Building Construction — Jefferson, Illinois
WD IL20260002-15747-bld · Revision 4 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF in Jefferson, Illinois (construction type: building) is $40.20/hr base + $26.78/hr fringe = $66.98/hr total package (WD IL20260002-15747-bld, Rev. 4).
Scroll down for all 184 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF | $40.20 | $26.78 | $66.98 Top 10% +180% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/INSULATOR | $55.02 | $35.75 | $90.77 Top 10% +279% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS; PROTECTIVE COVERINGS, COATINGS, AND FINISHINGS TO ALL TYPES OF MECHAN | $55.02 | $35.75 | $90.77 Top 10% +279% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS; PROTECTIVE COVERINGS, COATINGS, AND FINISHINGS TO ALL TYPES OF MECHA | $38.19 | $24.24 | $62.43 Top 10% +161% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION, INSTALLATION, AND CLEANUP OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINIS | $43.48 | $27.24 | $70.72 Top 10% +195% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BASE MACHINE MEN | $31.13 | $21.09 | $52.22 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BLACK TOP PLANT OILER FAYETTE, JEFFERSON, MARION, AND PERRY COUNTIES | $43.15 | $39.10 | $82.25 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $45.23 | $32.76 | $77.99 +70% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $45.50 | $35.30 | $80.80 Above median +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $31.56 | $22.28 | $53.84 +30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER (FORD, AND IROQUOIS COUNTIES) | $44.37 | $24.70 | $69.07 Top 10% +66% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON | $30.59 | $23.19 | $53.78 Above median +30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON | $30.79 | $21.69 | $52.48 +26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON | $33.49 | $24.93 | $58.42 Above median +41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: BRICKLAYER, STONEMASON, MARBLE MASON, TILE LAYER, POINTER, CLEANER, AND CAULKER | $33.13 | $22.05 | $55.18 Top 10% +33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: CAULKERS, CEMENT BLOCK LAYERS, CLEANERS, MARBLE SETTERS, POINTERS, TERRAZZO WORKERS, AND TILE SETTERS | $33.49 | $24.93 | $58.42 Top 10% +41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $32.14 | $25.24 | $57.38 +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, LATHER, PILEDRIVER, AND MILLWRIGHT DIVERS | $38.62 | $18.90 | $57.52 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER/LATHER | $33.36 | $28.60 | $61.96 Above median +69% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER/LATHER | $32.83 | $27.45 | $60.28 +64% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER/LATHER | $37.11 | $24.85 | $61.96 Above median +69% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER/LATHER | $33.71 | $28.25 | $61.96 Above median +69% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER/LATHER | $36.04 | $21.34 | $57.38 Bottom 10% +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER/LATHER (DE WITT AND FORD COUNTIES) | $34.29 | $29.94 | $64.23 Top 10% +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER/LATHER (FORD COUNTY) | $33.58 | $29.94 | $63.52 Top 10% +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: LATHER, PILEDRIVER, AND MILLWRIGHT | $38.62 | $18.90 | $57.52 Bottom 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPET INSTALLER: CARPET, LINOLEUM, HARDWOOD, AND TILE LAYER | $36.08 | $18.90 | $54.98 Top 10% +165% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CATV INSTALLER | $37.50 | $32.78 | $70.28 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $33.16 | $19.60 | $52.76 Above median +42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER (CHRISTIAN COUNTY) | $31.80 | $26.89 | $58.69 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER (DE WITT COUNTY) | $30.69 | $23.29 | $53.98 Top 10% +45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/PLASTERER (CHRISTIAN, DE WITT, PIATT, AND SHELBY COUNTY) | $22.50 | $9.75 | $32.25 Top 10% -13% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASONS & PLASTERERS | $30.83 | $18.06 | $48.89 Top 10% +31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRIVER OPERATOR, PULLS & SCRAPERS, POWER PAC & CONTROLS, PUG MILL, PULVERIZER OR TILLERS, PUSH CATS, QUAD TRAC, ROTOMILLS, ROTATING CAB FORKLIFTS, RUB | $40.13 | $32.00 | $72.13 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICAL LOW VOLTAGE WIRING INSTALLER, BUILDING (ALEXANDER, BOND, CLAY, CLINTON, EDWARDS, EFFINGHAM, FAYETTE, FRANKLIN, GALLATIN, HAMILTON, HARDIN | $38.44 | $19.37 | $57.81 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICAL LOW VOLTAGE WIRING INSTALLER, BUILDING (CHAMPAIGN, DEWITT, DOUGLAS, FORD, IROQUIOS, LASALLE, LIVINGSTON, MARSHALL, PIATT, PUTNAM, AND WOODF | $36.25 | $21.65 | $57.90 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICAL LOW VOLTAGE WIRING INSTALLER: BUILDING (DEWITT, WESTERN, MCLEAN, AND WOODFORD COUNTIES) | $40.63 | $20.47 | $61.10 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICAL LOW VOLTAGE WIRING INSTALLER: BUILDING (IROQUOIS, AND VERMILION COUNTIES) | $40.64 | $20.46 | $61.10 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $46.14 | $21.67 | $67.81 Above median +46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $45.00 | $26.70 | $71.70 Above median +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (ALEXANDER, CLAY, EDWARDS, EFFINGHAM, FAYETTE, FRANKLIN, GALLATIN, HAMILTON, HARDIN, JACKSON, JEFFERSON, JOHNSON, MARION, MASSAC, PERRY, P | $52.14 | $29.14 | $81.28 Top 10% +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (CHAMPAIGN, DE WITT, DOUGLAS, FORD, IROQUOIS, AND PIATT COUNTIES) | $49.63 | $22.51 | $72.14 Top 10% +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (CHRISTIAN, COLES, CUMBERLAND, DE WITT, DOUGLAS, EFFINGHAM, FAYETTE, MACON, MOULTRIE, PIATT, AND SHELBY COUNTIES) | $48.00 | $24.16 | $72.16 Top 10% +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (DE WITT COUNTY) | $43.86 | $23.72 | $67.58 Top 10% +46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (IROQUOIS, VERMILION, AND WABASH COUNTIES) | $41.00 | $27.36 | $68.36 Top 10% +48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC FOOTNOTES: A) EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF | $62.73 | $38.44 | $101.17 Top 10% +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FIRE STOP TECHNICIAN | $44.02 | $32.76 | $76.78 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $39.74 | $27.78 | $67.52 Above median +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $36.03 | $20.65 | $56.68 Above median +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $32.86 | $19.44 | $52.30 +81% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $39.77 | $22.73 | $62.50 Above median +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER (BOND, CALHOUN, CLINTON, GREENE, JACKSON, JERSEY, MACOUPIN, MADISON, MARION, MONROE, PERRY, RANDOLPH, ST. CLAIR, AND WASHINGTON COUNTIES) | $43.32 | $25.43 | $68.75 Top 10% +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER | $41.27 | $32.76 | $74.03 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, W | $41.27 | $32.76 | $74.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $38.00 | $26.39 | $64.39 +33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (ALEXANDER, FRANKLIN, HARDIN, JACKSON, JOHNSON, MASSAC, POPE, PULASKI, SALINE, UNION, AND WILLIAMSON COUNTIES) | $37.66 | $32.10 | $69.76 Top 10% +44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (CHAMPAIGN, DE WITT, DOUGLAS, EDGAR, FORD, IROQUOIS, MOULTRIE, PIATT, AND VERMILION COUNTIES) | $37.71 | $29.65 | $67.36 Top 10% +39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (CLAY, EDWARDS, FRANKLIN, GALLATIN, HAMILTON, JEFFERSON, LAWRENCE, MARION, RICHLAND, SALINE, WABASH, WAYNE, AND WHITE COUNTIES) | $35.34 | $26.40 | $61.74 Top 10% +27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (CLAY, FAYETTE, FRANKLIN, JACKSON, JEFFERSON, MARION, AND PERRY COUNTIES) | $41.65 | $31.18 | $72.83 Top 10% +50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1 GENERAL LABORER AND SKILLED LABORER - HANDLING OF MATERIALS TREATED WITH OIL, CREOSOTE, ASPHALT AND/OR FORIEGN MATERIAL HARMFUL TO SKI | $42.25 | $33.59 | $75.84 Top 10% +143% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; DYNAMITE MAN; LEAD BASE PAINT ABATEMENT WORKER | $43.25 | $33.59 | $76.84 Top 10% +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASBESTOS ABATEMENT WORKER | $35.17 | $29.26 | $64.43 +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASBESTOS ABATEMENT WORKER | $36.82 | $28.44 | $65.26 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASBESTOS ABATEMENT WORKER | $37.15 | $27.99 | $65.14 Above median +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASBESTOS ABATEMENT WORKER (CLARK, COLES, CUMBERLAND, DOUGLAS, EDGAR, MOULTRIE, AND SHELBY COUNTIES) | $35.19 | $28.90 | $64.09 Top 10% +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GENERAL LABORER | $32.17 | $29.26 | $61.43 +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GENERAL LABORER | $33.82 | $28.44 | $62.26 Above median +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GENERAL LABORER | $35.15 | $27.89 | $63.04 Above median +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GENERAL LABORER (CLARK, COLES, CUMBERLAND, DOUGLAS, EDGAR, MOULTRIE, AND SHELBY COUNTIES) | $32.19 | $28.90 | $61.09 Top 10% +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GENERAL LABORER (MOULTRIE COUNTY)..$ 32.19 29.24 LABORER: ASBESTOS ABATEMENT WORKER (MOULTRIE COUNTY) | $35.19 | $29.24 | $64.43 Top 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: ASBESTOS ABATEMENT WORKER | $35.69 | $28.44 | $64.13 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GENERAL LABORER | $32.69 | $28.44 | $61.13 Bottom 10% +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE & TILE SETTER AND TERRAZZO WORKER | $33.65 | $20.70 | $54.35 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE SETTER (FORD & IROQUOIS COUNTIES) | $42.98 | $21.79 | $64.77 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE SETTER, TERRAZZO WORKER & TILE SETTER | $32.53 | $19.38 | $51.91 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE, TERRAZZO AND TILE FINISHER | $31.03 | $19.38 | $50.41 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE, TERRAZZO AND TILE FINISHER | $32.13 | $20.70 | $52.83 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE, TILE & TERRAZZO FINISHER | $31.13 | $21.09 | $52.22 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE, TILE & TERRAZZO WORKERS | $32.87 | $21.09 | $53.96 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE, TILE & TERRAZZO WORKERS | $29.60 | $13.33 | $42.93 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $33.06 | $29.36 | $62.42 +72% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $33.06 | $30.04 | $63.10 +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, CLASS B: OILERS CLASSIFIED AS ASSISTANT OPERATORS, AIR TRACK DRILL/COMPRESSOR, ALL MACHINES USED TO SWEEP, CLEAN, BROOM OR | $38.23 | $32.00 | $70.23 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 1 POWER CRANES, DRAGLINES, DERRICKS, SHOVELS, GRADALLS, MECHANICS, TRACTOR HIGHLIFT, TOURNADOZER, CONCRETE MIXERS WIT | $45.15 | $26.00 | $71.15 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: RIVER | $36.78 | $32.00 | $68.78 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: RIVER | $40.23 | $32.00 | $72.23 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: RIVER Class 1 | $40.23 | $32.00 | $72.23 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: RIVER Class 2 | $36.78 | $32.00 | $68.78 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $31.37 | $20.02 | $51.39 Top 10% +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $31.25 | $17.12 | $48.37 Bottom 10% +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $35.29 | $14.50 | $49.79 Above median +66% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM | $32.23 | $20.58 | $52.81 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER SPRAY, SANDBLASTING AND WATER BLAST UNITS WITH 3500 PSI RECEIVE $.50 PER HOUR PREMIMUM. ALL WORK FORTY FEET AND ABOVE RECEIVE $1.00 PER HOUR P | $24.50 | $15.50 | $40.00 Top 10% +33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BLASTING, SPRAYING & PRESSURE WASHING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM BRUSH & ROLLER WORK OVER 30FT ABOVE GROUND OR FLOOR | $28.37 | $21.05 | $49.42 Top 10% +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH & ROLLER AND WALL COVERING DRYWALL PREPARING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM BRUSH & ROLLER WORK OVER 30FT ABOVE GR | $27.37 | $21.05 | $48.42 Top 10% +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH & ROLLER OF MASTICS, CREOSOTES, KWINCH KOATE, AND COAL TAR EPOXY FOOTNOTE A: ALL STRUCTURES OVER 40FT.? $0.75/ HOUR ABOVE BASE WAGE ALL | $28.30 | $20.08 | $48.38 Top 10% +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND PAPERHANGER FOOTNOTE A: ALL STRUCTURES OVER 40FT.? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT.? $1.50/ HOUR ABOVE | $27.30 | $20.08 | $47.38 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY, AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES | $40.00 | $26.90 | $66.90 Top 10% +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER, TAPER, PAPERHANGER, SWING STAGE, SCAFFOLD OVER 30FT., EPOXY, TOXIC MATERIAL, SANDBLAST, SPRAY, MACHINE TAPING, AND RESIDENTIAL | $41.00 | $27.80 | $68.80 Top 10% +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: JOURNEYMAN EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $26.50 | $19.01 | $45.51 Top 10% +52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST, AND STEAM CLEANING FOOTNOTE A: ALL STRUCTURES OVER 40? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES | $28.30 | $20.08 | $48.38 Top 10% +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: TAPING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $27.30 | $19.01 | $46.31 Top 10% +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER | $34.36 | $28.60 | $62.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER | $38.11 | $24.85 | $62.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER | $34.71 | $28.25 | $62.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER | $37.04 | $21.34 | $58.38 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER | $33.83 | $27.45 | $61.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER (DE WITT AND FORD COUNTIES) | $35.29 | $29.94 | $65.23 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER (FORD COUNTY) | $34.58 | $29.94 | $64.52 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $55.00 | $38.62 | $93.62 Top 10% +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER/STEAMFITTER (CHRISTIAN COUNTY) | $43.89 | $25.71 | $69.60 Top 10% +50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $32.85 | $21.65 | $54.50 Above median +37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER (CHRISTIAN COUNTY) | $35.41 | $27.31 | $62.72 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $55.40 | $38.27 | $93.67 Top 10% +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER AND STEAMFITTER (CHAMPAIGN, COLES, CUMBERLAND, EFFINGHAM, FORD, JASPER, AND PIATT COUNTIES) | $54.31 | $24.15 | $78.46 Top 10% +70% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER AND STEAMFITTER (CHRISTIAN, DE WITT, MOULTRIE, PIATT, AND SHELBY COUNTIES) | $37.96 | $18.87 | $56.83 Top 10% +23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PIPEFITTER, STEAMFITTER | $46.32 | $21.43 | $67.75 Bottom 10% +46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PIPEFITTER, STEAMFITTER | $46.65 | $23.45 | $70.10 +52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PIPEFITTER, STEAMFITTER | $45.00 | $21.54 | $66.54 Bottom 10% +44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER (ALEXANDER, HARDIN, JACKSON, JOHNSON, MASSAC, PERRY, POPE PULLASKI, UNION, AND WILLIAMSON COUNTIES) | $52.80 | $23.95 | $76.75 Top 10% +66% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER (FRANKLIN, GALLATIN, HAMILTION, JEFFERSON, SALINE, WAYNE, AND WILLIAMSON COUNTIES) | $48.50 | $28.85 | $77.35 Top 10% +67% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1 ASPHALT PLANT ENGINEER; ASPHALT SCREED MAN; APSCO CONCRETE SPREADER; ASPHALT PAVER; ASPHALT ROLLER ON BITUMINOUS CONT | $40.71 | $28.75 | $69.46 Above median +49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC | $50.70 | $39.10 | $89.80 Top 10% +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT | $51.70 | $39.10 | $90.80 Top 10% +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 2 ASPHALT BOOSTER & HEATER; ASPHALT DISTRIBUTOR; ASPHALT PLANT FIREMAN;BUILDING ELEVATOR; BULL FLOAT OR FLEXPLANE; CONC | $38.18 | $28.75 | $66.93 Bottom 10% +44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 3 AIR COMPRESSOR, TRACK OR SELF-PROPELLED; BULK CEMENT BATCHING- PLANTS; CONVEYORS; CONCRETE MIERS FIREMENT, GENERATORS | $34.30 | $28.75 | $63.05 Top 10% +35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 4 LATTICE BOOM CRAWLER CRANE, LATTICE BOOM TRUCK CRANE, TELESCOPIC TRUCK MOUNTED CRANE, TOWER CRANE PREMIUM PAY- CRANES | $42.32 | $28.75 | $71.07 Top 10% +52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT | $48.70 | $39.10 | $87.80 Top 10% +88% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS FAYETTE, JEFFERSON, MARION, AND PERRY COUNTIES | $47.57 | $39.10 | $86.67 Top 10% +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON O | $43.09 | $39.10 | $82.19 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 05 OILERS FAYETTE, JEFFERSON, MARION, AND PERRY COUNTIES | $43.15 | $39.10 | $82.25 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT FAYETTE, JEFFERSON, MARION | $51.45 | $39.10 | $90.55 Top 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER. FAYETTE, JEF | $49.70 | $39.10 | $88.80 Top 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PREMIUM | $31.25 | $22.30 | $53.55 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PREMIUM | $30.50 | $22.30 | $52.80 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $32.85 | $17.86 | $50.71 Above median +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $30.50 | $18.26 | $48.76 Above median +52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER (CHAMPAIGN, CLARK, COLES, CUMBERLAND, DOUGLAS, EDGAR, FORD, PIATT, AND VERMILION COUNTIES) | $38.00 | $22.17 | $60.17 Top 10% +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER (CHRISTIAN COUNTY) | $36.00 | $26.36 | $62.36 Top 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER (CHRISTIAN, CLAY, DE WITT, EFFINGHAM, FAYETTE, JASPER, MOULTRIE, PIATT, RICHLAND, AND SHELBY COUNTIES) | $35.07 | $27.41 | $62.48 Top 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: COMPOSITION ROOFER | $36.12 | $20.01 | $56.13 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: SLATE, TILE, CONCRETE, SLAB, AND GYPSUM PLANK | $36.62 | $20.01 | $56.63 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $33.50 | $20.45 | $53.95 +20% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $42.73 | $29.54 | $72.27 Above median +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $56.35 | $38.65 | $95.00 Top 10% +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $46.57 | $24.48 | $71.05 Above median +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| STRUCTURES OVER 100FT.? $2.50/ HOUR ABOVE BASE WAGE.$ 29.55 20.08 PAINTER: DRYWALL FINISHERS AND PLASTERERS FOOTNOTE A: ALL STRUCTURES OVER 40FT.? $0 | $27.55 | $20.08 | $47.63 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRACT JACK, POWER BROOM, SELF-PROPELLED FROM TAMPER, TRAC-AIR, MIXERS - LESS THAN 21 CU.FT., MORTAR MIXER W/SKI OR PUMP, MUD JACKS, ONE WELL POINT PUM | $30.83 | $32.00 | $62.83 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 1 (CHAMPAIGN, COLES, CUMBERLAND, DEWITT, DOUGLAS, EFFINGHAM, FORD, IROQUOIS, JASPER, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST C | $45.29 | $25.42 | $70.71 Top 10% +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 1 (CHRISTIAN, MOULTRIE (WEST OF A LINE FROM THE NE CORNER, EXTENDING STRAIGHT SE IN THE DIRECTION OF FINDLAY TO A POINT THAT INTER | $43.28 | $27.56 | $70.84 Top 10% +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLE TRUCKSHAULING LESS THAN 9 TON; AIR COMPRESSOR AND WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPAR | $38.55 | $16.11 | $54.66 Top 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UN | $45.35 | $25.72 | $71.07 Top 10% +147% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 1: DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE U | $43.28 | $27.56 | $70.84 Above median +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 2 | $45.93 | $25.72 | $71.65 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 2 | $43.86 | $27.56 | $71.42 +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 2 (CHAMPAIGN, COLES, CUMBERLAND, DEWITT, DOUGLAS, EFFINGHAM, FORD, IROQUOIS, JASPER, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST C | $45.88 | $25.42 | $71.30 Top 10% +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 2 (CHRISTIAN, MOULTRIE (WEST OF A LINE FROM THE NE CORNER, EXTENDING STRAIGHT SE IN THE DIRECTION OF FINDLAY TO A POINT THAT INTER | $43.86 | $27.56 | $71.42 Top 10% +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 2: 2 OR 3 AXLE TRUCKS HAULING MORE THAN 9 TON BUT HAULING LESS THAN 16 TON; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS | $38.97 | $16.11 | $55.08 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 3 | $46.25 | $25.72 | $71.97 Top 10% +150% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 3 | $39.18 | $16.11 | $55.29 Bottom 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 3 | $44.15 | $27.56 | $71.71 +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 3 (CHAMPAIGN, COLES, CUMBERLAND, DEWITT, DOUGLAS, EFFINGHAM, FORD, IROQUOIS, JASPER, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST C | $46.15 | $25.42 | $71.57 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 3 (CHRISTIAN, MOULTRIE (WEST OF A LINE FROM THE NE CORNER, EXTENDING STRAIGHT SE IN THE DIRECTION OF FINDLAY TO A POINT THAT INTER | $44.15 | $27.56 | $71.71 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 4 (CHAMPAIGN, COLES, CUMBERLAND, DEWITT, DOUGLAS, EFFINGHAM, FORD, IROQUOIS, JASPER, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST C | $46.54 | $25.42 | $71.96 Top 10% +150% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 4 (CHRISTIAN, MOULTRIE (WEST OF A LINE FROM THE NE CORNER, EXTENDING STRAIGHT SE IN THE DIRECTION OF FINDLAY TO A POINT THAT INTER | $44.53 | $27.56 | $72.09 Top 10% +151% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS | $46.60 | $25.72 | $72.32 Top 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 4 LOW BOY; OIL DISTRIBUTORS FOOTNOTE: A. $46.20 PER DAY | $39.44 | $16.11 | $55.55 Top 10% +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS | $44.53 | $27.56 | $72.09 Above median +151% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 5 (CHAMPAIGN, COLES, CUMBERLAND, DEWITT, DOUGLAS, EFFINGHAM, FORD, IROQUOIS, JASPER, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST C | $47.64 | $25.42 | $73.06 Top 10% +154% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 5 (CHRISTIAN, MOULTRIE (WEST OF A LINE FROM THE NE CORNER, EXTENDING STRAIGHT SE IN THE DIRECTION OF FINDLAY TO A POINT THAT INTER | $45.61 | $27.56 | $73.17 Top 10% +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK | $47.71 | $25.72 | $73.43 Top 10% +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. FOOTNOTE: A. $46.20 PER DAY | $39.44 | $16.11 | $55.55 Top 10% +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK | $45.61 | $27.56 | $73.17 Above median +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 2 OR 3 AXLE TRUCKS (FORD COUNTY) FOOTNOTES: A. $1055.60 PER WEEK. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIO | $44.82 | $0.25 | $45.07 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 2 OR 3 AXLES (IROQUOIS COUNTY) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONA | $44.82 | $0.25 | $45.07 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 4 AXLE TRUCKS (FORD COUNTY) FOOTNOTES: A. $1055.60 PER WEEK. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $ | $44.97 | $0.25 | $45.22 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 4 AXLES (IROQUOIS COUNTY) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.2 | $44.97 | $0.25 | $45.22 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 5 AXLE TRUCKS (FORD COUNTY) FOOTNOTES: A. $1055.60 PER WEEK. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $ | $45.17 | $0.25 | $45.42 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 5 AXLES (IROQUOIS COUNTY) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.2 | $45.17 | $0.25 | $45.42 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 6 AXLE TRUCKS (FORD COUNTY) FOOTNOTES: A. $1055.60 PER WEEK. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $ | $45.37 | $0.25 | $45.62 Top 10% +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 6 AXLES (IROQUOIS COUNTY) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.2 | $45.37 | $0.25 | $45.62 Top 10% +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| UNDER, ROLLERS ON AGGREGATE AND SEAL COAT SURFACES, FORK LIFTS (WHEN USED FOR LANDSCAPING WORK, CONCRETE AND BLACKTOP CURB MACHINE, FARM TRACTOR WITH | $30.05 | $26.00 | $56.05 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| VACATION PAY CREDIT FORE EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE; AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE B) PAID HOLIDAYS: NEW YEAR'S DAY; MEMO | $60.17 | $38.44 | $98.61 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| VACATION PAY CREDIT FORE EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE; AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE B) PAID HOLIDAYS: NEW YEAR'S DAY; MEMO | $57.99 | $38.44 | $96.43 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Jefferson, IL — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Jefferson
Compliance Notes
- This wage determination applies to federal contracts for building construction in Jefferson, Illinois.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.