COUNTY) | $31.00 | $33.73 | $64.73 Top 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 1 GENERAL LABORER (CLINTON COUNTY) | $29.26 | $31.47 | $60.73 Bottom 10% +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 1 GENERAL LABORER, CARPENTER TENDER, TOOL CRIBMAN, SALAMANDER TENDER, FLAGMAN, FORM HANDLER, FLOOR SWEEPER, MATERIAL HANDLER, FENCING | $28.56 | $24.10 | $52.66 Top 10% +69% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER | $33.31 | $31.92 | $65.23 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER | $34.64 | $30.59 | $65.23 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND AND MONTGOMERY COUNTIES) | $32.91 | $32.32 | $65.23 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND COUNTY) | $30.15 | $35.08 | $65.23 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (CLINTON COUNTY) | $29.76 | $31.47 | $61.23 Above median +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER; (CLINTON COUNTY) | $31.50 | $33.73 | $65.23 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 2 DYNAMITE MAN, ASBESTOS ABATEMENT WORKER, HAZARDOUS WASTE ABATEMENT WORK, LEAD BASE PAINT ABATEMENT WORKER, AND UNLOADING EXPLOSIVES | $30.06 | $24.10 | $54.16 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 3 CONCRETE SPECIALIST | $30.71 | $24.10 | $54.81 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 3 DYNAMITE MAN | $35.64 | $30.59 | $66.23 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 3 DYNAMITE MAN (BOND AND MONTGOMERY COUNTIES) | $33.91 | $32.32 | $66.23 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 3 DYNAMITE MAN (BOND COUNTY) | $31.15 | $35.08 | $66.23 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN | $34.31 | $31.92 | $66.23 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN (CLINTON COUNTY) | $32.50 | $33.73 | $66.23 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 3DYNAMITE MAN (CLINTON COUNTY) | $30.76 | $31.47 | $62.23 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GENERAL LABORER | $32.90 | $29.26 | $62.16 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER | $56.30 | $38.44 | $94.74 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LIVINGSTON, PUTNAM, WHITESIDE COUNTIES) | $47.64 | $25.42 | $73.06 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LIVINGSTON, PUTNAM, WHITESIDE COUNTIES) | $46.54 | $25.42 | $71.96 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| LIVINGSTON, PUTNAM, WHITESIDE COUNTIES) | $45.29 | $25.42 | $70.71 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE & TILE SETTER AND TERRAZZO WORKER | $32.87 | $21.09 | $53.96 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE & TILE SETTER AND TERRAZZO WORKER | $38.52 | $21.86 | $60.38 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE & TILE SETTER AND TERRAZZO WORKER | $25.78 | $19.40 | $45.18 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE & TILE SETTER AND TERRAZZO WORKER | $32.20 | $18.51 | $50.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE FINISHER, TERRAZZO FINISHER AND TILE FINISHER | $29.75 | $20.23 | $49.98 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE SETTER, TERRAZZO WORKER & TILE SETTER | $31.74 | $17.87 | $49.61 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE, TERRAZZO AND TILE FINISHER | $30.70 | $18.51 | $49.21 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE, TERRAZZO AND TILE FINISHER | $30.24 | $17.87 | $48.11 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE, TILE & TERRAZZO FINISHER | $35.69 | $19.65 | $55.34 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $33.06 | $29.97 | $63.03 +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $33.06 | $29.36 | $62.42 +72% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $33.06 | $30.04 | $63.10 +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT: ZONE 1: CARROLL, HENDERSON, HENRY, MERCER, AND ROCK ISLAND COUNTIES | $39.31 | $29.84 | $69.15 Top 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT: ZONE 3: BOONE, JO DAVIESS, OGLE, STEPHENSON, AND WINNEBAGO COUNTIES | $51.81 | $32.69 | $84.50 Top 10% +133% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT: ZONE 5: BUREAU, DEKALB, LA SALLE, LEE, MARSHALL, PUTNAM, ROCK ISLAND, STARK, AND WHITESIDE COUNTIES | $51.09 | $33.61 | $84.70 Top 10% +133% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $488.00 PER WEEK; PENSION $664.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONA | $45.38 | $0.30 | $45.68 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $488.00 PER WEEK; PENSION $664.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONA | $45.18 | $0.30 | $45.48 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $488.00 PER WEEK; PENSION $664.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONA | $44.98 | $0.30 | $45.28 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| NEWTOWN READING, & SUNBURY), PUTNAM, WHITESIDE COUNTIES) | $45.88 | $25.42 | $71.30 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 1 CRANE; TOW OR PUSH BOAT (HENRY, MERCER, ROCK ISLAND, AND WHITESIDE COUNTIES) | $43.50 | $41.25 | $84.75 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 1 OVERHEAD CRANES; GRADALL; ALL ROUGH TERRAIN HYDRAULIC CRANES 91,000 LBS GROSS VEHICLE WEIGHT AND OVER REQUIRE AN OI | $47.79 | $43.42 | $91.21 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 2 ASPHALT HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; BACKFILL | $41.50 | $41.25 | $82.75 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 2 BOILER; BROOM, ALL POWER PROPELLED; BULLDOZERS; CONCRETE MIXER 2 BAG AND OVER; CONVEYOR, PORTABLE; FORKLIFT TRUCKS | $61.70 | $51.00 | $112.70 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 2 DINKEYS; POWER LAUNCHES; PH ONE-PASS SOIL-CEMENT MACHINE; PUGMILL WITH PUMP; BACKFILLERS; EUCLID LOADER; FORKLIFTS | $44.09 | $43.42 | $87.51 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 3 AIR COMPRESSOR; HERMAN NELSON HEATER, DRAVO, WARNER, SILENT GLO, AND SIMILAR TYPES; WATER PUMP; LIGHT PLANTS; GENER | $38.03 | $43.42 | $81.45 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER; CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE | $38.85 | $41.25 | $80.10 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR; COMPACT LOADER; ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER; SMALL OUTBOARD MOTOR BOAT; WATER | $37.80 | $41.25 | $79.05 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 4 BOBCAT/SKID STEER LOADER; BOOM TRUCKS; BRICK FORKLIFT; HOISTS, INSIDE ELEVATORS PUSH BUTTON WITH AUTOMATIC DOORS; O | $57.40 | $51.00 | $108.40 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $31.25 | $17.12 | $48.37 Above median +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $31.21 | $18.78 | $49.99 Above median +67% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM | $32.23 | $20.58 | $52.81 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER | $30.00 | $17.37 | $47.37 Above median +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, DRYWALL TAPER/FINISHER, SANDBLASTER, AND SPRAY | $53.05 | $27.63 | $80.68 Top 10% +169% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY, AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES | $40.00 | $26.90 | $66.90 Top 10% +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL | $45.15 | $29.41 | $74.56 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, SPRAY, PRESSURE ROLLER, SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK | $40.00 | $26.90 | $66.90 Top 10% +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY, STRUCTURAL STEEL, & SANDBLASTING | $30.50 | $17.37 | $47.87 Top 10% +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER | $35.30 | $29.94 | $65.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER | $34.58 | $29.10 | $63.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER | $34.57 | $29.10 | $63.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER | $33.83 | $27.45 | $61.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER | $32.39 | $25.99 | $58.38 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER | $35.14 | $28.60 | $63.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER | $34.36 | $28.60 | $62.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER | $35.10 | $28.60 | $63.70 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER (BUREAU, LA SALLE, LIVINGSTON, MARSHALL, AND PUTNAM COUNTIES) | $55.00 | $38.62 | $93.62 Top 10% +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER (FULTON, HANCOCK, MCDONOUGH, MARSHALL, MASON, SCHUYLER, STARK, AND WOODFORD COUNTIES) | $41.10 | $27.59 | $68.69 Top 10% +49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $37.90 | $37.66 | $75.56 Top 10% +89% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER (ADAMS, BROWN, CASS, FULTON, HANCOCK, MCDONOUGH, MENARD, PIKE, AND SCHUYLER COUNTIES) | $35.41 | $27.31 | $62.72 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, AND MONTGOMERY COUNTIES) | $37.30 | $24.75 | $62.05 Top 10% +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, AND WHITESIDE COUNTIES) | $38.98 | $36.58 | $75.56 Top 10% +89% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER (FULTON AND MERCER COUNTIES) | $29.14 | $20.42 | $49.56 Top 10% +24% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER (FULTON, MARSHALL, MASON, AND WOODFORD COUNTIES) | $29.41 | $26.01 | $55.42 Top 10% +39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER (HENDERSON COUNTY) | $28.51 | $21.93 | $50.44 Top 10% +26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER (HENDERSON, MERCER, AND ROCK ISLAND COUNTIES) | $34.00 | $21.76 | $55.76 Top 10% +40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER (HENRY, LIVINGSTON, AND STARK COUNTIES) | $36.70 | $22.08 | $58.78 Top 10% +47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER (LIVINGSTON, MCLEAN, AND WOODFORD COUNTIES) | $30.00 | $27.01 | $57.01 Top 10% +43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER (BUREAU, LA SALLE, LIVINGSTON, MARSHALL, AND PUTNAM COUNTIES) | $60.50 | $39.02 | $99.52 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER (CLINTON, RANDOLPH, AND MONROE COUNTIES) | $43.75 | $21.25 | $65.00 Top 10% +41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER (FULTON, HANCOCK, MCDONOUGH, MARSHALL, MASON, SCHUYLER, STARK, AND WOODFORD COUNTIES) | $42.70 | $30.98 | $73.68 Top 10% +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER AND STEAMFITTER (CASS, LOGAN, MACOUPIN, MASON, MENARD, MONTGOMERY, MORGAN, PIKE, & SCOTT) | $43.89 | $25.71 | $69.60 Top 10% +50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER AND STEAMFITTER (CLINTON AND WASHINGTON COUNTIES) | $45.00 | $21.54 | $66.54 Top 10% +44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PIPEFITTER, STEAMFITTER (LIVINGSTON, MCLEAN, AND WOODFORD COUNTIES) | $50.85 | $27.75 | $78.60 Top 10% +70% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER | $45.76 | $26.92 | $72.68 Above median +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER (ADAMS, BROWN, HANCOCK, CARROLL, HENDERSON, HENRY, KNOX, LEE, MERCER, ROCK ISLAND, SCHUYLER, WARREN, AND WHITESIDE COUNTIES) | $46.50 | $27.80 | $74.30 Top 10% +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER (BOND, CALHOUN, GREENE, JERSEY, MACOUPIN, AND MONTGOMERY COUNTIES) FOOTNOTE: A. 4 HOURS PAID HOLIDAY FOR CHRISTMAS EVE IF HOLIDAY F | $51.61 | $21.45 | $73.06 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER (BOONE, CARROLL, JO DAVIESS, OGLE, STEPHENSON, AND WINNEBAGO COUNTIES) | $55.54 | $31.43 | $86.97 Top 10% +88% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER (CLINTON, MCDONOUGH, MONROE, RANDOLPH, AND WASHINGTON COUNTIES) | $47.75 | $23.42 | $71.17 Top 10% +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER (RANDOLPH COUNTY) | $52.80 | $23.95 | $76.75 Top 10% +66% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1 ASPHALT PLANT ENGINEER; ASPHALT SCREED MAN; APSCO CONCRETE SPREADER; ASPHALT PAVER; ASPHALT ROLLER ON BITUMINOUS CONT | $40.71 | $28.75 | $69.46 Above median +49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC | $50.70 | $39.10 | $89.80 Top 10% +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT | $51.70 | $39.10 | $90.80 Top 10% +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 4 LATTICE BOOM CRAWLER CRANE, LATTICE BOOM TRUCK CRANE, TELESCOPIC TRUCK MOUNTED CRANE, TOWER CRANE. PREMIUM PAY - CRAN | $42.32 | $28.75 | $71.07 Bottom 10% +52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT | $48.70 | $39.10 | $87.80 Top 10% +88% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS | $47.57 | $39.10 | $86.67 Top 10% +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON O | $43.09 | $39.10 | $82.19 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 05 OILERS | $43.15 | $39.10 | $82.25 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT | $51.45 | $39.10 | $90.55 Top 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 07 Operators on equipment with Booms, including Jibs, 150 ft and over, but less than 200 ft | $49.50 | $36.90 | $86.40 Top 10% +85% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 08 Operators on equipment with Boomns, including Jibs, 200 ft and over; Tower Cranes, and Whirley Cranes | $49.80 | $36.90 | $86.70 Top 10% +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 09 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 150 FT AND OVER, BUT LESS THAN 200 FT | $49.70 | $39.10 | $88.80 Top 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 10 Certified crane Operators 17.5 tons and above, when requested by the Contractor or required by the Owner | $45.25 | $34.95 | $80.20 Top 10% +72% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $38.50 | $27.23 | $65.73 Above median +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER (ADAMS, BROWN, CASS, HANCOCK, LOGAN, MACOUPIN, MASON, MENARD, MONTGOMERY, MORGAN, PIKE, SCHUYLER AND SCOTT COUNTIES) | $36.00 | $26.36 | $62.36 Top 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, PIKE, RANDOLPH, AND WASHINGTON COUNTIES) | $40.00 | $22.05 | $62.05 Top 10% +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER (CARROLL, JO DAVIESS, LEE, LIVINGSTON, OGLE, STEPHENSON, WHITESIDE, AND WINNEBAGO COUNTIES) | $50.25 | $30.43 | $80.68 Top 10% +151% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER (FULTON, LIVINGSTON, MARSHALL, MCDONOUGH, MCLEAN, STARK, AND WOODFORD COUNTIES) | $38.05 | $24.60 | $62.65 Top 10% +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER (HENDERSON, HENRY, KNOX, MCDONOUGH, MERCER, ROCK ISLAND, WARREN, AND WHITESIDE COUNTIES) | $38.23 | $23.88 | $62.11 Top 10% +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROUTE 78), STEPHENSON, AND WINNEBAGO COUNTIES) | $48.47 | $26.70 | $75.17 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $50.36 | $26.88 | $77.24 Above median +72% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $39.50 | $33.06 | $72.56 Above median +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $40.26 | $24.51 | $64.77 Above median +44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $38.82 | $24.70 | $63.52 Above median +41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $38.54 | $30.37 | $68.91 Above median +53% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $56.35 | $38.65 | $95.00 Top 10% +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $46.57 | $24.48 | $71.05 Above median +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER (BOONE, CARROLL, DEKALB, JO DAVIESS LEE, OGLE, STEPHENSON, WHITESIDE, AND WINNEBAGO COUNTIES) | $52.14 | $37.43 | $89.57 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER (ZONE A: HENRY, KNOX, MCDONOUGH, MERCER, ROCK ISLAND, WARREN & WHITESIDE COUNTIES) | $44.70 | $26.18 | $70.88 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUTHWEST CORNER OF LIVINGSTON COUNTY), AND WOODFORD ( | $45.37 | $0.25 | $45.62 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUTHWEST CORNER OF LIVINGSTON COUNTY), AND WOODFORD ( | $45.17 | $0.25 | $45.42 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUTHWEST CORNER OF LIVINGSTON COUNTY), AND WOODFORD ( | $44.97 | $0.25 | $45.22 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| STEAMFITTER (CLINTON, RANDOLPH AND MONROE COUNTIES) | $49.00 | $24.42 | $73.42 Top 10% +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| STEWARD), AND OGLE COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $488.00 PER WEEK; PENSION $664.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 | $44.83 | $0.30 | $45.13 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $35.25 | $18.00 | $53.25 Above median +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE LAYER | $38.07 | $20.21 | $58.28 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK | $47.71 | $25.72 | $73.43 Top 10% +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 1: DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE U | $45.29 | $25.42 | $70.71 +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 1: DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE U | $45.35 | $25.72 | $71.07 Top 10% +147% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 1: DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE U | $43.24 | $24.27 | $67.51 Bottom 10% +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks; Vactor Trucks or s | $45.88 | $25.42 | $71.30 +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks; Vactor Trucks or s | $45.93 | $25.72 | $71.65 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks; Vactor Trucks or s | $43.83 | $24.27 | $68.10 Bottom 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; me | $46.15 | $25.42 | $71.57 +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; me | $46.25 | $25.72 | $71.97 Top 10% +150% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; me | $44.10 | $24.27 | $68.37 Bottom 10% +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS | $46.60 | $25.72 | $72.32 Top 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS. (ADAMS, BROWN, CASS, CLINTON, GREENE LOGAN, MENARD, MORGAN, PIKE, SCHYLER, SCOTT COUNTIES | $46.60 | $25.72 | $72.32 Top 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS. (CALHOUN, GREENE, JERSEY, MACOUPIN, MONTOGOMERY COUNTIES) | $46.60 | $25.72 | $72.32 Top 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS. (FULTON, HANCOCK, HENDERSON, KNOWX, MARSHALL, MASON, MCDONOUGH, STARK, WARREN, AND WOODFORD COUNT | $44.49 | $24.27 | $68.76 Top 10% +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS. (MCLEAN COUNTY) | $46.54 | $25.42 | $71.96 Top 10% +150% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (ADAMS, BROWN, CASS, CLINTON, GREENE LO | $47.71 | $25.72 | $73.43 Top 10% +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (CALHOUN, GREENE, JERSEY, MACOUPIN, MON | $47.71 | $25.72 | $73.43 Top 10% +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (FULTON, HANCOCK, HENDERSON, KNOWX, MAR | $45.59 | $24.27 | $69.86 Top 10% +143% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (MCLEAN COUNTY) | $47.64 | $25.42 | $73.06 Top 10% +154% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK...$ 47.71 25.72 TRUCK DRIVER, GROUP 4: L | $46.60 | $25.72 | $72.32 Top 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 2 OR 3 AXLE TRUCKS (LIVINGSTON, MCLEAN, AND WOODF | $44.82 | $0.25 | $45.07 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| UNDER; CONCRETE PLACER*; CONCRETE PUMP TRUCK MOUNTED; CONCRETE TOWER; CRANES; CRANES, HAMMERHEAD*; CRETER CRANE; CRUSHER, STONE, ETC; DERRICKS; DERRIC | $63.00 | $51.00 | $114.00 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| UNDERGROUND WORK - 1.00 PER HOUR; UNDER AIR PRESSURE - 1.00 PER HOUR; HAZARDOUS WASTE OR ASBESTOS REMOVAL PROJECTS - 1.00 PER HOUR FOR LEVEL C WORK; 1 | $38.18 | $28.75 | $66.93 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR UNDER 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL D | $65.17 | $38.44 | $103.61 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB.CAPACITY; WINCH TRUCK | $45.93 | $25.72 | $71.65 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Randolph, IL — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Randolph
Compliance Notes
- This wage determination applies to federal contracts for building construction in Randolph, Illinois.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.