WD IL20260013-16727-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for AIR TOOLS OR ANY OTHER TYPE 8 FEET OR MORE BELOW GROUND LEVEL; VIBRATORS-ANY TYPE-8 FEET OR MORE BELOW GROUND LEVEL in Iroquois, Illinois (construction type: highway) is $51.63/hr base + $36.94/hr fringe = $88.57/hr total package (WD IL20260013-16727-hwy, Rev. 1).
Scroll down for all 80 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| AIR TOOLS OR ANY OTHER TYPE 8 FEET OR MORE BELOW GROUND LEVEL; VIBRATORS-ANY TYPE-8 FEET OR MORE BELOW GROUND LEVEL | $51.63 | $36.94 | $88.57 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $37.06 | $31.16 | $68.22 Above median +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $49.76 | $35.87 | $85.63 Top 10% +133% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $42.65 | $38.96 | $81.61 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $40.50 | $33.54 | $74.04 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $46.00 | $37.04 | $83.04 Top 10% +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $31.51 | $17.50 | $49.01 Above median +32% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER (LIVINGSTON COUNTY) | $32.11 | $25.52 | $57.63 Top 10% +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER (LIVINGSTON, MCLEAN, AND WOODFORD COUNTIES) | $33.46 | $22.22 | $55.68 Top 10% +50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER (MARSHALL AND WOODFORD COUNTIES) | $32.11 | $25.52 | $57.63 Top 10% +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| COMBINATION - SMALL EQUIPMENT OPERATOR; GENERATORS - SMALL 50 KW AND UNDER; GENERATORS - LARGE, OVER 50 KW; HEATERS, MECHANICAL; HYDRAULIC POWER UNIT | $59.00 | $51.00 | $110.00 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| COMPRESSOR AND THROTTLE VALVE; COMPRESSOR, COMMON RECEIVER; CONCRETE BREAKER OR HYDRO HAMMER; CONCRETE GRINDING MACHINE; CONCRETE MIXER OR PAVER 7S SE | $62.45 | $51.00 | $113.45 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $50.45 | $44.96 | $95.41 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $51.60 | $45.00 | $96.60 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $52.00 | $45.01 | $97.01 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (FORD, IROQUOIS, AND PUTNAM COUNTIES (FORD, IROQUOIS, LA SALLE KANKAKEE, & PUTNAM COUNTIES) | $50.45 | $44.96 | $95.41 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (FORD, IROQUOIS, LA SALLE, LIVINGSTON, MCLEAN, MARSHALL, PUTNAM, AND WOODFORD COUNTIES) | $49.63 | $22.51 | $72.14 Top 10% +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (IROQUOIS COUNTY) | $41.00 | $27.36 | $68.36 Top 10% +48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (KANKAKEE AND LASALLE COUNTIES (LA SALLE) | $51.60 | $45.00 | $96.60 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (MCLEAN AND WOODFORD COUNTIES) | $43.86 | $23.72 | $67.58 Top 10% +46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (PEORIA DIVISION - MARSHALL AND WOODFORD COUNTIES) | $45.65 | $26.77 | $72.42 Top 10% +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK; WORKING INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK FROM BOTTOM TO A HEIGHT OF 48 FEET; FORM STRIPPERS; M | $51.40 | $36.94 | $88.34 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $47.80 | $42.50 | $90.30 Top 10% +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $46.00 | $39.30 | $85.30 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (FORD AND MCLEAN COUNTIES) | $40.40 | $29.65 | $70.05 Top 10% +44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (LA SALLE, MARSHALL, AND PUTNMAN COUNTIES) | $45.50 | $38.90 | $84.40 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (LIVINGSTON, MARSHALL, MCLEAN, AND WOODFORD COUNTIES) | $45.48 | $34.13 | $79.61 Top 10% +64% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1 ALL CLASSIFICATIONS NOT LISTED BELOW | $37.12 | $30.06 | $67.18 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1 UNSKILLED - ALL CLASSIFICATIONS NOT LISTED BELOW | $40.54 | $32.42 | $72.96 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1 UNSKILLED; SEMI-SKILLED - HANDLING OF MATERIALS TREATED WITH OIL, CREOSOTE, ASPHALT AND/OR FORIEGN MATERIAL HARMFUL TO SKIN OR CLOTHIN | $45.08 | $34.34 | $79.42 Top 10% +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER; DYNAMITE MAN | $38.12 | $30.06 | $68.18 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 DYNAMITE MAN; ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER | $46.08 | $34.34 | $80.42 Top 10% +158% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 DYNAMITE MAN; ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; AND LEAD BASE PAINT WORKER | $40.17 | $28.01 | $68.18 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 SEMI-SKILLED - HANDLING OF MATERIALS TREATED WITH OIL, CREOSOTE, ASPHALT AND/OR FORIEGN MATERIAL HARMFUL TO SKIN OR CLOTHING; TRACK LA | $40.54 | $32.42 | $72.96 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 SEWER AND DRAIN PIPELAYERS AND MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE USED ON PUBLIC UTILITY WORK; PUMPCRETE PIPEHANDLERS | $51.75 | $36.94 | $88.69 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3 ASPHALT RAKERS; HOD CARRIERS; PLASTERER LABORERS; GUNNITE LABORERS, SLAB FOR SETTERS ON ROADS, HIGHWAYS, STREETS, AIRPORTS RUNAWAYS, A | $51.48 | $36.94 | $88.42 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3 SKILLED - MASON TENDERS; CAISSON WORKERS PLUS DEPTH; GUNNITE NOZZLE MEN; LEAD MAN ON SEWER WORK; WELDERS, CUTTERS, BURNERS & TORCHMEN | $40.54 | $32.42 | $72.96 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 4 DYNAMITE MAN | $41.54 | $32.42 | $73.96 Top 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 5 GUNNITE NOZZLE MEN; CAISSON LABORERS AND ALL TAMPING HAMMERS FROM 150 LBS AND OVER; FROM 15 FEET BELOW GROUND LEVEL DOWN TO 50 FEET | $51.60 | $36.94 | $88.54 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 6 ALL UNDERGROUND CAVERN LABORERS; CAISSON LABORERS 50 FEET OR MORE BELOW GROUND LEVEL; LABORERS WORKING UNDER RADIO ACTIVE CONDITIONS | $51.75 | $36.94 | $88.69 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 7 DOSIMETER USED FOR MONITORING NUCLEAR EXPOSURE; ASBESTOS ABATEMENT WORKER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER | $51.60 | $36.94 | $88.54 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER5 | $42.54 | $32.42 | $74.96 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN | $48.44 | $29.09 | $77.53 Top 10% +52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN/EQUIPMENT OPERATOR | $55.13 | $25.17 | $80.30 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER | $41.82 | $20.84 | $62.66 Top 10% +23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: LINEMAN AND EQUIPMENT OPERATOR | $62.10 | $37.29 | $99.39 Top 10% +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: LINEMAN AND SUBSTATION TECHNICIAN | $61.36 | $27.19 | $88.55 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 1 ASPHALT PLANT*; ASPHALT HEATER AND PLANER COMBINATION; ASPHALT HEATER SCARFIRE*; ASPHALT SPREADER; AUTOGRADER; ABG | $63.00 | $51.00 | $114.00 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 1 POWER CRANES, DRAGLINES, DERRICKS, SHOVELS, GRADALLS, MECHANICS, TRACTOR HIGHLIFT, TOURNADOZER, CONCRETE MIXERS WIT | $45.15 | $26.00 | $71.15 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER; CONCRETE MIXER, TWO BAG AN | $60.40 | $51.00 | $111.40 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 5 BOBCATS; BRICK FORKLIFTS; DIRECTIONAL BORING MACHINE LOCATOR; OILERS (GRUNDY, KANKAKEE, LA SALLE, LIVINGSTON, AND P | $57.80 | $51.00 | $108.80 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $53.05 | $33.91 | $86.96 Top 10% +190% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY, AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES | $40.00 | $26.90 | $66.90 Top 10% +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, SPRAY, PRESSURE ROLLER, SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK | $40.00 | $26.90 | $66.90 Top 10% +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMAN | $37.06 | $31.16 | $68.22 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TON - OVER 50-TON CAPACITY. - OPERATING ENGINEERS WHO OPERATE LATTICE BOOM CRAWLER CRANES, LATTICE BOOM TRUCK CRANES, TELESCOPIC BOOM CRANES LESS THAN | $38.03 | $43.42 | $81.45 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TON - OVER 50-TON CAPACITY. - OPERATING ENGINEERS WHO OPERATE LATTICE BOOM CRAWLER CRANES, LATTICE BOOM TRUCK CRANES, TELESCOPIC BOOM CRANES LESS THAN | $44.09 | $43.42 | $87.51 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TON - OVER 50-TON CAPACITY. - OPERATING ENGINEERS WHO OPERATE LATTICE BOOM CRAWLER CRANES, LATTICE BOOM TRUCK CRANES, TELESCOPIC BOOM CRANES LESS THAN | $47.79 | $43.42 | $91.21 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL DEVICE MONITOR: TRAFFIC SAFETY WORKER: PRIMARY DUTIES INCLUDE BUT ARE NOT LIMITED TO THE DELIVERY, MAINTENANCE AND PICK-UP OF TRAFFIC | $43.40 | $22.71 | $66.11 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, 2 OR 3 AXLE TRUCKS (FORD, GRUNDY, LIVINGSTON, MCLEAN (NORTH OF A STRAIGHT LINE STARTIN | $44.82 | $0.25 | $45.07 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, 4 AXLE TRUCKS (FORD, GRUNDY, LIVINGSTON, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT | $44.97 | $0.25 | $45.22 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, 5 AXLE TRUCKS (FORD, GRUNDY, LIVINGSTON, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT | $45.17 | $0.25 | $45.42 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, 6 AXLE TRUCKS (FORD, GRUNDY, LIVINGSTON, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT | $45.37 | $0.25 | $45.62 Top 10% +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UN | $45.35 | $25.72 | $71.07 Top 10% +147% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 1- DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE U | $45.29 | $25.42 | $70.71 Top 10% +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 2 | $45.93 | $25.72 | $71.65 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 2 (FORD, IROQUOIS,MCLEAN COUNTIES) | $45.88 | $25.42 | $71.30 Top 10% +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 2 (LASALLE, LIVINGSTON, PUTNAM COUNTIES) | $45.88 | $25.42 | $71.30 Top 10% +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 3 | $46.25 | $25.72 | $71.97 Top 10% +150% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 3 (FORD, IROQUOIS,MCLEAN COUNTIES) | $46.15 | $25.42 | $71.57 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS | $46.60 | $25.72 | $72.32 Top 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 4- LOW BOY AND OIL DISTRIBUTORS. (FORD, IROQUOIS,MCLEAN COUNTIES) | $46.54 | $25.42 | $71.96 Top 10% +150% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK | $47.71 | $25.72 | $73.43 Top 10% +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 5- DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (FORD, IROQUOIS,MCLEAN COUNTIES) | $47.64 | $25.42 | $73.06 Top 10% +154% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 5- DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (LASALLE, LIVINGSTON, PUTNAM COUNTIES) | $46.15 | $25.42 | $71.57 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 2 OR 3 AXLES (KANKAKEE AND IROQUOIS COUNTIES) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER WE | $44.82 | $0.25 | $45.07 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 4 AXLES (KANKAKEE AND IROQUOIS COUNTIES) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER WEEK AN | $44.97 | $0.25 | $45.22 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 5 AXLES (KANKAKEE AND IROQUOIS COUNTIES) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER WEEK AN | $45.17 | $0.25 | $45.42 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 6 AXLES (KANKAKEE AND IROQUOIS COUNTIES) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER WEEK AN | $45.37 | $0.25 | $45.62 Top 10% +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| UNDER, ROLLERS ON AGGREGATE AND SEAL COAT SURFACES, FORK LIFTS (WHEN USED FOR LANDSCAPING WORK, CONCRETE AND BLACKTOP CURB MACHINE, FARM TRACTOR WITH | $30.05 | $26.00 | $56.05 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Iroquois, IL — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Iroquois
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Iroquois, Illinois.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.