Residential Construction — McLean, Illinois

WD IL20260041-16707-res · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in McLean, Illinois (construction type: residential) is $13.72/hr base + $0.00/hr fringe = $13.72/hr total package (WD IL20260041-16707-res, Rev. 2).

Scroll down for all 11 trade classifications covered by this determination.

WD Number: IL20260041-16707-res
Revision: 2
Construction Type: residential
State: Illinois (IL)
County: McLean
Effective: May 17, 2026
Trades covered: 11
Official source: SAM.gov reference IL20260041View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $13.72 $0.00 $13.72 -63% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $10.90 $0.00 $10.90 -71% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (MC LEAN COUNTY) $30.56 $16.37 $46.93 +1% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (MCLEAN COUNTY) $25.02 $15.23 $40.25 -13% vs market $0.00 $0.00 $0.00 $0.00
LABORER, UNSKILLED $8.41 $0.00 $8.41 Above median -73% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 1 OVERHEAD CRANES; GRADALL; ALL ROUGH TERRAIN HYDRAULIC CRANES 91,000 LBS GROSS VEHICLE WEIGHT AND OVER REQUIRE AN OI $47.79 $43.42 $91.21 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 2 DINKEYS; POWER LAUNCHES; PH ONE-PASS SOIL-CEMENT MACHINE; PUGMILL WITH PUMP; BACKFILLERS; EUCLID LOADER; FORKLIFTS $44.09 $43.42 $87.51 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 3 AIR COMPRESSOR; HERMAN NELSON HEATER, DRAVO, WARNER, SILENT GLO, AND SIMILAR TYPES; WATER PUMP; LIGHT PLANTS; GENER $38.03 $43.42 $81.45 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY, AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES $40.00 $26.90 $66.90 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC $50.85 $27.75 $78.60 +70% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $28.18 $33.06 $61.24 Above median +36% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the McLean, IL — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in McLean

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IL20260041-16707-res →