Highway Construction — Clinton, Illinois

WD IL20260017-15741-hwy · Revision 4 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BLACK TOP PLANT OILER in Clinton, Illinois (construction type: highway) is $43.45/hr base + $34.95/hr fringe = $78.40/hr total package (WD IL20260017-15741-hwy, Rev. 4).

Scroll down for all 127 trade classifications covered by this determination.

WD Number: IL20260017-15741-hwy
Revision: 4
Construction Type: highway
State: Illinois (IL)
County: Clinton
Effective: May 17, 2026
Trades covered: 127
Official source: SAM.gov reference IL20260017View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BLACK TOP PLANT OILER $43.45 $34.95 $78.40 Bottom 10% $0.00 $0.00 $0.00 $0.00
CARPENTER $35.05 $28.57 $63.62 Above median +73% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $41.36 $18.90 $60.26 Above median +64% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER & PILEDRIVERMEN $41.36 $18.90 $60.26 Top 10% +64% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER AND PILEDRIVER $41.36 $18.90 $60.26 Above median +64% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER:MACOUPIN and MONTGOMERY COUNTIES $32.15 $25.97 $58.12 Top 10% +58% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $39.00 $30.60 $69.60 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MADISON, MONROE, MONTGOMERY, AND ST. CLAIR COUNTIES) $39.00 $30.60 $69.60 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (BOND, CLINTON, AND WASHINGTON COUNTIES) $52.14 $29.14 $81.28 Top 10% +75% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (BOND, CLINTON, MACOUPIN, MADISON, MONROE, MONTGOMERY, ST. CLAIR AND WASHINGTON COUNTIES) $52.41 $30.27 $82.68 Top 10% +78% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (CALHOUN, GREEN, JERSEY, MACOUPIN, AND MADISON COUNTIES) $54.53 $29.46 $83.99 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (MACOUPIN, AND MONTGOMERY COUNTIES) $39.80 $23.08 $62.88 Top 10% +36% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (MONTGGOMERY COUNTY) $41.00 $20.68 $61.68 Top 10% +33% vs market $0.00 $0.00 $0.00 $0.00
HOD CARRIER (ST. CLAIR COUNTY) $34.14 $30.59 $64.73 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $44.27 $31.65 $75.92 Above median +56% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MADISON, MONROE, MONTGOMERY, ST. CLAIR, AND WASHINGTON COUNTIES) $41.65 $31.18 $72.83 Top 10% +50% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (GREENE, MACOUPIN, AND MONTGOMERY COUNTIES) $37.60 $32.94 $70.54 Top 10% +45% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 GENERAL LABORER (MADISON COUNTY) $32.35 $32.38 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 GENERAL LABORERS. (CALHOUN COUNTY) $32.84 $27.89 $60.73 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 GENERAL LABORERS. (GREENE COUNTY) $32.84 $27.89 $60.73 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 GENERAL LABORERS. (JERSEY COUNTY) $32.84 $27.89 $60.73 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 GENERAL LABORERS. (MADISON COUNTY) $32.35 $32.38 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 GENERAL LABORERS. (MADISON COUNTY) $35.38 $29.35 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 GENERAL LABORERS. (MADISON COUNTY) $33.58 $27.30 $60.88 Bottom 10% +95% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER; MASON AND PLASTERER TENDER (MADISON COUNTY) $32.85 $32.38 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS. (CALHOUN COUNTY) $33.34 $27.89 $61.23 Top 10% +96% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS. (GREENE COUNTY) $33.34 $27.89 $61.23 Top 10% +96% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS. (JERSEY COUNTY) $33.34 $27.89 $61.23 Top 10% +96% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS. (MADISON COUNTY) $35.88 $29.35 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS; ASBESTOS ABATEMENT WORKER, HAZARDOUS WASTE WORKER (MADISON COUNTY) $32.85 $32.38 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 BRICK MASON AND PLASTERER TENDERS. (MADISON COUNTY) $35.08 $27.30 $62.38 Top 10% +100% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 DYNAMITE AND POWDER MEN. (CALHOUN COUNTY) $34.34 $27.89 $62.23 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 DYNAMITE AND POWDER MEN. (GREENE COUNTY) $34.34 $27.89 $62.23 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 DYNAMITE AND POWDER MEN. (JERSEY COUNTY) $34.34 $27.89 $62.23 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 DYNAMITE AND POWDER MEN. (MADISON COUNTY) $33.85 $32.38 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 DYNAMITE AND POWDER MEN. (MADISON COUNTY) $36.88 $29.35 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 DYNAMITE MAN AND POWDER MAN (MADISON COUNTY) $33.85 $32.38 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 1 :: CALHOUN COUNTY LABORERS CLASSIFICATIONS GROUP 1 - General Laborers. GROUP 2 - Brick Mason and Plasterer Tenders GROUP 3 - Dynamite $32.84 $27.89 $60.73 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 2 :: CALHOUN COUNTY LABORERS CLASSIFICATIONS GROUP 1 - General Laborers. GROUP 2 - Brick Mason and Plasterer Tenders GROUP 3 - Dynamite $33.34 $27.89 $61.23 Top 10% +96% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 2 BRICK MASON AND PLASTERER TENDERS. MADISON COUNTY $34.08 $27.30 $61.38 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 3 :: CALHOUN COUNTY LABORERS CLASSIFICATIONS GROUP 1 - General Laborers. GROUP 2 - Brick Mason and Plasterer Tenders GROUP 3 - Dynamite $34.34 $27.89 $62.23 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER $32.81 $31.92 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER (BOND AND MONTGOMERY COUNTIES) $32.41 $32.32 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER (BOND COUNTY) $29.65 $35.08 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER (BOND, CALHOUN, GREENE, JERSEY, AND MADISON COUNTIES) $32.84 $27.89 $60.73 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER (CLINTON COUNTY) $31.00 $33.73 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER (MADISON COUNTY) $34.14 $30.59 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER (MADISON COUNTY) $33.43 $27.30 $60.73 Bottom 10% +95% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER (MADISON COUNTY) $33.58 $27.30 $60.88 Above median +95% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER (ST CLAIR COUNTY) $35.38 $29.35 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER (ST CLAIR, CLINTON, AND MADISON COUNTIES) $35.38 $29.35 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER (ST. CLAIR COUNTY) $34.14 $30.59 $64.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER $33.31 $31.92 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND AND MONTGOMERY COUNTIES) $32.91 $32.32 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND COUNTY) $30.15 $35.08 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (CLINTON COUNTY) $31.50 $33.73 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MADISON COUNTY) $34.64 $30.59 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MADISON COUNTY) $33.93 $27.30 $61.23 Bottom 10% +96% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MADISON COUNTY) $34.08 $27.30 $61.38 Above median +97% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (ST CLAIR, CLINTON, AND MADISON COUNTIES) $35.88 $29.35 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (ST. CLAIR AND CLINTON COUNTIES).$ 29.76 31.47 LABORERS $29.26 $31.47 $60.73 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (ST. CLAIR COUNTY) $34.64 $30.59 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER, HOD CARRIER (ST CLAIR COUNTY) $35.88 $29.35 $65.23 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND, CALHOUN, GREENE, JERSEY, AND MADISON COUNTIES) $33.34 $27.89 $61.23 Top 10% +96% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE AND POWDER MAN (CLINTON COUNTY) $32.50 $33.73 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN (BOND AND MONTGOMERY COUNTIES) $33.91 $32.32 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN (BOND COUNTY) $31.15 $35.08 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN (MADISON COUNTY) $34.93 $27.30 $62.23 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN (MADISON COUNTY) $35.08 $27.30 $62.38 Top 10% +100% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN (ST CLAIR COUNTY) $36.88 $29.35 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN (ST CLAIR, CLINTON, AND MADISON COUNTIES) $36.88 $29.35 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN (ST. CLAIR AND CLINTON COUNTIES) $30.76 $31.47 $62.23 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN (ST. CLAIR COUNTY) $35.64 $30.59 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN $34.31 $31.92 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN (BOND, CALHOUN, GREENE, JERSEY, AND MADISON COUNTIES) $34.34 $27.89 $62.23 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN (MADISON COUNTY) $35.64 $30.59 $66.23 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN (BOND, CLINTON, GREENE, JERSEY, MACOUPIN, MADISON, MONROE, MONTGOMERY, RANDOLPH, ST. CLAIR, AND WASHINGTON COUNTIES) $42.10 $18.84 $60.94 Top 10% +20% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN (CALHOUN, GREENE, JERSEY, MACOUPIN, AND MADISON COUNTIES)..$ 36.67 22.13 LINE CONSTRUCTION: EQUIPMENT OPERATOR (CALHOUN $57.12 $28.06 $85.18 Top 10% +67% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN (MACOUPIN AND MONTGOMERY COUNTIES) $38.38 $18.82 $57.20 Top 10% +12% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN - CLASS A (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER $38.18 $19.92 $58.10 Top 10% +14% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR (MACOUPIN AND MONTGOMERY COUNTIES) $56.61 $24.20 $80.81 Top 10% +59% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR CLASS II (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARD $46.49 $22.33 $68.82 Top 10% +35% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER (MACOUPIN AND MONTGOMERY COUNTIES) $40.36 $19.41 $59.77 Bottom 10% +17% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER (MACOUPIN AND MONTGOMERY COUNTIES) $42.85 $20.14 $62.99 Top 10% +24% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER W/WINCH (CALHOUN, GREENE, JERSEY, MACOUPIN, AND MADISON COUNTIES) $42.66 $23.87 $66.53 Top 10% +31% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER WO/WINCH (CALHOUN, GREENE, JERSEY, MACOUPIN, AND MADISON COUNTIES) $37.67 $22.42 $60.09 Top 10% +18% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN EQUIPMENT OPERATOR (BOND, CLINTON, GREENE, JERSEY, MACOUPIN, MADISON, MONROE, MONTGOMERY, RANDOLPH, ST. CLAIR, AND WASHIN $56.38 $25.23 $81.61 Top 10% +60% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (BOND, CLINTON, GREENE, JERSEY, MACOUPIN, MADISON, MONROE, MONTGOMERY, RANDOLPH, ST. CLAIR, AND WASHINGTON C $46.03 $20.60 $66.63 Top 10% +31% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: HEAVY - EQUIPMENT OPERATOR CLASS I (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARDIN, J $52.13 $23.97 $76.10 Top 10% +49% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN & SUBSTATION TECH (MACOUPIN AND MONTGOMERY COUNTIES) $62.90 $26.06 $88.96 Top 10% +75% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN (BOND, CLINTON, GREENE, JERSEY, MACOUPIN, MADISON, MONROE, MONTGOMERY, RANDOLPH, ST. CLAIR, AND WASHINGTON COUNTIES) $64.83 $29.01 $93.84 Top 10% +84% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN; AND LINEMAN HOLE BORING MACHINE OPERATOR (CALHOUN, GREENE, JERSEY, MACOUPIN, AND MADISON COUNTIES) $66.70 $30.84 $97.54 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRIDGE EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM $32.45 $17.12 $49.57 Top 10% +65% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $35.05 $28.57 $63.62 Above median $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN:MACOUPIN and MONTGOMERY COUNTIES $33.15 $25.97 $59.12 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC $44.45 $34.95 $79.40 Bottom 10% +70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT $45.45 $34.95 $80.40 Bottom 10% +72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK: GROUP 11 MAST $44.45 $34.95 $79.40 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK: GROUP 12 LICE $45.45 $34.95 $80.40 Top 10% +72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT $42.45 $34.95 $77.40 Bottom 10% +66% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS $41.32 $34.95 $76.27 Bottom 10% +64% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING $41.32 $34.95 $76.27 Top 10% +64% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON O $36.84 $34.95 $71.79 Bottom 10% +54% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSORS, WATER PUMPS, REGARDLESS OF SIZE, WATER-BLASTERS, WELDING MACHINE, MIXERS, CONVEYOR, SIPHON OR JET $36.84 $34.95 $71.79 Top 10% +54% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 04 FIREMAN ON WHIRLIES AND HEAVY EQUIPMENT OILERS, TRUCK CRANES, DREDGES, MONIGANS, LARGE CRANES - CONCRETE PLANT OILE $43.45 $34.95 $78.40 Bottom 10% +68% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 05 OILERS $44.45 $34.95 $79.40 Bottom 10% +70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 05 OILERS INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WOR $44.45 $34.95 $79.40 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT $45.00 $34.95 $79.95 Bottom 10% +71% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT INCLUDING BUILDING CONSTRU $45.00 $34.95 $79.95 Top 10% +71% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 07 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 150 FT AND OVER, BUT LESS THAN 200 FT $45.30 $34.95 $80.25 Top 10% +72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 08 OPERATORS ON EQUIPMENT WITH BOOMNS, INCLUDING JIBS, 200 FT AND OVER; TOWER CRANES, AND WHIRLEY CRANES $45.60 $34.95 $80.55 Top 10% +73% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER $46.25 $34.95 $81.20 Bottom 10% +74% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER INCLUDING BUI $46.25 $34.95 $81.20 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
THE CONTRACTOR OR REQUIRED BY THE OWNER $46.75 $34.95 $81.70 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UN $45.35 $25.72 $71.07 Top 10% +147% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 2 $45.93 $25.72 $71.65 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 2 (CALHOUN, GREENE, JERSEY, MACOUPIN, MADISON, MONTGOMERY COUNTIES) $45.93 $25.72 $71.65 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 3 $46.25 $25.72 $71.97 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 3 (CALHOUN, GREENE, JERSEY, MACOUPIN, MADISON, MONTGOMERY COUNTIES) $46.25 $25.72 $71.97 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 3 (GREENE COUNTY) $46.25 $25.72 $71.97 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS $46.60 $25.72 $72.32 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (CALHOUN, GREENE, JERSEY, MACOUPIN, MADISON, MONTGOMERY COUNTIES) $46.60 $25.72 $72.32 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (GREENE COUNTY) $46.60 $25.72 $72.32 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK $47.71 $25.72 $73.43 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (CALHOUN, GREENE, JERSEY, MACOUPIN, MADI $47.71 $25.72 $73.43 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (GREENE COUNTY) $47.71 $25.72 $73.43 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB.CAPACITY; WINCH TRUCK $45.93 $25.72 $71.65 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Clinton, IL — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Clinton

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IL20260017-15741-hwy →