Building Construction — Ogle, Illinois

WD IL20260001-17086-bld · Revision 5 · Effective May 20, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for (BUREAU, LA SALLE, LIVINGSTON, AND PUTNAM COUNTIES) in Ogle, Illinois (construction type: building) is $59.15/hr base + $51.00/hr fringe = $110.15/hr total package (WD IL20260001-17086-bld, Rev. 5).

Scroll down for all 295 trade classifications covered by this determination.

WD Number: IL20260001-17086-bld
Revision: 5
Construction Type: building
State: Illinois (IL)
County: Ogle
Effective: May 20, 2026
Trades covered: 295
Official source: SAM.gov reference IL20260001View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
(BUREAU, LA SALLE, LIVINGSTON, AND PUTNAM COUNTIES) $59.15 $51.00 $110.15 Top 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS ABATEMENT WORKER $35.25 $28.34 $63.59 Above median $0.00 $0.00 $0.00 $0.00
ASBESTOS ABATEMENT WORKER $33.38 $25.06 $58.44 Bottom 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS ABATEMENT WORKER $33.95 $27.28 $61.23 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANIC $55.02 $35.75 $90.77 Top 10% +279% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANIC $45.91 $33.45 $79.36 Bottom 10% +231% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI $45.88 $38.15 $84.03 +251% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI $36.06 $24.35 $60.41 Bottom 10% +152% vs market $0.00 $0.00 $0.00 $0.00
BASE MACHINE MEN $31.13 $21.09 $52.22 Top 10% $0.00 $0.00 $0.00 $0.00
BASE MACHINE MEN $33.90 $15.99 $49.89 Bottom 10% $0.00 $0.00 $0.00 $0.00
BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN $51.60 $51.05 $102.65 Bottom 10% $0.00 $0.00 $0.00 $0.00
BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN $53.60 $51.05 $104.65 Above median $0.00 $0.00 $0.00 $0.00
BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN $56.05 $51.05 $107.10 Above median $0.00 $0.00 $0.00 $0.00
BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN $56.75 $51.05 $107.80 Top 10% $0.00 $0.00 $0.00 $0.00
BLACK TOP PLANT OILER $43.15 $39.10 $82.25 Top 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $45.23 $32.76 $77.99 +70% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $45.50 $35.30 $80.80 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $40.20 $23.59 $63.79 Above median +54% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $35.01 $23.14 $58.15 Above median +40% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER (ADAMS, BROWN, CASS, GREENE, HANCOCK, MACOUPIN, MORGAN, MCDONOUGH, PIKE, SCHUYLER, AND SCOTT COUNTIES) $30.79 $21.69 $52.48 Top 10% +26% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON $29.51 $20.35 $49.86 Bottom 10% +20% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON $30.59 $23.19 $53.78 Above median +30% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON $40.00 $24.72 $64.72 Above median +56% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON $43.80 $27.23 $71.03 Top 10% +71% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON $30.79 $21.69 $52.48 +26% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON $33.49 $24.93 $58.42 Above median +41% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: BRICKLAYER, MARBLE, TERRAZZO WORKER, AND TILE LAYER (BOND, CALHOUN, CLINTON, JERSEY, MACOUPIN, MONROE, MONTGOMERY, AND WASHINGTON COUNTIES $33.13 $22.05 $55.18 Top 10% +33% vs market $0.00 $0.00 $0.00 $0.00
CABLE SPLICER (CARROLL, HENRY, JO DAVIESS, MERCER, WHITESIDE, AND ROCK ISLAND COUNTIES) $47.00 $28.64 $75.64 Top 10% $0.00 $0.00 $0.00 $0.00
CARPENTER $39.00 $37.45 $76.45 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, LATHER, PILEDRIVER, AND MILLWRIGHT DIVERS $38.62 $18.90 $57.52 Top 10% +57% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, LATHER, SOFT FLOOR LAYER (BOONE, OGLE, AND WINNEBAGO COUNTIES) $47.25 $37.87 $85.12 Top 10% +132% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER/LATHER $34.30 $29.94 $64.24 Top 10% +75% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER/LATHER $33.58 $29.10 $62.68 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER/LATHER $33.57 $29.10 $62.67 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER/LATHER $32.83 $27.45 $60.28 +64% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER/LATHER $31.39 $25.99 $57.38 Bottom 10% +56% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER/LATHER $34.14 $28.60 $62.74 Top 10% +71% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER/LATHER $34.10 $28.60 $62.70 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER/LATHER $33.36 $28.60 $61.96 Above median +69% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER/LATHER: (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, AND WHITESIDE) $42.14 $37.12 $79.26 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER/LATHER: DEKALB, LEE, OGLE $50.41 $38.53 $88.94 Top 10% +142% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: CARPENTERS, LATHERS, CARPET, LINOLEUM, AND SOFT TILE LAYERS $34.25 $29.53 $63.78 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: LATHER, PILEDRIVER AND MILLWRIGHT (CLINTON, MONROE RANDOLPH, AND WASHINGTON COUNTIES) $41.36 $18.90 $60.26 Top 10% +64% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: LATHER, PILEDRIVER, AND MILLWRIGHT $41.36 $18.90 $60.26 Top 10% +64% vs market $0.00 $0.00 $0.00 $0.00
CARPET INSTALLER: CARPET, LINOLEUM, HARDWOOD AND TILE LAYER (CLINTON, MONROE RANDOLPH, AND WASHINGTON COUNTIES) $36.08 $18.90 $54.98 Top 10% +165% vs market $0.00 $0.00 $0.00 $0.00
CARPET INSTALLER: CARPET, LINOLEUM, HARDWOOD, AND TILE LAYER $36.08 $18.90 $54.98 Top 10% +165% vs market $0.00 $0.00 $0.00 $0.00
CATV INSTALLER (BUREAU, HENRY, LA SALLE, PUTNAM, & STARK COUNTIES) $37.50 $32.78 $70.28 Top 10% $0.00 $0.00 $0.00 $0.00
CEMENT MASON (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, AND MONTGOMERY COUNTIES) $39.00 $30.60 $69.60 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON AND PLASTERER (BUREAU, LA SALLE, MARSHALL, PUTNAM, AND WOODFORD COUNTIES) $40.50 $33.54 $74.04 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $50.70 $40.60 $91.30 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $41.03 $36.39 $77.42 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER (ADAMS, BROWN, CASS, FULTON, HANCOCK, MCDONOUGH, MENARD, PIKE, AND SCHUYLER COUNTIES) $31.80 $26.89 $58.69 Top 10% +58% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER (FULTON, KNOX, MERCER, AND WARREN COUNTIES) $29.14 $20.42 $49.56 Above median +33% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER (FULTON, MARSHALL, MASON, AND WOODFORD COUNTIES) $30.52 $25.22 $55.74 Top 10% +50% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER (HENDERSON, MERCER, ROCK ISLAND, AND WHITESIDE COUNTIES) $28.16 $23.48 $51.64 Top 10% +39% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER (HENRY, LIVINGSTON, AND STARK COUNTIES) $36.70 $22.08 $58.78 Top 10% +58% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER (LIVINGSTON, MCLEAN, AND WOODFORD COUNTIES) $32.12 $22.29 $54.41 Above median +46% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASONS & PLASTERERS $30.83 $18.06 $48.89 Top 10% +31% vs market $0.00 $0.00 $0.00 $0.00
EACH FOOT ABOVE 200 MULTIPLE UNIT MACHINE - 1.00 PER HOUR; UNDERGROUND WORK - 1.00 PER HOUR; UNDER AIR PRESSURE - 1.00 PER HOUR; HAZARDOUS WASTE OR AS $34.30 $28.75 $63.05 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICAL LOW VOLTAGE WIRING INSTALLER, BUILDING (ALEXANDER, BOND, CLAY, CLINTON, EDWARDS, EFFINGHAM, FAYETTE, FRANKLIN, GALLATIN, HAMILTON, HARDIN $38.44 $19.37 $57.81 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICAL LOW VOLTAGE WIRING INSTALLER, BUILDING (CHAMPAIGN, DEWITT, DOUGLAS, FORD, IROQUIOS, LASALLE, LIVINGSTON, MARSHALL, PIATT, PUTNAM, AND WOODF $36.25 $21.65 $57.90 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICAL LOW VOLTAGE WIRING INSTALLER: BUILDING Installation, service and maintenance of low-voltage systems which utilizes the transmission and/or $37.70 $23.40 $61.10 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICAL LOW VOLTAGE WIRING INSTALLER: BUILDING Installation, service and maintenance of low-voltage systems which utilizes the transmission and/or $39.66 $21.44 $61.10 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICAL LOW VOLTAGE WIRING INSTALLER: BUILDING Installation, service and maintenance of low-voltage systems which utilizes the transmission and/or $40.63 $20.47 $61.10 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICAL LOW VOLTAGE WIRING INSTALLER: BUILDING Installation, service and maintenance of low-voltage systems which utilizes the transmission and/or $35.27 $15.65 $50.92 Bottom 10% $0.00 $0.00 $0.00 $0.00
ELECTRICAL LOW VOLTAGE WIRING INSTALLER: BUILDING Installation, service and maintenance of low-voltage systems which utilizes the transmission and/or $40.64 $20.46 $61.10 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICAL LOW VOLTAGE WIRING INSTALLER: BUILDING Installation, service and maintenance of low-voltage systems which utilizes the transmission and/or $36.91 $20.99 $57.90 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (BOND, CLINTON, MACOUPIN, MONROE, MONTGOMERY, RANDOLPH, AND WASHINGTON COUNTIES) $52.41 $30.27 $82.68 Top 10% +78% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (BUREAU, HENRY, LA SALLE, PUTNAM AND STARK COUNTIES) $50.45 $44.96 $95.41 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (CALHOUN, GREEN, JERSEY, AND MACOUPIN COUNTIES) $54.53 $29.46 $83.99 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (CARROLL, HENRY, JO DAVIESS, MERCER, WHITESIDE, AND ROCK ISLAND COUNTIES) $46.00 $28.56 $74.56 Top 10% +61% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (CASS, LOGAN, MACOUPIN, MASON, MENARD, MONTGOMERY, MORGAN, AND SCOTT COUNTIES) $39.80 $23.08 $62.88 Top 10% +36% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (DE KALB COUNTY) $60.17 $43.50 $103.67 Top 10% +124% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (GALESBURG DIVISION - FULTON, HENDERSON, KNOX, MCDONOUGH, MERCER, AND WARREN COUNTIES) $45.65 $26.77 $72.42 Top 10% +56% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (JO DAVIESS COUNTY) $42.45 $20.55 $63.00 Top 10% +36% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (LA SALLE, LIVINGSTON, MCLEAN, MARSHALL, PUTNAM, AND WOODFORD COUNTIES) $49.63 $22.51 $72.14 Top 10% +56% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (MC LEAN AND WOODFORD COUNTIES) $43.86 $23.72 $67.58 Top 10% +46% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (PEORIA DIVISION - FULTON; MASON; AND STARK COUNTIES) $39.50 $24.24 $63.74 Top 10% +38% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (PEORIA DIVISION - MARSHALL AND WOODFORD COUNTIES) $45.65 $26.77 $72.42 Top 10% +56% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (QUINCY DIVISION - ADAMS, BROWN, HANCOCK, MCDONOUGH, PIKE, AND SCHUYLER COUNTIES) $35.00 $20.67 $55.67 Top 10% +20% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, ELECTRICAL TECHNICIAN (DE KALB COUNTY) Work includes the installation, maintenance and removal of telecommunication facilities, telephone $49.70 $38.45 $88.15 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTES: A) EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF $62.73 $38.44 $101.17 Top 10% +62% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTES: A. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SE $57.99 $38.44 $96.43 Top 10% +54% vs market $0.00 $0.00 $0.00 $0.00
FIRE STOP TECHNICIAN $44.02 $32.76 $76.78 Top 10% $0.00 $0.00 $0.00 $0.00
FIRE STOP TECHNICIAN $36.73 $31.21 $67.94 $0.00 $0.00 $0.00 $0.00
GLAZIER $39.74 $27.78 $67.52 Above median +134% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $33.37 $21.80 $55.17 +91% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $35.37 $21.80 $57.17 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $48.28 $28.50 $76.78 Above median +166% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER (ADAMS, BROWN, CASS, LOGAN, MACOUPIN, MASON, MENARD, MONTGOMERY, MORGAN, PIKE, SCHUYLER, AND SCOTT COUNTIES) $39.77 $22.73 $62.50 Top 10% +117% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER (BOND, CALHOUN, CLINTON, GREENE, JACKSON, JERSEY, MACOUPIN, MADISON, MARION, MONROE, PERRY, RANDOLPH, ST. CLAIR, AND WASHINGTON COUNTIES) $43.32 $25.43 $68.75 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, W $41.27 $32.76 $74.03 $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, W $34.43 $31.21 $65.64 Bottom 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER (ADAMS, BROWN, CASS, FULTON, GREENE, LOGAN, MACOUPIN, MASON, MENARD, MONTGOMERY MORGAN, PIKE, SCHUYLER, AND SCOTT COUNTIES) $36.20 $31.35 $67.55 Top 10% +39% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (ADAMS, HANCOCK, HENDERSON, KNOX, MC DONOUGH, MERCER, SCHUYLER, AND WARREN COUNTIES) $36.30 $25.80 $62.10 Top 10% +28% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, MONTGOMERY, RANDOLPH, AND WASHINGTON COUNTIES) $41.65 $31.18 $72.83 Top 10% +50% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (BOONE, CARROLL, DEKALB, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE, AND WINNEBAGO COUNTIES) $41.37 $44.41 $85.78 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (CARROLL, HENRY, JO DAVIESS, KNOX, MERCER, ROCK ISLAND, WARREN, AND WHITESIDE COUNTIES) $38.25 $32.28 $70.53 Top 10% +45% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (DEKALB COUNTY) $48.83 $39.84 $88.67 Top 10% +83% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (FULTON, KNOX, LIVINGSTON, MCLEAN, MARSHALL, MASON, STARK, AND WOODFORD COUNTIES) $39.24 $33.88 $73.12 Top 10% +51% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (LA SALLE, MARSHALL, AND PUTNMAN COUNTIES) $45.50 $38.90 $84.40 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (MCLEAN COUNTY) $37.71 $29.65 $67.36 Top 10% +39% vs market $0.00 $0.00 $0.00 $0.00
LABORER $33.00 $28.34 $61.34 Above median +97% vs market $0.00 $0.00 $0.00 $0.00
LABORER $31.13 $25.06 $56.19 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
LABORER $31.70 $27.28 $58.98 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
LABORER $34.00 $30.04 $64.04 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
LABORER : CARPENTER TENDER; TOOL CRIBMEN; FIREMEN OR ALAMANDER TENDER; FLAGMAN; GRAVEL BOX MEN, DUMPMEN & SPOTTERS; FORM HANDLERS; MATERIAL HANDLERS $40.47 $34.05 $74.52 Top 10% +139% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 CARPENTER TENDERS; MASON TENDERS; PLASTERERS TENDERS; MORTAR MIXERS; KETTLEMEN AND CARRIER OF HOT STUFF; TOOL CRIB MEN; FIRMEN OR SALA $36.59 $27.04 $63.63 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 COMMON LABORER, BOBCAT, FORKLIFT $51.40 $36.94 $88.34 Top 10% +183% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 GENERAL LABORER $32.84 $27.89 $60.73 Bottom 10% +95% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 GENERAL LABORER $34.14 $30.59 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 GENERAL LABORER (CLINTON COUNTY) $35.38 $29.35 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 UNSKILLED - ALL CLASSIFICATIONS NOT LISTED BELOW $40.54 $32.42 $72.96 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER $33.34 $27.89 $61.23 Bottom 10% +96% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER $34.64 $30.59 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (CLINTON COUNTY) $35.88 $29.35 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 DYNAMITE MEN; ASBESTOS ABATEMENT LABORER; HAZARDOUS WASTE WORKER (LIVINGSTON, MARSHALL, STARK, AND WOODFORD COUNTIES) $38.59 $27.04 $65.63 Top 10% +110% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 POWER VIRBRATOR $51.75 $36.94 $88.69 Top 10% +184% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 SEMI-SKILLED - HANDLING OF MATERIALS TREATED WITH OIL, CREOSOTE, ASPHALT AND/OR FORIEGN MATERIAL HARMFUL TO SKIN OR CLOTHING; TRACK LA $40.54 $32.42 $72.96 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 DYNAMITE MAN (CLINTON COUNTY) $36.88 $29.35 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 DYNAMITE MAN AND POWDER MAN $34.34 $27.89 $62.23 Bottom 10% +99% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 DYNAMITE MAN AND POWDER MAN $35.64 $30.59 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 SKILLED - MASON TENDERS; CAISSON WORKERS PLUS DEPTH; GUNNITE NOZZLE MEN; LEAD MAN ON SEWER WORK; WELDERS, CUTTERS, BURNERS & TORCHMEN $40.54 $32.42 $72.96 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 TORCHMAN, MORTARMAN $51.40 $36.94 $88.34 Top 10% +183% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 4 DYNAMITE MAN $41.54 $32.42 $73.96 Top 10% +137% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 4 POWER TAMPER $51.75 $36.94 $88.69 Top 10% +184% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 5 JACKHAMMER & AIR SPADE, CHAINSAW, SWINGING STAGE AND BOATSWAIN CHAIR, CEMENT GUN NOZZLEMAN, HOD CARRIER, PLASTER TENDER, TUNNEL MAN, A $51.75 $36.94 $88.69 Top 10% +184% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 6 TILE LAYERS, BOTTOM MEN $52.10 $36.94 $89.04 Top 10% +185% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 7 CAISSON LABORERS, DYNAMITERS $52.10 $36.94 $89.04 Top 10% +185% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 8 ASBESTOS ABATEMENT LABORERS, TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS, DOSIMETER MONITORING NUCLEAR EXPOSURE $51.80 $36.94 $88.74 Top 10% +184% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER5 $42.54 $32.42 $74.96 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASBESTOS ABATEMENT WORKER $35.92 $29.26 $65.18 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASBESTOS ABATEMENT WORKER $33.49 $29.26 $62.75 Bottom 10% +101% vs market $0.00 $0.00 $0.00 $0.00
LABORER: DYNAMITE MEN; ASBESTOS ABATEMENT LABORER; AND HAZARDOUS WASTE WORKER (HENDERSON, HENRY, KNOX, WARREN, AND STARK COUNTIES) $37.66 $27.80 $65.46 Top 10% +110% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GENERAL LABORER $35.14 $28.49 $63.63 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GENERAL LABORER $32.92 $29.26 $62.18 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GENERAL LABORER $30.49 $29.26 $59.75 Bottom 10% +92% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GENERAL LABORER (HENDERSON, HENRY, KNOX, WARREN, AND STARK COUNTIES) $35.66 $27.80 $63.46 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GENERAL LABORER: CARPENTER TENDER, TOOL CRIBMAN, FIREMAN OR SALAMANDER TENDER, FLAGMAN, GRAVEL BOX MAN, BUMPMAN & SPOTTER, FORM HANDLER, MATE $41.34 $33.11 $74.45 Above median +139% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER $32.81 $31.92 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER $34.14 $30.59 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER (BOND AND MONTGOMERY COUNTIES) $32.41 $32.32 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER (BOND COUNTY) $29.65 $35.08 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER (CLINTON COUNTY) $31.00 $33.73 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER (CLINTON COUNTY) $29.26 $31.47 $60.73 Bottom 10% +95% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER, CARPENTER TENDER, TOOL CRIBMAN, SALAMANDER TENDER, FLAGMAN, FORM HANDLER, FLOOR SWEEPER, MATERIAL HANDLER, FENCING $28.56 $24.10 $52.66 Top 10% +69% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER $33.31 $31.92 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER $34.64 $30.59 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND AND MONTGOMERY COUNTIES) $32.91 $32.32 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND COUNTY) $30.15 $35.08 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (CLINTON COUNTY) $29.76 $31.47 $61.23 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER; (CLINTON COUNTY) $31.50 $33.73 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 DYNAMITE MAN, ASBESTOS ABATEMENT WORKER, HAZARDOUS WASTE ABATEMENT WORK, LEAD BASE PAINT ABATEMENT WORKER, AND UNLOADING EXPLOSIVES $30.06 $24.10 $54.16 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 CONCRETE SPECIALIST $30.71 $24.10 $54.81 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN $35.64 $30.59 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN (BOND AND MONTGOMERY COUNTIES) $33.91 $32.32 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN (BOND COUNTY) $31.15 $35.08 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN $34.31 $31.92 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN (CLINTON COUNTY) $32.50 $33.73 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3DYNAMITE MAN (CLINTON COUNTY) $30.76 $31.47 $62.23 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GENERAL LABORER $32.90 $29.26 $62.16 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER $56.30 $38.44 $94.74 Top 10% $0.00 $0.00 $0.00 $0.00
LIVINGSTON, PUTNAM, WHITESIDE COUNTIES) $47.64 $25.42 $73.06 Top 10% $0.00 $0.00 $0.00 $0.00
LIVINGSTON, PUTNAM, WHITESIDE COUNTIES) $46.54 $25.42 $71.96 Above median $0.00 $0.00 $0.00 $0.00
LIVINGSTON, PUTNAM, WHITESIDE COUNTIES) $45.29 $25.42 $70.71 Bottom 10% $0.00 $0.00 $0.00 $0.00
MARBLE & TILE SETTER AND TERRAZZO WORKER $32.87 $21.09 $53.96 Above median $0.00 $0.00 $0.00 $0.00
MARBLE & TILE SETTER AND TERRAZZO WORKER $38.52 $21.86 $60.38 Top 10% $0.00 $0.00 $0.00 $0.00
MARBLE & TILE SETTER AND TERRAZZO WORKER $25.78 $19.40 $45.18 Bottom 10% $0.00 $0.00 $0.00 $0.00
MARBLE & TILE SETTER AND TERRAZZO WORKER $32.20 $18.51 $50.71 $0.00 $0.00 $0.00 $0.00
MARBLE FINISHER, TERRAZZO FINISHER AND TILE FINISHER $29.75 $20.23 $49.98 Top 10% $0.00 $0.00 $0.00 $0.00
MARBLE SETTER, TERRAZZO WORKER & TILE SETTER $31.74 $17.87 $49.61 Bottom 10% $0.00 $0.00 $0.00 $0.00
MARBLE, TERRAZZO AND TILE FINISHER $30.70 $18.51 $49.21 Above median $0.00 $0.00 $0.00 $0.00
MARBLE, TERRAZZO AND TILE FINISHER $30.24 $17.87 $48.11 Bottom 10% $0.00 $0.00 $0.00 $0.00
MARBLE, TILE & TERRAZZO FINISHER $35.69 $19.65 $55.34 Above median $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $33.06 $30.04 $63.10 +74% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $33.06 $29.97 $63.03 +74% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $33.06 $29.36 $62.42 +72% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT: ZONE 1: CARROLL, HENDERSON, HENRY, MERCER, AND ROCK ISLAND COUNTIES $39.31 $29.84 $69.15 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT: ZONE 3: BOONE, JO DAVIESS, OGLE, STEPHENSON, AND WINNEBAGO COUNTIES $51.81 $32.69 $84.50 Top 10% +133% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT: ZONE 5: BUREAU, DEKALB, LA SALLE, LEE, MARSHALL, PUTNAM, ROCK ISLAND, STARK, AND WHITESIDE COUNTIES $51.09 $33.61 $84.70 Top 10% +133% vs market $0.00 $0.00 $0.00 $0.00
MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $488.00 PER WEEK; PENSION $664.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONA $45.38 $0.30 $45.68 Top 10% $0.00 $0.00 $0.00 $0.00
MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $488.00 PER WEEK; PENSION $664.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONA $45.18 $0.30 $45.48 Above median $0.00 $0.00 $0.00 $0.00
MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $488.00 PER WEEK; PENSION $664.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONA $44.98 $0.30 $45.28 Bottom 10% $0.00 $0.00 $0.00 $0.00
NEWTOWN READING, & SUNBURY), PUTNAM, WHITESIDE COUNTIES) $45.88 $25.42 $71.30 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, GROUP 1 CRANE; TOW OR PUSH BOAT (HENRY, MERCER, ROCK ISLAND, AND WHITESIDE COUNTIES) $43.50 $41.25 $84.75 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, GROUP 1 OVERHEAD CRANES; GRADALL; ALL ROUGH TERRAIN HYDRAULIC CRANES 91,000 LBS GROSS VEHICLE WEIGHT AND OVER REQUIRE AN OI $47.79 $43.42 $91.21 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, GROUP 2 ASPHALT HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; BACKFILL $41.50 $41.25 $82.75 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, GROUP 2 BOILER; BROOM, ALL POWER PROPELLED; BULLDOZERS; CONCRETE MIXER 2 BAG AND OVER; CONVEYOR, PORTABLE; FORKLIFT TRUCKS $61.70 $51.00 $112.70 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, GROUP 2 DINKEYS; POWER LAUNCHES; PH ONE-PASS SOIL-CEMENT MACHINE; PUGMILL WITH PUMP; BACKFILLERS; EUCLID LOADER; FORKLIFTS $44.09 $43.42 $87.51 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, GROUP 3 AIR COMPRESSOR; HERMAN NELSON HEATER, DRAVO, WARNER, SILENT GLO, AND SIMILAR TYPES; WATER PUMP; LIGHT PLANTS; GENER $38.03 $43.42 $81.45 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER; CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE $38.85 $41.25 $80.10 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR; COMPACT LOADER; ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER; SMALL OUTBOARD MOTOR BOAT; WATER $37.80 $41.25 $79.05 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, GROUP 4 BOBCAT/SKID STEER LOADER; BOOM TRUCKS; BRICK FORKLIFT; HOISTS, INSIDE ELEVATORS PUSH BUTTON WITH AUTOMATIC DOORS; O $57.40 $51.00 $108.40 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $31.25 $17.12 $48.37 Above median +61% vs market $0.00 $0.00 $0.00 $0.00
PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM $31.21 $18.78 $49.99 Above median +67% vs market $0.00 $0.00 $0.00 $0.00
PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM $32.23 $20.58 $52.81 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $30.00 $17.37 $47.37 Above median +58% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, DRYWALL TAPER/FINISHER, SANDBLASTER, AND SPRAY $53.05 $27.63 $80.68 Top 10% +169% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY, AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES $40.00 $26.90 $66.90 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL $45.15 $29.41 $74.56 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, SPRAY, PRESSURE ROLLER, SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK $40.00 $26.90 $66.90 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY, STRUCTURAL STEEL, & SANDBLASTING $30.50 $17.37 $47.87 Top 10% +60% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVER $35.30 $29.94 $65.24 $0.00 $0.00 $0.00 $0.00
PILEDRIVER $34.58 $29.10 $63.68 $0.00 $0.00 $0.00 $0.00
PILEDRIVER $34.57 $29.10 $63.67 $0.00 $0.00 $0.00 $0.00
PILEDRIVER $33.83 $27.45 $61.28 $0.00 $0.00 $0.00 $0.00
PILEDRIVER $32.39 $25.99 $58.38 Bottom 10% $0.00 $0.00 $0.00 $0.00
PILEDRIVER $35.14 $28.60 $63.74 $0.00 $0.00 $0.00 $0.00
PILEDRIVER $34.36 $28.60 $62.96 $0.00 $0.00 $0.00 $0.00
PILEDRIVER $35.10 $28.60 $63.70 $0.00 $0.00 $0.00 $0.00
PIPEFITTER (BUREAU, LA SALLE, LIVINGSTON, MARSHALL, AND PUTNAM COUNTIES) $55.00 $38.62 $93.62 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER (FULTON, HANCOCK, MCDONOUGH, MARSHALL, MASON, SCHUYLER, STARK, AND WOODFORD COUNTIES) $41.10 $27.59 $68.69 Top 10% +49% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $37.90 $37.66 $75.56 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER (ADAMS, BROWN, CASS, FULTON, HANCOCK, MCDONOUGH, MENARD, PIKE, AND SCHUYLER COUNTIES) $35.41 $27.31 $62.72 Top 10% +57% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, AND MONTGOMERY COUNTIES) $37.30 $24.75 $62.05 Top 10% +55% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, AND WHITESIDE COUNTIES) $38.98 $36.58 $75.56 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER (FULTON AND MERCER COUNTIES) $29.14 $20.42 $49.56 Top 10% +24% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER (FULTON, MARSHALL, MASON, AND WOODFORD COUNTIES) $29.41 $26.01 $55.42 Top 10% +39% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER (HENDERSON COUNTY) $28.51 $21.93 $50.44 Top 10% +26% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER (HENDERSON, MERCER, AND ROCK ISLAND COUNTIES) $34.00 $21.76 $55.76 Top 10% +40% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER (HENRY, LIVINGSTON, AND STARK COUNTIES) $36.70 $22.08 $58.78 Top 10% +47% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER (LIVINGSTON, MCLEAN, AND WOODFORD COUNTIES) $30.00 $27.01 $57.01 Top 10% +43% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER (BUREAU, LA SALLE, LIVINGSTON, MARSHALL, AND PUTNAM COUNTIES) $60.50 $39.02 $99.52 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER (CLINTON, RANDOLPH, AND MONROE COUNTIES) $43.75 $21.25 $65.00 Top 10% +41% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER (FULTON, HANCOCK, MCDONOUGH, MARSHALL, MASON, SCHUYLER, STARK, AND WOODFORD COUNTIES) $42.70 $30.98 $73.68 Top 10% +59% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER AND STEAMFITTER (CASS, LOGAN, MACOUPIN, MASON, MENARD, MONTGOMERY, MORGAN, PIKE, & SCOTT) $43.89 $25.71 $69.60 Top 10% +50% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER AND STEAMFITTER (CLINTON AND WASHINGTON COUNTIES) $45.00 $21.54 $66.54 Top 10% +44% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTER, STEAMFITTER (LIVINGSTON, MCLEAN, AND WOODFORD COUNTIES) $50.85 $27.75 $78.60 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $45.76 $26.92 $72.68 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER (ADAMS, BROWN, HANCOCK, CARROLL, HENDERSON, HENRY, KNOX, LEE, MERCER, ROCK ISLAND, SCHUYLER, WARREN, AND WHITESIDE COUNTIES) $46.50 $27.80 $74.30 Top 10% +61% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER (BOND, CALHOUN, GREENE, JERSEY, MACOUPIN, AND MONTGOMERY COUNTIES) FOOTNOTE: A. 4 HOURS PAID HOLIDAY FOR CHRISTMAS EVE IF HOLIDAY F $51.61 $21.45 $73.06 Top 10% +58% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER (BOONE, CARROLL, JO DAVIESS, OGLE, STEPHENSON, AND WINNEBAGO COUNTIES) $55.54 $31.43 $86.97 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER (CLINTON, MCDONOUGH, MONROE, RANDOLPH, AND WASHINGTON COUNTIES) $47.75 $23.42 $71.17 Top 10% +54% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER (RANDOLPH COUNTY) $52.80 $23.95 $76.75 Top 10% +66% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 ASPHALT PLANT ENGINEER; ASPHALT SCREED MAN; APSCO CONCRETE SPREADER; ASPHALT PAVER; ASPHALT ROLLER ON BITUMINOUS CONT $40.71 $28.75 $69.46 Above median +49% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC $50.70 $39.10 $89.80 Top 10% +93% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT $51.70 $39.10 $90.80 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 LATTICE BOOM CRAWLER CRANE, LATTICE BOOM TRUCK CRANE, TELESCOPIC TRUCK MOUNTED CRANE, TOWER CRANE. PREMIUM PAY - CRAN $42.32 $28.75 $71.07 Bottom 10% +52% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT $48.70 $39.10 $87.80 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS $47.57 $39.10 $86.67 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON O $43.09 $39.10 $82.19 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 05 OILERS $43.15 $39.10 $82.25 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT $51.45 $39.10 $90.55 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 07 Operators on equipment with Booms, including Jibs, 150 ft and over, but less than 200 ft $49.50 $36.90 $86.40 Top 10% +85% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 08 Operators on equipment with Boomns, including Jibs, 200 ft and over; Tower Cranes, and Whirley Cranes $49.80 $36.90 $86.70 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 09 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 150 FT AND OVER, BUT LESS THAN 200 FT $49.70 $39.10 $88.80 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 10 Certified crane Operators 17.5 tons and above, when requested by the Contractor or required by the Owner $45.25 $34.95 $80.20 Top 10% +72% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $38.50 $27.23 $65.73 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
ROOFER (ADAMS, BROWN, CASS, HANCOCK, LOGAN, MACOUPIN, MASON, MENARD, MONTGOMERY, MORGAN, PIKE, SCHUYLER AND SCOTT COUNTIES) $36.00 $26.36 $62.36 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
ROOFER (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, PIKE, RANDOLPH, AND WASHINGTON COUNTIES) $40.00 $22.05 $62.05 Top 10% +93% vs market $0.00 $0.00 $0.00 $0.00
ROOFER (CARROLL, JO DAVIESS, LEE, LIVINGSTON, OGLE, STEPHENSON, WHITESIDE, AND WINNEBAGO COUNTIES) $50.25 $30.43 $80.68 Top 10% +151% vs market $0.00 $0.00 $0.00 $0.00
ROOFER (FULTON, LIVINGSTON, MARSHALL, MCDONOUGH, MCLEAN, STARK, AND WOODFORD COUNTIES) $38.05 $24.60 $62.65 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
ROOFER (HENDERSON, HENRY, KNOX, MCDONOUGH, MERCER, ROCK ISLAND, WARREN, AND WHITESIDE COUNTIES) $38.23 $23.88 $62.11 Top 10% +93% vs market $0.00 $0.00 $0.00 $0.00
ROUTE 78), STEPHENSON, AND WINNEBAGO COUNTIES) $48.47 $26.70 $75.17 Top 10% $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $50.36 $26.88 $77.24 Above median +72% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $39.50 $33.06 $72.56 Above median +61% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $40.26 $24.51 $64.77 Above median +44% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $38.82 $24.70 $63.52 Above median +41% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $38.54 $30.37 $68.91 Above median +53% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $56.35 $38.65 $95.00 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $46.57 $24.48 $71.05 Above median +58% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER (BOONE, CARROLL, DEKALB, JO DAVIESS LEE, OGLE, STEPHENSON, WHITESIDE, AND WINNEBAGO COUNTIES) $52.14 $37.43 $89.57 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER (ZONE A: HENRY, KNOX, MCDONOUGH, MERCER, ROCK ISLAND, WARREN & WHITESIDE COUNTIES) $44.70 $26.18 $70.88 Top 10% +58% vs market $0.00 $0.00 $0.00 $0.00
SOUTHWEST CORNER OF LIVINGSTON COUNTY), AND WOODFORD ( $45.37 $0.25 $45.62 Top 10% $0.00 $0.00 $0.00 $0.00
SOUTHWEST CORNER OF LIVINGSTON COUNTY), AND WOODFORD ( $45.17 $0.25 $45.42 Above median $0.00 $0.00 $0.00 $0.00
SOUTHWEST CORNER OF LIVINGSTON COUNTY), AND WOODFORD ( $44.97 $0.25 $45.22 Bottom 10% $0.00 $0.00 $0.00 $0.00
STEAMFITTER (CLINTON, RANDOLPH AND MONROE COUNTIES) $49.00 $24.42 $73.42 Top 10% +59% vs market $0.00 $0.00 $0.00 $0.00
STEWARD), AND OGLE COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $488.00 PER WEEK; PENSION $664.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 $44.83 $0.30 $45.13 Top 10% $0.00 $0.00 $0.00 $0.00
TILE FINISHER $35.25 $18.00 $53.25 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
TILE LAYER $38.07 $20.21 $58.28 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK $47.71 $25.72 $73.43 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 1: DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE U $45.29 $25.42 $70.71 +146% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 1: DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE U $45.35 $25.72 $71.07 Top 10% +147% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 1: DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE U $43.24 $24.27 $67.51 Bottom 10% +135% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks; Vactor Trucks or s $45.88 $25.42 $71.30 +148% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks; Vactor Trucks or s $45.93 $25.72 $71.65 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks; Vactor Trucks or s $43.83 $24.27 $68.10 Bottom 10% +137% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; me $46.15 $25.42 $71.57 +149% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; me $46.25 $25.72 $71.97 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; me $44.10 $24.27 $68.37 Bottom 10% +138% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS $46.60 $25.72 $72.32 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS. (ADAMS, BROWN, CASS, CLINTON, GREENE LOGAN, MENARD, MORGAN, PIKE, SCHYLER, SCOTT COUNTIES $46.60 $25.72 $72.32 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS. (CALHOUN, GREENE, JERSEY, MACOUPIN, MONTOGOMERY COUNTIES) $46.60 $25.72 $72.32 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS. (FULTON, HANCOCK, HENDERSON, KNOWX, MARSHALL, MASON, MCDONOUGH, STARK, WARREN, AND WOODFORD COUNT $44.49 $24.27 $68.76 Top 10% +139% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS. (MCLEAN COUNTY) $46.54 $25.42 $71.96 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (ADAMS, BROWN, CASS, CLINTON, GREENE LO $47.71 $25.72 $73.43 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (CALHOUN, GREENE, JERSEY, MACOUPIN, MON $47.71 $25.72 $73.43 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (FULTON, HANCOCK, HENDERSON, KNOWX, MAR $45.59 $24.27 $69.86 Top 10% +143% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (MCLEAN COUNTY) $47.64 $25.42 $73.06 Top 10% +154% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK...$ 47.71 25.72 TRUCK DRIVER, GROUP 4: L $46.60 $25.72 $72.32 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 2 OR 3 AXLE TRUCKS (LIVINGSTON, MCLEAN, AND WOODF $44.82 $0.25 $45.07 Top 10% +57% vs market $0.00 $0.00 $0.00 $0.00
UNDER; CONCRETE PLACER*; CONCRETE PUMP TRUCK MOUNTED; CONCRETE TOWER; CRANES; CRANES, HAMMERHEAD*; CRETER CRANE; CRUSHER, STONE, ETC; DERRICKS; DERRIC $63.00 $51.00 $114.00 Top 10% $0.00 $0.00 $0.00 $0.00
UNDERGROUND WORK - 1.00 PER HOUR; UNDER AIR PRESSURE - 1.00 PER HOUR; HAZARDOUS WASTE OR ASBESTOS REMOVAL PROJECTS - 1.00 PER HOUR FOR LEVEL C WORK; 1 $38.18 $28.75 $66.93 Top 10% $0.00 $0.00 $0.00 $0.00
VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR UNDER 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL D $65.17 $38.44 $103.61 Top 10% $0.00 $0.00 $0.00 $0.00
WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB.CAPACITY; WINCH TRUCK $45.93 $25.72 $71.65 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Ogle, IL — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Ogle

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IL20260001-17086-bld →