Highway Construction — Lee, Illinois
WD IL20260012-16715-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE (TOWNSHIPS OF GENESEE, HAHNAMAN, HOPKINS, HUME, JORDAN, MONTMORENCY, STERLING & TAPI in Lee, Illinois (construction type: highway) is $59.17/hr base + $27.12/hr fringe = $86.29/hr total package (WD IL20260012-16715-hwy, Rev. 1).
Scroll down for all 79 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE (TOWNSHIPS OF GENESEE, HAHNAMAN, HOPKINS, HUME, JORDAN, MONTMORENCY, STERLING & TAPI | $59.17 | $27.12 | $86.29 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| 251), AND WHITESIDE COUNTIES) | $46.54 | $25.42 | $71.96 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| AN EXTRA $.50 PER HOUR. UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDE | $56.05 | $51.05 | $107.10 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN | $53.30 | $51.05 | $104.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER (CARROLL, HENRY, JO DAVIESS, WHITESIDE, AND ROCK ISLAND COUNTIES) | $47.00 | $28.64 | $75.64 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $40.28 | $38.95 | $79.23 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $38.00 | $35.16 | $73.16 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, AND WHITESIDE COUNTIES) | $48.60 | $38.53 | $87.13 Top 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER (OGLE, AND WINNEBAGO COUNTIES) | $51.00 | $36.13 | $87.13 Top 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $40.50 | $33.54 | $74.04 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $41.03 | $36.39 | $77.42 Top 10% +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $36.70 | $22.08 | $58.78 Above median +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| COMBINATION - SMALL EQUIPMENT OPERATOR; GENERATORS - SMALL 50 KW AND UNDER; GENERATORS - LARGE, OVER 50 KW; HEATERS, MECHANICAL; HYDRAULIC POWER UNIT | $59.00 | $51.00 | $110.00 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| COMPRESSOR AND THROTTLE VALVE; COMPRESSOR, COMMON RECEIVER; CONCRETE BREAKER OR HYDRO HAMMER; CONCRETE GRINDING MACHINE; CONCRETE MIXER OR PAVER 7S SE | $62.45 | $51.00 | $113.45 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| COUNTIES) | $46.15 | $25.42 | $71.57 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| COUNTIES) | $45.88 | $25.42 | $71.30 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| COUNTIES) | $45.29 | $25.42 | $70.71 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (BUREAU AND HENRY COUNTIES) | $50.45 | $44.96 | $95.41 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (CARROLL, HENRY, JO DAVIESS, WHITESIDE, AND ROCK ISLAND COUNTIES) | $46.00 | $28.56 | $74.56 Top 10% +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE AND WINNEBAGO COUNTIES) | $62.61 | $43.96 | $106.57 Top 10% +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $45.50 | $38.90 | $84.40 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (CARROLL, HENRY, JO DAVIESS, KNOX, MERCER, ROCK ISLAND, WARREN, AND WHITESIDE COUNTIES) | $38.25 | $32.28 | $70.53 Top 10% +45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENS, WHITESIDE, AND WINNEBAGO COUNTIES) | $41.37 | $44.41 | $85.78 Top 10% +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1 FLAGMAN, DUMPMAN, SPOTTER, BROOM MAN, REMOVAL OF TREES, FENCING LABORERS, CLEANING OF FORMS OR LUMBER, MOVING AND/OR MAINTENANCE OF FL | $33.77 | $23.60 | $57.37 Top 10% +84% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1 UNSKILLED - ALL CLASSIFICATIONS NOT LISTED | $40.54 | $32.42 | $72.96 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 ASPHALT RAKER OR LUTEMAN, HEAD FORM SETTER, HEAD DYNAMITE MAN HEAD STRING OR WIRELINE MAN, PIPE SETTER ON SEWER OR WATER MAIN, GUNNITE | $34.27 | $23.60 | $57.87 Top 10% +85% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 SEMI-SKILLED - HANDLING OF MATERIALS TREATED WITH OIL, CREOSOTE, ASPHALT AND/OR FORIEGN MATERIAL HARMFUL TO SKIN OR CLOTHING; TRACK LA | $40.54 | $32.42 | $72.96 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3 CONCRETE SPECIALIST | $34.90 | $23.60 | $58.50 Top 10% +88% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3 SKILLED - MASON TENDERS; CAISSON WORKERS PLUS DEPTH; GUNNITE NOZZLE MEN; LEAD MAN ON SEWER WORK; WELDERS, CUTTERS, BURNERS & TORCHMEN | $40.54 | $32.42 | $72.96 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 4 DYNAMITE MAN | $41.54 | $32.42 | $73.96 Top 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 5 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER | $42.54 | $32.42 | $74.96 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GENERAL LABORER: ALL CLASSIFICATIONS NOT LISTED BELOW | $35.23 | $28.10 | $63.33 Top 10% +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GENERAL LABORER: CARPENTER TENDER, TOOL CRIBMAN, FIREMAN OR SALAMANDER TENDER, FLAGMAN, GRAVEL BOX MAN, BUMPMAN & SPOTTER, FORM HANDLER, MATE | $47.04 | $36.31 | $83.35 Top 10% +167% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GENERAL LABORER: CARPENTER TENDER, TOOL CRIBMAN, FIREMAN OR SALAMANDER TENDER, FLAGMAN, GRAVEL BOX MAN, DUMPMAN & SPOTTER, FORM HANDLER, MATE | $49.17 | $34.25 | $83.42 Top 10% +167% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: SKILLED LABORER: ASBESTOS ABATEMENT WORKER, HAZARDOUS WASTE WORKER, HANDLING ANY MATERIALS WITH ANY FOREIGN MATTER HARMFUL TO SKIN OR CLOTHIN | $50.39 | $36.31 | $86.70 Top 10% +178% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: SKILLED LABORER: FLAGGERS; TRAFFIC CONTROL AND ALL ASSOCIATED WORK; HANDLING OF MATERIALS TREATED WITH OIL, CREOSOTE, ASPHALT AND/OR FORIEGN | $36.23 | $28.10 | $64.33 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: SKILLED LABORER: HANDLING ANY MATERIALS WITH ANY FOREIGN MATTER HARMFUL TO SKIN OR CLOTHING, TRACK LABOR, CEMENT HANDLER, CHLORIDE HANDLER, U | $52.52 | $34.25 | $86.77 Top 10% +178% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION, CABLE SPLICER (CARROLL, JO DAVIESS, HENRY ROCK ISLAND & WHITESIDE (TOWNSHIPS OF ALBANY, CLYDE, ERIE, FENTON, FULTON, GARDEN PLA | $53.12 | $24.53 | $77.65 Top 10% +52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION, DYNAMITER (CARROLL, JO DAVIESS, HENRY ROCK ISLAND & WHITESIDE (TOWNSHIPS OF ALBANY, CLYDE, ERIE, FENTON, FULTON, GARDEN PLAIN | $43.92 | $21.49 | $65.41 Top 10% +28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION, GROUNDMAN (CARROLL, JO DAVIESS, HENRY ROCK ISLAND & WHITESIDE (TOWNSHIPS OF ALBANY, CLYDE, ERIE, FENTON, FULTON, GARDEN PLAIN | $34.64 | $18.43 | $53.07 Top 10% +4% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION, GROUNDMAN EQUIPMENT OPERATOR (CARROLL, JO DAVIESS, HENRY ROCK ISLAND & WHITESIDE (TOWNSHIPS OF ALBANY, CLYDE, ERIE, FENTON, FUL | $41.61 | $20.73 | $62.34 Top 10% +22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION, GROUNDMAN TRUCK DRIVER (CARROLL, JO DAVIESS, HENRY ROCK ISLAND & WHITESIDE (TOWNSHIPS OF ALBANY, CLYDE, ERIE, FENTON, FULTON, G | $36.15 | $18.93 | $55.08 Top 10% +8% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION, LINEMAN, TECHNICIAN, HEAVY EQUIPMENT OPERATOR (CARROLL, JO DAVIESS, HENRY ROCK ISLAND & WHITESIDE (TOWNSHIPS OF ALBANY, CLYDE | $52.67 | $24.38 | $77.05 Top 10% +51% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE & WINNEBAGO COUNTIES) FOOTNOTE: A. PAID HOLIDAYS: MEMORIA | $49.22 | $23.73 | $72.95 Top 10% +43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE & WINNEBAGO COUNTIES) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, IN | $37.81 | $19.86 | $57.67 Top 10% +13% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE & WINNEBAGO COUNTIES) FOOTNOTE: A. PAID HOLIDAYS: MEM | $39.19 | $20.32 | $59.51 Top 10% +17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN/EQUIPMENT OPERATOR (BUREAU & HENRY) | $52.63 | $24.35 | $76.98 Top 10% +51% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER (BUREAU & HENRY) | $39.92 | $20.22 | $60.14 Top 10% +18% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: LINEMAN AND SUBSTATION TECHNICIAN (BUREAU & HENRY) | $58.58 | $26.29 | $84.87 Top 10% +67% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 1 ASPHALT PLANT*; ASPHALT HEATER AND PLANER COMBINATION; ASPHALT HEATER SCARFIRE*; ASPHALT SPREADER; AUTOGRADER; ABG | $63.00 | $51.00 | $114.00 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 1 CRANES: OVERHEAD CRANES; HYDRO CRANE; SHOVELS; CRANE TYPE BACKFILLER; TOWER CRANES-MOBILE, CRAWLER, STATIONARY; DER | $47.79 | $43.42 | $91.21 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 2 BULKER & PUMP; POWER LAUNCHES; BORING MACHINE & PIPE JACKING MACHINE; DINKEYS; CARTS, POWERED HAUL UNIT FOR A BORIN | $44.09 | $43.42 | $87.51 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER; CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE | $43.50 | $41.25 | $84.75 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 3 STRAIGHT FRAMED TRUCK AND TRUCK MOUNTED VAC UNIT, STARTING ENGINEER; TRAC AIR MACHINE W/O ATTACHMENTS; ROLLERS, 5 T | $38.03 | $43.42 | $81.45 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR; COMPACT LOADER; ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER; SMALL OUTBOARD MOTOR BOAT; WATER | $37.80 | $41.25 | $79.05 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 5 BOBCATS; BRICK FORKLIFTS; DIRECTIONAL BORING MACHINE LOCATOR; OILERS (BUREAU COUNTY) | $57.80 | $51.00 | $108.80 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRIDGES | $32.00 | $17.37 | $49.37 Bottom 10% +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER | $30.00 | $17.37 | $47.37 Above median +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY, AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES | $40.00 | $26.90 | $66.90 Top 10% +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL | $45.15 | $29.41 | $74.56 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY, STRUCTURAL STEEL, & SANDBLASTING | $30.50 | $17.37 | $47.87 Top 10% +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, AND WHITESIDE COUNTIES) | $38.98 | $36.58 | $75.56 Top 10% +89% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MO | $54.75 | $51.05 | $105.80 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MO | $56.60 | $51.05 | $107.65 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| THE NORTHERN BUREAU COUNTY LINE.)) | $60.40 | $51.00 | $111.40 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UN | $45.35 | $25.72 | $71.07 Top 10% +147% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 2 | $45.93 | $25.72 | $71.65 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 3 | $46.25 | $25.72 | $71.97 Top 10% +150% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS | $46.60 | $25.72 | $72.32 Top 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK | $47.71 | $25.72 | $73.43 Top 10% +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (BUREAU, CARROLL, JODAVIESS, LEE, OGLE | $47.64 | $25.42 | $73.06 Top 10% +154% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 2 OR 3 AXLES (CARROLL, JODAVIESS, STEPHENSON, AND WINNEBAGO COUNTIES) FOOTNOTE: .20 CENTS ADDITIONAL PER AXLE OVER 6 AXLES | $48.47 | $26.70 | $75.17 Top 10% +161% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 2-3 AXLES (LEE, AND OGLE COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS | $44.83 | $0.30 | $45.13 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 4 AXLES (CARROLL, JODAVIESS, STEPHENSON, AND WINNEBAGO COUNTIES) FOOTNOTE: .20 CENTS ADDITIONAL PER AXLE OVER 6 AXLES | $48.62 | $26.70 | $75.32 Top 10% +162% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 4 AXLES (LEE, AND OGLE COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN | $44.98 | $0.30 | $45.28 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 5 AXLES (CARROLL, JODAVIESS, STEPHENSON, AND WINNEBAGO COUNTIES) FOOTNOTE: .20 CENTS ADDITIONAL PER AXLE OVER 6 AXLES | $48.82 | $26.70 | $75.52 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 5 AXLES (LEE, AND OGLE COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN | $45.18 | $0.30 | $45.48 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 6 AXLES (CARROLL, JODAVIESS, STEPHENSON, AND WINNEBAGO COUNTIES) FOOTNOTE: .20 CENTS ADDITIONAL PER AXLE OVER 6 AXLES | $48.93 | $26.70 | $75.63 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 6 AXLES (LEE, AND OGLE COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN | $45.38 | $0.30 | $45.68 Top 10% +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Lee, IL — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Lee
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Lee, Illinois.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.