Highway Construction — Effingham, Illinois
WD IL20260016-15742-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BLACK TOP PLANT OILER INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK in Effingham, Illinois (construction type: highway) is $43.45/hr base + $34.95/hr fringe = $78.40/hr total package (WD IL20260016-15742-hwy, Rev. 1).
Scroll down for all 96 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BLACK TOP PLANT OILER INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK | $43.45 | $34.95 | $78.40 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $33.54 | $27.97 | $61.51 Above median +67% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $39.02 | $18.90 | $57.92 Above median +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $41.36 | $18.90 | $60.26 Above median +64% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER DIVERS | $39.02 | $18.90 | $57.92 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER DIVERS | $38.52 | $18.90 | $57.42 Bottom 10% +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $29.11 | $16.09 | $45.20 Above median +21% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $29.22 | $16.31 | $45.53 Above median +22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRIVER OPERATOR, PULLS & SCRAPERS, POWER PAC & CONTROLS, PUG MILL, PULVERIZER OR TILLERS, PUSH CATS, QUAD TRAC, ROTOMILLS, ROTATING CAB FORKLIFTS, RUB | $40.13 | $32.00 | $72.13 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICAL LOW VOLTAGE WIRING INSTALLER, BUILDING (ALEXANDER, BOND, CLAY, CLINTON, EDWARDS, EFFINGHAM, FAYETTE, FRANKLIN, GALLATIN, HAMILTON, HARDIN | $38.44 | $19.37 | $57.81 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $46.14 | $21.67 | $67.81 Above median +46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $45.00 | $26.70 | $71.70 Above median +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (ALEXANDER, CLAY, EDWARDS, EFFINGHAM, FAYETTE, FRANKLIN, GALLATIN, HAMILTON, HARDIN, JACKSON, JEFFERSON, JOHNSON, MARION, MASSAC, PERRY, P | $52.14 | $29.14 | $81.28 Top 10% +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (EFFINGHAM, AND FAYETTE COUNTIES) | $41.00 | $20.68 | $61.68 Top 10% +33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (RANDOLPH COUNTY) | $52.41 | $30.27 | $82.68 Top 10% +78% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (ALEXANDER, FRANKLIN, GALLATIN, HARDIN, JACKSON, JOHNSON, MASSAC, PERRY, POPE, PULASKI, SALINE, UNION, AND WILLIAMSON COUNTIES) | $37.66 | $32.10 | $69.76 Top 10% +44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (CLAY, CRAWFORD, EFFINGHAM COUNTY, JASPER, LAWRENCE, AND RICHLAND COUNTIES) | $38.00 | $26.39 | $64.39 Top 10% +33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (CLAY, EDWARDS, FRANKLIN, GALLATIN, HAMILTON, JEFFERSON, LAWRENCE, MARION, RICHLAND, SALINE, WABASH, WAYNE, AND WHITE COUNTIES) | $35.34 | $26.40 | $61.74 Top 10% +27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (EFFINGHAM AND FAYETTE COUNTIES) | $37.60 | $32.94 | $70.54 Top 10% +45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (FAYETTE, JACKSON, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES) | $41.65 | $31.18 | $72.83 Top 10% +50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $32.75 | $27.64 | $60.39 Above median +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER | $34.64 | $30.59 | $65.23 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GROUP 3 DYNAMITE MAN | $35.64 | $30.59 | $66.23 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: CABLE SPLICER; LINEMAN WELDER (RANDOLPH COUNTY) | $63.79 | $26.89 | $90.68 Top 10% +78% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN (RANDOLPH COUNTY) | $42.10 | $18.84 | $60.94 Top 10% +20% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN - CLASS A (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER | $38.18 | $19.92 | $58.10 Top 10% +14% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR CLASS II (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARD | $46.49 | $22.33 | $68.82 Top 10% +35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN EQUIPMENT OPERATOR (RANDOLPH COUNTY) | $56.38 | $25.23 | $81.61 Top 10% +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (RANDOLPH COUNTY) | $46.03 | $20.60 | $66.63 Top 10% +31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN/EQUIPMENT OPERATOR (FAYETTE COUNTY) | $52.63 | $24.35 | $76.98 Top 10% +51% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER (FAYETTE COUNTY) | $39.92 | $20.22 | $60.14 Top 10% +18% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: HEAVY - EQUIPMENT OPERATOR CLASS I (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARDIN, J | $52.13 | $23.97 | $76.10 Top 10% +49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: LINEMAN (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON | $65.52 | $27.85 | $93.37 Top 10% +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: LINEMAN (RANDOLPH COUNTY) | $64.83 | $29.01 | $93.84 Top 10% +84% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: LINEMAN AND SUBSTATION TECHNICIAN (FAYETTE COUNTY) | $58.58 | $26.29 | $84.87 Top 10% +67% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, CLASS B: OILERS CLASSIFIED AS ASSISTANT OPERATORS, AIR TRACK DRILL/COMPRESSOR, ALL MACHINES USED TO SWEEP, CLEAN, BROOM OR | $38.23 | $32.00 | $70.23 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: RIVER Class 1: All Off Road Material Hauling Equipment, All Terrain Crane, All Power Boat Operators, Articulated Dump, Asph | $40.23 | $32.00 | $72.23 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: RIVER Class 2: Assistant Operators required on All terrain cherry picker w/over 40 ton lifting capacity, Crane, Deckhand on | $36.78 | $32.00 | $68.78 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BLASTING, SPRAYING & PRESSURE WASHING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM BRUSH & ROLLER WORK OVER 30FT ABOVE GROUND OR FLOOR | $28.30 | $20.07 | $48.37 Bottom 10% +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRIDGE EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $32.45 | $17.12 | $49.57 Top 10% +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRIDGES & DAMS - BLAST & SPRAY SPRAY, SANDBLASTING AND WATER BLAST UNITS WITH 3500 PSI RECEIVE A $.50 PER HOUR PREMIMUM. ALL WORK FORTY FEET | $31.00 | $15.40 | $46.40 Top 10% +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRIDGES & DAMS - BRUSH & ROLL SPRAY, SANDBLASTING AND WATER BLAST UNITS WITH 3500 PSI RECEIVE A $.50 PER HOUR PREMIMUM. ALL WORK FORTY FEET A | $30.00 | $15.40 | $45.40 Top 10% +51% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRIDGES, DAMS | $35.51 | $18.78 | $54.29 Top 10% +81% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH & ROLLER AND WALL COVERING DRYWALL PREPARING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM BRUSH & ROLLER WORK OVER 30FT ABOVE GR | $27.30 | $20.07 | $47.37 Bottom 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND PAPERHANGER FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50 HOUR ABOVE BA | $27.60 | $17.63 | $45.23 Top 10% +51% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: INDUSTRIAL - BLAST & SPRAY SPRAY, SANDBLASTING AND WATER BLAST UNITS WITH 3500 PSI RECEIVE A $.50 PER HOUR PREMIMUM. ALL WORK FORTY FEET AND | $26.25 | $15.40 | $41.65 Top 10% +39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: INDUSTRIAL - BRUSH & ROLL SPRAY, SANDBLASTING AND WATER BLAST UNITS WITH 3500 PSI RECEIVE A $.50 PER HOUR PREMIMUM. ALL WORK FORTY FEET AND A | $25.25 | $15.40 | $40.65 Top 10% +36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: JOURNEYMAN | $33.21 | $18.78 | $51.99 Top 10% +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMAN | $33.54 | $27.97 | $61.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 03 AIR COMPRESSORS, WATER PUMPS, REGARDLESS OF SIZE, WATER-BLASTERS, WELDING MACHINE, MIXERS, CONVEYOR, SIPHON OR JET | $41.59 | $39.10 | $80.69 Top 10% +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC | $49.20 | $39.10 | $88.30 +89% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND R | $44.45 | $34.95 | $79.40 Top 10% +70% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT | $50.20 | $39.10 | $89.30 +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING A | $45.45 | $34.95 | $80.40 Top 10% +72% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT | $47.20 | $39.10 | $86.30 +85% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES | $46.07 | $39.10 | $85.17 Top 10% +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING | $41.32 | $34.95 | $76.27 Top 10% +64% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON O | $36.84 | $34.95 | $71.79 Bottom 10% +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 04 FIREMAN ON WHIRLIES AND HEAVY EQUIPMENT OILERS, TRUCK CRANES, DREDGES, MONIGANS, LARGE CRANES - CONCRETE PLANT OILE | $41.65 | $39.10 | $80.75 Top 10% +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 05 OILERS FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES | $41.65 | $39.10 | $80.75 Top 10% +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 05 OILERS INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WOR | $44.45 | $34.95 | $79.40 Top 10% +70% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT | $49.75 | $39.10 | $88.85 Above median +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT INCLUDING BUILDING CONSTRU | $45.00 | $34.95 | $79.95 Top 10% +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 07 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 150 FT AND OVER, BUT LESS THAN 200 FT INCLUDING BUILDING CONSTRU | $45.30 | $34.95 | $80.25 Top 10% +72% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 08 OPERATORS ON EQUIPMENT WITH BOOMNS, INCLUDING JIBS, 200 FT AND OVER; TOWER CRANES, AND WHIRLEY CRANES INCLUDING BUI | $45.60 | $34.95 | $80.55 Top 10% +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER | $48.20 | $39.10 | $87.30 Top 10% +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER. INCLUDING BU | $46.25 | $34.95 | $81.20 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1 POWER CRANES, DRAGLINES, DERRICKS, SHOVELS, GRADALLS, MECHANICS, TRACTOR HIGHLIFT, TOURNADOZER, CONCRETE MIXERS WITH | $45.15 | $26.00 | $71.15 Top 10% +53% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 10: Certified crane Operators 17.5 tons and above, when requested by the Contractor or required by the Owner | $46.75 | $34.95 | $81.70 Top 10% +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 7: Operators on equipment with Booms, including Jibs, 150 ft and over, but less than 200 ft | $45.30 | $34.95 | $80.25 Top 10% +72% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 8: Operators on equipment with Boomns, including Jibs, 200 ft and over; Tower Cranes, and Whirley Cranes | $45.60 | $34.95 | $80.55 Top 10% +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORGROUP 1: Cranes, Draglines, Shovels, Skimmer Scoops, Clamshells or Derrick Boats, Pile Drivers, Crane-Type Backhoes, Asphalt P | $42.45 | $34.95 | $77.40 Top 10% +66% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE..$ 29.60 17.63 PAINTER: DRYWALL FINISHERS AND PLASTERERS FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.7 | $27.85 | $17.63 | $45.48 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| STRUCTURES OVER 75FT? $1.50 HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $28.60 | $17.63 | $46.23 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| THE CONTRACTOR OR REQUIRED BY THE OWNER INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK | $46.75 | $34.95 | $81.70 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRACT JACK, POWER BROOM, SELF-PROPELLED FROM TAMPER, TRAC-AIR, MIXERS - LESS THAN 21 CU.FT., MORTAR MIXER W/SKI OR PUMP, MUD JACKS, ONE WELL POINT PUM | $30.83 | $32.00 | $62.83 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 1: DRIVERS ON 2 AXLE TRUCKSHAULING LESS THAN 9 TON; AIR COMPRESSOR AND WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPA | $38.55 | $16.11 | $54.66 Top 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 1: DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE U | $45.35 | $25.72 | $71.07 Top 10% +147% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 1: DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE U | $43.28 | $27.56 | $70.84 Above median +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 2: 2 OR 3 AXLE TRUCKS HAULING MORE THAN 9 TON BUT HAULING LESS THAN 16 TON; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS | $38.97 | $16.11 | $55.08 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks; Vactor Trucks or s | $45.88 | $25.42 | $71.30 +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks; Vactor Trucks or s | $45.93 | $25.72 | $71.65 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks; Vactor Trucks or s | $43.86 | $27.56 | $71.42 Above median +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; me | $46.15 | $25.42 | $71.57 +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; me | $46.25 | $25.72 | $71.97 Top 10% +150% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; me | $44.15 | $27.56 | $71.71 Above median +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 3: 2, 3, or 4 axle trucks hauling 16 ton or more; Drivers on water pulls; Articulated Dump Trucks; Mechanics and working foreperso | $39.18 | $16.11 | $55.29 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS | $46.54 | $25.42 | $71.96 Bottom 10% +150% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS | $46.60 | $25.72 | $72.32 Top 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS | $44.53 | $27.56 | $72.09 Above median +151% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 4: LOW BOY; OIL DISTRIBUTORS FOOTNOTE: A. $46.20 PER DAY | $39.44 | $16.11 | $55.55 Top 10% +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK | $47.64 | $25.42 | $73.06 Bottom 10% +154% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK | $47.71 | $25.72 | $73.43 Top 10% +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK | $45.61 | $27.56 | $73.17 Above median +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. FOOTNOTE: A. $46.20 PER DAY | $39.44 | $16.11 | $55.55 Top 10% +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| UNDER, ROLLERS ON AGGREGATE AND SEAL COAT SURFACES, FORK LIFTS (WHEN USED FOR LANDSCAPING WORK, CONCRETE AND BLACKTOP CURB MACHINE, FARM TRACTOR WITH | $30.05 | $26.00 | $56.05 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Effingham, IL — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Effingham
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Effingham, Illinois.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.