Residential Construction — Madison, Illinois

WD IL20260007-15750-res · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Madison, Illinois (construction type: residential) is $43.48/hr base + $27.24/hr fringe = $70.72/hr total package (WD IL20260007-15750-res, Rev. 2).

Scroll down for all 66 trade classifications covered by this determination.

WD Number: IL20260007-15750-res
Revision: 2
Construction Type: residential
State: Illinois (IL)
County: Madison
Effective: May 17, 2026
Trades covered: 66
Official source: SAM.gov reference IL20260007View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $43.48 $27.24 $70.72 Above median +195% vs market $0.00 $0.00 $0.00 $0.00
BLACK TOP PLANT OILER $43.15 $39.10 $82.25 Top 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $45.50 $35.30 $80.80 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON $33.13 $22.05 $55.18 Above median +33% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, LATHER, PILEDRIVER, AND MILLWRIGHT $31.30 $18.90 $50.20 +37% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, LATHER, PILEDRIVER, AND MILLWRIGHT $41.36 $18.90 $60.26 +64% vs market $0.00 $0.00 $0.00 $0.00
CARPET INSTALLER: CARPET, LINOLEUM, HARDWOOD, AND TILE LAYER $36.08 $18.90 $54.98 Top 10% +165% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $39.00 $30.60 $69.60 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICAL LOW VOLTAGE WIRING INSTALLER (MADISON AND ST. CLAIR COUNTIES) $35.27 $15.65 $50.92 $0.00 $0.00 $0.00 $0.00
ELECTRICAL LOW VOLTAGE WIRING INSTALLER: INSTALLATION, SERVICE, AND MAINTENANCE OF LOW-VOLTAGE SYSTEMS WHICH UTILIZES THE TRANSMISSION AND/OR TRANSFER $36.91 $20.99 $57.90 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: BUILDING (MADISON AND ST. CLAIR COUNTIES) $52.41 $30.27 $82.68 +78% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: BUILDING CONSTRUCTION (MADISON COUNTY) $47.43 $26.16 $73.59 +59% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: RESIDENTIAL (MADISON AND ST. CLAIR COUNTIES) $35.73 $19.66 $55.39 +20% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER (BOND, CALHOUN, CLINTON, GREENE, JACKSON, JERSEY, MACOUPIN, MADISON, MARION, MONROE, PERRY, RANDOLPH, ST. CLAIR, AND WASHINGTON COUNTIES) $43.32 $25.43 $68.75 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $41.65 $31.18 $72.83 Above median +50% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 GENERAL LABORER (MADISON COUNTY) $32.35 $32.38 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER; MASON AND PLASTERER TENDER (MADISON COUNTY) $32.85 $32.38 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 DYNAMITE MAN AND POWDER MAN (MADISON COUNTY) $33.85 $32.38 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER (MADISON COUNTY) $32.84 $27.89 $60.73 Bottom 10% +95% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER (MADISON COUNTY) $34.14 $30.59 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER (MADISON COUNTY) $33.43 $27.30 $60.73 Bottom 10% +95% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER (ST CLAIR COUNTY) $35.38 $29.35 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER (ST. CLAIR COUNTY) $34.14 $30.59 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER (ST. CLAIR COUNTY) $29.26 $31.47 $60.73 Bottom 10% +95% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MADISON COUNTY) $33.34 $27.89 $61.23 Bottom 10% +96% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MADISON COUNTY) $34.64 $30.59 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MADISON COUNTY) $33.93 $27.30 $61.23 Bottom 10% +96% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (ST CLAIR COUNTY) $35.88 $29.35 $65.23 +109% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (ST. CLAIR COUNTY) $34.64 $30.59 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (ST. CLAIR COUNTY) $29.76 $31.47 $61.23 Bottom 10% +96% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER, HOD CARRIER (ST CLAIR COUNTY) $35.88 $29.35 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN (MADISON COUNTY) $34.93 $27.30 $62.23 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN (ST CLAIR COUNTY) $36.88 $29.35 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN (ST. CLAIR COUNTY) $35.64 $30.59 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN (ST. CLAIR COUNTY) $30.76 $31.47 $62.23 Bottom 10% +99% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN (MADISON COUNTY) $34.34 $27.89 $62.23 Bottom 10% +99% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN (MADISON COUNTY) $35.64 $30.59 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BUILDING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM $31.25 $17.12 $48.37 +61% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: RESIDENTIAL EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM $29.95 $17.12 $47.07 +57% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $37.30 $24.75 $62.05 Above median +55% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER (MADISON AND ST. CLAIR COUNTIES) $43.75 $21.25 $65.00 +41% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER (MADISON COUNTY) FOOTNOTES: A. 4 HOURS PAID FOR CHRISTMAS EVE IF HOLIDAY FALLS ON MONDAY THRU FRIDAY $51.61 $21.45 $73.06 +58% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER (ST. CLAIR COUNTY) $47.75 $23.42 $71.17 +54% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC $50.70 $39.10 $89.80 Top 10% +93% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT $51.70 $39.10 $90.80 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT $48.70 $39.10 $87.80 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS $47.57 $39.10 $86.67 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON O $43.09 $39.10 $82.19 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 05 OILERS $43.15 $39.10 $82.25 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT $51.45 $39.10 $90.55 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER $49.70 $39.10 $88.80 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $40.00 $22.05 $62.05 Above median +93% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $34.27 $17.44 $51.71 +15% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $46.57 $24.48 $71.05 Above median +58% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $50.51 $30.25 $80.76 Above median +75% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTERS $54.23 $31.45 $85.68 +85% vs market $0.00 $0.00 $0.00 $0.00
STEAMFITTER (MADISON AND ST. CLAIR COUNTIES) $49.00 $24.42 $73.42 +59% vs market $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $17.55 $0.00 $17.55 Bottom 10% -65% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $11.70 $1.60 $13.30 -48% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UN $45.35 $25.72 $71.07 Top 10% +147% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 2 $45.93 $25.72 $71.65 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 3 $46.25 $25.72 $71.97 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS $46.60 $25.72 $72.32 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. TRUCK DRIVER, GROUP 3 $46.25 $25.72 $71.97 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK $47.71 $25.72 $73.43 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR LESS THAN 5 YEARS OF SERVICE B) EIGHT PAID HOLIDAYS: NEW YEAR'S DAY, M $62.73 $38.44 $101.17 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Madison, IL — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Madison

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IL20260007-15750-res →