Building Construction — Du Page, Illinois
WD IL20260008-16712-bld · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ASBESTOS WORKER/INSULATOR in Du Page, Illinois (construction type: building) is $55.02/hr base + $35.75/hr fringe = $90.77/hr total package (WD IL20260008-16712-bld, Rev. 2).
Scroll down for all 112 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/INSULATOR | $55.02 | $35.75 | $90.77 Top 10% +279% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $53.10 | $38.54 | $91.64 Top 10% +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $48.56 | $34.05 | $82.61 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $44.88 | $26.62 | $71.50 Above median +72% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $45.61 | $35.31 | $80.92 Top 10% +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, CARPENTER, MILLWRIGHT, PILEDRIVER, AND SOFT FLOOR LAYER | $45.61 | $35.31 | $80.92 Top 10% +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: BUILDING | $52.01 | $38.85 | $90.86 Top 10% +147% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: CARPENTER, FLOOR LAYER, LATHER, MILLWRIGHT, AND PILEDRIVER | $52.01 | $38.86 | $90.87 Top 10% +147% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: HEAVY & HIGHWAY | $52.01 | $38.85 | $90.86 Above median +147% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER; MILLWRIGHT; PILEDRIVERMEN | $52.01 | $41.41 | $93.42 Top 10% +154% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $50.70 | $40.60 | $91.30 Top 10% +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $46.25 | $45.10 | $91.35 Top 10% +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $48.50 | $42.82 | $91.32 Top 10% +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $38.00 | $24.03 | $62.03 Above median +67% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: BUILDING | $51.87 | $51.77 | $103.64 Top 10% +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: BUILDING | $52.00 | $45.01 | $97.01 Bottom 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: BUILDING (KANE AND KENDALL COUNTIES) | $60.17 | $43.50 | $103.67 Top 10% +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: BUILDING (KANE AND MCHENRY COUNTIES) | $59.11 | $42.23 | $101.34 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: ELECTRICAL TECHNICIAN: WORK INCLUDES THE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES, TELEPHONE, SECURITY, FIRE | $48.71 | $35.87 | $84.58 +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: ELECTRICAL TECHNICIAN: WORK INCLUDES THE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES, TELEPHONE, SECURITY, FIRE | $48.00 | $39.85 | $87.85 Above median +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: ELECTRICAL TECHNICIAN: WORK INCLUDES THE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES, TELEPHONE, SECURITY, FIRE | $44.00 | $37.91 | $81.91 Bottom 10% +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: ELECTRICAL TECHNICIAN: WORK INCLUDES THE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES, TELEPHONE, SECURITY, FIRE | $49.70 | $38.45 | $88.15 Top 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: ELECTRICAL TECHNICIAN: WORK INCLUDES THE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES, TELEPHONE, SECURITY, FIRE | $40.90 | $44.32 | $85.22 Above median +84% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: RESIDENTIAL | $39.60 | $32.25 | $71.85 Top 10% +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: RESIDENTIAL (KANE AND MCHENRY COUNTIES) | $44.40 | $34.59 | $78.99 Top 10% +70% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC FOOTNOTES: A) PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING DAY | $70.68 | $38.44 | $109.12 Top 10% +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC FOOTNOTES: A. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SE | $57.99 | $38.44 | $96.43 Top 10% +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC MCHENRY COUNTY) FOOTNOTES: A. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE TH | $61.96 | $38.44 | $100.40 Top 10% +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FIRE STOP TECHNICIAN | $44.02 | $32.76 | $76.78 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $51.55 | $44.09 | $95.64 Top 10% +232% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER | $41.27 | $32.76 | $74.03 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK; WORKING INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK FROM BOTTOM TO A HEIGHT OF 48 FEET; FORM STRIPPERS; M | $47.40 | $33.16 | $80.56 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (DUPAGE, GRUNDY, KENDALL, AND WILL COUNTIES) | $47.80 | $42.50 | $90.30 Top 10% +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (DUPAGE, KANE, KENDALL, AND MCHENRY COUNTIES) | $48.83 | $39.84 | $88.67 Top 10% +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (MCHENRY COUNTY) | $41.37 | $44.41 | $85.78 Top 10% +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, ORNAMENTAL (LAKE, DUPAGE AND MCHENRY COUNTIES) | $59.26 | $44.81 | $104.07 Top 10% +114% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: FENCE ERECTOR (LAKE, DUPAGE, AND MCHENRY COUNTIES) | $52.25 | $34.31 | $86.56 Top 10% +78% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: MACHINERY MOVERS; RIGGERS; MACHINERY ERECTORS (LAKE, DUPAGE AND MCHENRY COUNTIES) | $54.25 | $47.38 | $101.63 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: MASTER RIGGERS (LAKE, DUPAGE AND MCHENRY COUNTIES) | $56.75 | $47.38 | $104.13 Top 10% +114% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: SHEETER (DU PAGE, LAKE, AND MCHENRY COUNTIES) | $62.71 | $46.58 | $109.29 Top 10% +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: STRUCTURAL AND REINFORCING (DU PAGE, LAKE, AND MCHENRY COUNTIES) | $62.46 | $46.58 | $109.04 Top 10% +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1 BUILDING LABORERS, PLASTERER TENDERS, PUMPS FOR DEWATERING & OTHER UNCLASSIFIED LABORERS | $51.40 | $36.94 | $88.34 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1 BUILDING LABORERS; PLASTERER TENDERS, GENERAL LABORERS; FIREPROOFING AND FIRE SHOP LABORERS | $51.40 | $36.94 | $88.34 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 10 BOILER SETTER PLASTIC LABORERS | $51.85 | $36.94 | $88.79 Bottom 10% +185% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 10 BOILER SETTER PLASTIC LABORERS | $51.95 | $36.94 | $88.89 Top 10% +185% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 11 DOSIMETER MONITORING NUCLEAR EXPOSURE; ASBESTOS ABATEMENT LABORERS; TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS | $51.60 | $36.94 | $88.54 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 11 JACKHAMMERMEN ON FIRE BRICK WORK ONLY | $51.68 | $36.94 | $88.62 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 12 DOSIMETER MONITORING NUCLEAR EXPOSURE); ASBESTOS ABATEMENT LABORERS; TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS | $52.40 | $36.94 | $89.34 Top 10% +186% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 CEMENT GUN LABORERS AND HOSE | $51.48 | $36.94 | $88.42 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 FIREPROOFING AND FIRE SHOP LABORERS | $51.40 | $36.94 | $88.34 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 SEWER AND DRAIN PIPE LAYERS AND MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE USED, ON PUBLIC UTILITY WORK; PUMPCRETE PIPE HANDLERS | $47.40 | $33.16 | $80.56 Bottom 10% +158% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3 ASPHALT RAKERS; HOD CARRIERS; PLASTERER LABORERS; GUNNITE LABORERS, SLAB FOR SETTERS ON ROADS, HIGHWAYS, STREETS, AIRPORT RUNAWAYS, AN | $47.48 | $33.16 | $80.64 Bottom 10% +158% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3 CEMENT GUN LABORERS AND HOSE | $51.48 | $36.94 | $88.42 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3 CHIMNEY OVER 40 FEET; SCAFFOLD LABORERS; WALL MEN OR WRECKERS | $51.50 | $36.94 | $88.44 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 4 CEMENT GUN NOZZLE LABORERS | $51.60 | $36.94 | $88.54 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 4 CHIMNEY OVER 40 FEET; SCAFFOLD LABORERS; WELDMAN-WRECKERS BURNERS | $51.50 | $36.94 | $88.44 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 5 CEMENT GUN NOZZLE LABORERS; WINDLASS AND CAPSTAN PERSON | $51.55 | $36.94 | $88.49 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 5 GUNNITE NOZZLE MEN; CAISSON LABORERS AND ALL TAMPING HAMMERS FROM 150 LBS AND OVER; FROM 15 FEET BELOW GROUND LEVEL DOWN TO 50 FEET; A | $47.60 | $33.16 | $80.76 Top 10% +159% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 5 JACKHAMMER & AIRSPADE; CHAINSAW, SWINGING STAGE AND BOATSWAIN CHAIR; CEMENT GUN NOZZLEMAN; HOD CARRIER; PLASTERER TENDER, AND TUNNEL M | $51.65 | $36.94 | $88.59 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 5 STONE DERRICKMEN AND HANDLERS | $51.60 | $36.94 | $88.54 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 6 ALL UNDERGROUND CAVERN LABORERS; CAISSON LABORERS 50 FEET OR MORE BELOW GROUND LEVEL; LABORERS WORKING UNDER RADIO ACTIVE CONDITIONS | $47.75 | $33.16 | $80.91 Bottom 10% +159% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 6 JACKHAMMERMEN; POWER DRIVEN CONCRETE SAWS | $51.63 | $36.94 | $88.57 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 6 STONE DERRICKMEN AND HANDLERS | $51.60 | $36.94 | $88.54 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 6 TILE LAYERS; BOTTOM MEN KANE, KENDALL, AND MCHENRY COUNTIES | $52.10 | $36.94 | $89.04 Top 10% +185% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 7 CAISSON LABORERS; DYNAMITERS KANE, KENDALL, AND MCHENRY COUNTIES | $52.10 | $36.94 | $89.04 Top 10% +185% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 7 DOSIMETER USED FOR MONITORING NUCLEAR EXPOSURE; ASBESTOS ABATEMENT WORKER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER; AND CHIMNEY AND | $47.60 | $33.16 | $80.76 Bottom 10% +159% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 7 FIREBRICK & BOILER LABORER SETTERS | $51.73 | $36.94 | $88.67 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 7 JACKHAMMERMEN, POWER DRIVEN CONCRETE SAWS AND OTHER POWER EQUIPMENT | $51.63 | $36.94 | $88.57 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 8 ASBESTOS ABATEMENT LABORERS, TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS, DOSIMETER MONITORING NUCLEAR EXPOSUREANE KENDALL, AND MCHENRY | $51.80 | $36.94 | $88.74 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 8 CHIMNEY LABORERS; CAISSON DIGGERS; WELL POINT SYSTEM MEN | $51.75 | $36.94 | $88.69 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 8 FIREBRICK & BOILER LABORERS | $51.73 | $36.94 | $88.67 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 9 CHIMNEY ON FIRE BRICK; CAISSON DIGGERS; WELL POINT SYSTEM MEN | $51.75 | $36.94 | $88.69 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 9 WINDLASS AND CAPSTAN PERSONS | $51.60 | $36.94 | $88.54 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GROUP 1 COMMON LABORER KANE, KENDALL, AND MCHENRY COUNTIES | $51.40 | $36.94 | $88.34 Top 10% +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GROUP 2 POWER VIBRATOR KANE, KENDALL, AND MCHENRY COUNTIES | $51.65 | $36.94 | $88.59 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN | $48.44 | $29.09 | $77.53 Top 10% +52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: LINEMAN AND EQUIPMENT OPERATOR | $62.10 | $37.29 | $99.39 Top 10% +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE FINISHER | $33.95 | $26.03 | $59.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE SETTER | $47.71 | $33.20 | $80.91 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 1 MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*:BATCH PLANT*; BENOTO; BOI | $64.80 | $51.00 | $115.80 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 2 BOBCAT; BOILERS; BRICK FORKLIFT; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER; CONVEYOR, PORTABLE; FORKLIFT T | $63.50 | $51.00 | $114.50 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 4 BOBCATS AND/OR OTHER SKID STEER LOADERS; BRICK FORKLIFTS; OILERS | $59.20 | $51.00 | $110.20 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.09 | $13.40 | $58.49 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.89 | $13.40 | $58.29 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.69 | $13.40 | $58.09 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.54 | $13.40 | $57.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, DECORATOR, AND PAPERHANGER | $53.05 | $33.91 | $86.96 Top 10% +190% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, DRYWALL TAPER/FINISHER, SANDBLASTER, AND SPRAY | $53.05 | $27.63 | $80.68 Top 10% +169% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER (DUPAGE, GRUNDY, LAKE, MCHENRY & WILL COUNTIES) | $55.00 | $38.62 | $93.62 Top 10% +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $42.25 | $26.65 | $68.90 Above median +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $49.65 | $42.17 | $91.82 Top 10% +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $45.76 | $26.92 | $72.68 Above median +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER (DUPAGE, KANE, AND KENDALL COUNTIES) | $41.20 | $29.15 | $70.35 Top 10% +52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PUMPS, WELL POINTS; WELDING MACHINES; WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; BOBCAT | $60.95 | $51.00 | $111.95 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $50.25 | $30.43 | $80.68 Top 10% +151% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $38.50 | $27.23 | $65.73 Above median +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $49.10 | $42.91 | $92.01 Top 10% +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $56.35 | $38.65 | $95.00 Top 10% +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: ALUMINUM GUTTER WORK | $31.32 | $37.02 | $68.34 Top 10% +52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $63.25 | $36.50 | $99.75 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER/SETTER | $48.38 | $30.79 | $79.17 Above median +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $42.80 | $26.97 | $69.77 Top 10% +172% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $49.75 | $30.79 | $80.54 Top 10% +214% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 2 OR 3 AXLE TRUCKS FOOTNOTES: A. $448.80 HEALTH & WELFARE PER WEEK, $562.80 PENSION PER WEEK. B. LOWBOY IS AN ADDITIONAL $1.50 PER HOUR | $46.12 | $0.30 | $46.42 Top 10% +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 2-3 AXLES FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX AXLES. LOW-BOY IS AN ADDITIONAL $1 | $45.31 | $0.30 | $45.61 Top 10% +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 4 AXLE TRUCKS FOOTNOTES: A. $448.80 HEALTH & WELFARE PER WEEK, $562.80 PENSION PER WEEK. B. LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN AD | $46.27 | $0.30 | $46.57 Top 10% +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 4 AXLES FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX AXLES. LOW-BOY IS AN ADDITIONAL $1.50 | $45.46 | $0.30 | $45.76 Top 10% +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 5 AXLE TRUCKS FOOTNOTES: A. $448.80 HEALTH & WELFARE PER WEEK, $562.80 PENSION PER WEEK. B. LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN AD | $46.47 | $0.30 | $46.77 Top 10% +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 5 AXLES FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX AXLES. LOW-BOY IS AN ADDITIONAL $1.50 | $45.66 | $0.30 | $45.96 Top 10% +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 6 AXLE TRUCKS FOOTNOTES: A. $448.80 HEALTH & WELFARE PER WEEK, $562.80 PENSION PER WEEK. B. LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN AD | $46.67 | $0.30 | $46.97 Top 10% +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 6 AXLES FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX AXLES. LOW-BOY IS AN ADDITIONAL $1.50 | $45.86 | $0.30 | $46.16 Top 10% +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| VIBRATORS-ANY TYPE-8 FEET OR MORE BELOW GROUND LEVEL | $47.60 | $33.16 | $80.76 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Du Page, IL — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Du Page
Compliance Notes
- This wage determination applies to federal contracts for building construction in Du Page, Illinois.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.