Building Construction — Peoria, Illinois

WD IL20260003-16739-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BASE MACHINE MEN: BASE MACHINE OPERATOR in Peoria, Illinois (construction type: building) is $34.16/hr base + $24.46/hr fringe = $58.62/hr total package (WD IL20260003-16739-bld, Rev. 1).

Scroll down for all 33 trade classifications covered by this determination.

WD Number: IL20260003-16739-bld
Revision: 1
Construction Type: building
State: Illinois (IL)
County: Peoria
Effective: May 17, 2026
Trades covered: 33
Official source: SAM.gov reference IL20260003View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BASE MACHINE MEN: BASE MACHINE OPERATOR $34.16 $24.46 $58.62 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $45.23 $32.76 $77.99 +70% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $36.83 $24.47 $61.30 Above median +48% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, BUILDING: JOURNEYMAN $33.58 $29.10 $62.68 +71% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, BUILDING: PILEDRIVERMAN $34.58 $29.10 $63.68 +73% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: RESIDENTIAL $30.22 $29.10 $59.32 +62% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $31.48 $30.33 $61.81 Above median +66% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $39.50 $24.24 $63.74 Above median +38% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $26.58 $18.50 $45.08 -3% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $39.74 $27.78 $67.52 Above median +134% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $39.24 $33.88 $73.12 Above median +51% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 GENERAL LABORER - AIR TAMPER; BRICKLAYER TENDER; HAZARDOUS WASTE WORKER; CARPENTER TENDER; CEMENT MASON AND SACK SHAKERS; CEMENT MASON $34.00 $33.28 $67.28 +116% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 SKILLED LABORER - CONCRETE SPECIALIST; CUTTING AND ACETYLENE TORCH; GUNNITE NOZZLEMEN; GUNNITE PUMP MEN AND POTS; KETTLEMEN AND CARRIE $34.40 $33.28 $67.68 +117% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3ASBESTOS ABATEMENT WORKER; LEAD BASE PAINT ABATEMENT WORKER; HAZARDOUS WASTE WORKER (PEORIA AND TAZEWELL COUNTIES) $36.00 $33.28 $69.28 +122% vs market $0.00 $0.00 $0.00 $0.00
LABORER: BUILDING (TAZEWELL COUNTY) $34.00 $30.04 $64.04 +105% vs market $0.00 $0.00 $0.00 $0.00
MARBLE & TILE SETTER AND TERRAZZO WORKER $37.60 $24.48 $62.08 Top 10% $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $33.06 $29.97 $63.03 +74% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 1 OVERHEAD CRANES; GRADALL; ALL ROUGH TERRAIN HYDRAULIC CRANES 91,000 LBS GROSS VEHICLE WEIGHT AND OVER REQUIRE AN OI $47.79 $43.42 $91.21 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 2 DINKEYS; POWER LAUNCHES; PH ONE-PASS SOIL-CEMENT MACHINE; PUGMILL WITH PUMP; BACKFILLERS; EUCLID LOADER; FORKLIFTS $44.09 $43.42 $87.51 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 3 AIR COMPRESSOR; HERMAN NELSON HEATER, DRAVO, WARNER, SILENT GLO, AND SIMILAR TYPES; WATER PUMP; LIGHT PLANTS; GENER $38.03 $43.42 $81.45 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, SPRAY, PRESSURE ROLLER, SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK $40.00 $26.90 $66.90 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $41.10 $27.59 $68.69 Above median +49% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $31.00 $30.07 $61.07 Above median +53% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $42.70 $30.98 $73.68 Above median +59% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $38.05 $24.60 $62.65 Above median +95% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $28.18 $33.06 $61.24 Above median +36% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $39.50 $33.06 $72.56 Above median +61% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE U $43.24 $24.27 $67.51 +135% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3- 2, 3 OR 4 AXLES HAULING 16 TONS OR MORE; 5-AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTICULATED DUMP TRUCKS; ME $44.10 $24.27 $68.37 +138% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: LOW BOY AND OIL DISTRIBUTORS $44.49 $24.27 $68.76 +139% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK $45.59 $24.27 $69.86 +143% vs market $0.00 $0.00 $0.00 $0.00
VACATION PAY CREDIT FORE EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE; AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE B) PAID HOLIDAYS: NEW YEAR'S DAY; MEMO $57.99 $38.44 $96.43 Above median $0.00 $0.00 $0.00 $0.00
WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB.CAPACITY; WINCH TRUCK $43.83 $24.27 $68.10 Bottom 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Peoria, IL — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Peoria

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IL20260003-16739-bld →