Residential Construction — Bureau, Illinois

WD IL20260026-14349-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Bureau, Illinois (construction type: residential) is $13.74/hr base + $2.55/hr fringe = $16.29/hr total package (WD IL20260026-14349-res, Rev. 1).

Scroll down for all 54 trade classifications covered by this determination.

WD Number: IL20260026-14349-res
Revision: 1
Construction Type: residential
State: Illinois (IL)
County: Bureau
Effective: May 17, 2026
Trades covered: 54
Official source: SAM.gov reference IL20260026View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $13.74 $2.55 $16.29 Bottom 10% -61% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDING DRYWALL HANGING AND BATT INSULATION (CARROLL, LEE, AND WHITESIDE COUNTIES) Rate A $31.32 $26.23 $57.55 Top 10% +57% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDING DRYWALL HANGING AND BATT INSULATION (CARROLL, LEE, AND WHITESIDE COUNTIES) Rate B $24.61 $15.94 $40.55 Top 10% +10% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING DRYWALL HANGING AND BATT INSULATION $30.00 $33.60 $63.60 Above median +73% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING DRYWALL HANGING AND BATT INSULATION $20.24 $14.74 $34.98 Bottom 10% -5% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING DRYWALL HANGING AND BATT INSULATION $30.22 $29.94 $60.16 Above median +64% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING DRYWALL HANGING AND BATT INSULATION $33.40 $24.85 $58.25 +59% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING DRYWALL HANGING AND BATT INSULATION $44.46 $40.96 $85.42 Top 10% +133% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: RATE A: MULTI-UNIT BUILDING CONTAINING MORE THAN 8 UNITS $31.32 $26.23 $57.55 Top 10% +57% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: RATE B: SINGLE FAMILY HOME DUPLEX AND A MULTI-UNIT BUILDING UP TO AND INCLUDING 8 UNITS $24.61 $15.94 $40.55 Top 10% +10% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $10.69 $2.49 $13.18 -65% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $15.00 $0.00 $15.00 -72% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (BUREAU, FORD, IROQUOIS, LA SALLE, PUTNAM & STARK COUNTIES) $45.33 $33.33 $78.66 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (CARROLL, JO DAVIESS, AND WHITESIDE COUNTIES) $19.60 $17.81 $37.41 Top 10% -19% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (CARROLL, JO DAVIESS, LEE, AND WHITESIDE COUNTIES) $30.61 $28.17 $58.78 Top 10% +27% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (FORD, IROQUOIS, LA SALLE, MARSHALL, PUTNAM AND LIVINGSTON COUNTIES) $25.02 $15.23 $40.25 Top 10% -13% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (IROQUOIS, AND VERMILION COUNTIES) $28.32 $10.18 $38.50 Top 10% -17% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (JO DAVIESS COUNTY) $42.45 $20.55 $63.00 Top 10% +36% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (PEORIA DIVISION - MARSHALL AND STARK COUNTIES) $26.58 $18.50 $45.08 Top 10% -3% vs market $0.00 $0.00 $0.00 $0.00
ELLIOT, GIBSON CITY, HARPSTER, MELVIN, PAXTON, ROBERTS & SIBLEY), JO DAVIESS, LASALLE, LEE, LIVINGSTON, PUTNAM, WHITESIDE COUNTIES) $47.64 $25.42 $73.06 Top 10% $0.00 $0.00 $0.00 $0.00
ELLIOT, GIBSON CITY, HARPSTER, MELVIN, PAXTON, ROBERTS & SIBLEY), JO DAVIESS, LASALLE, LEE, LIVINGSTON, PUTNAM, WHITESIDE COUNTIES) $46.54 $25.42 $71.96 Above median $0.00 $0.00 $0.00 $0.00
ELLIOT, GIBSON CITY, HARPSTER, MELVIN, PAXTON, ROBERTS & SIBLEY), JO DAVIESS, LASALLE, LEE, LIVINGSTON, PUTNAM, WHITESIDE COUNTIES) $45.29 $25.42 $70.71 Bottom 10% $0.00 $0.00 $0.00 $0.00
ELLIOT, GIBSON CITY, HARPSTER, MELVIN, PAXTON, ROBERTS & SIBLEY), JO DAVIESS, LASALLE, LEE, LIVINGSTON, PUTNAM, WHITESIDE COUNTIES) $46.15 $25.42 $71.57 Top 10% $0.00 $0.00 $0.00 $0.00
ELLIOT, GIBSON CITY, HARPSTER, MELVIN, PAXTON, ROBERTS & SIBLEY), JO DAVIESS, LASALLE, LEE, LIVINGSTON, PUTNAM, WHITESIDE COUNTIES) $45.88 $25.42 $71.30 Bottom 10% $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $18.05 $2.64 $20.69 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER, UNSKILLED $11.39 $4.48 $15.87 Above median -49% vs market $0.00 $0.00 $0.00 $0.00
PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION $44.83 $0.30 $45.13 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER, EXCLUDING DRYWALL FINISHING: BRUSH $40.00 $26.90 $66.90 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH ONLY, EXCLUDING DRYWALL FINISHING: NEW APARTMENTS AND CONDOMINIUMS THREE STORIES AND OVER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PR $35.29 $14.50 $49.79 Top 10% +66% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH ONLY: EXCLUDING DRYWALL FINISHING $45.15 $29.41 $74.56 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH ONLY: EXCLUDING DRYWALL FINISHING $40.00 $26.90 $66.90 Bottom 10% +123% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH ONLY: EXCLUDING DRYWALL FINISHING $41.00 $27.80 $68.80 Above median +129% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH: EXCLUDING DRYWALL FINISHING $30.00 $17.37 $47.37 Top 10% +58% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $14.61 $3.17 $17.78 -62% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $13.29 $3.07 $16.36 Bottom 10% -64% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UN $45.29 $25.42 $70.71 +146% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 2 (IROQUOIS, VERMILION COUNTIES) $45.88 $25.42 $71.30 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 3 (IROQUOIS, VERMILION COUNTIES) $46.15 $25.42 $71.57 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 3.$ 44.10 24.27 TRUCK DRIVER, GROUP 2.$ 43.83 24.27 TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRES $43.24 $24.27 $67.51 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS $44.49 $24.27 $68.76 Bottom 10% +139% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (IROQUOIS, VERMILION COUNTIES) $46.54 $25.42 $71.96 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK $45.59 $24.27 $69.86 Bottom 10% +143% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (IROQUOIS, VERMILION COUNTIES) $47.64 $25.42 $73.06 Top 10% +154% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 2 OR 3 AXLE TRUCKS (FORD, AND LIVINGSTON COUNTIES) FOOTNOTES: A. $1055.60 PER WEEK. B. LOWBOY WORK CLASSIFICATION IS AN ADITIONAL $1.50 $44.82 $0.25 $45.07 Top 10% +57% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 2 OR 3 AXLES (IROQUOIS COUNTY) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONA $44.82 $0.25 $45.07 Top 10% +57% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 4 AXLE TRUCKS (FORD, AND LIVINGSTON COUNTIES) FOOTNOTES: A. $1055.60 PER WEEK. B. LOWBOY WORK CLASSIFICATION IS AN ADITIONAL $1.50 PER H $44.97 $0.25 $45.22 Top 10% +57% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 4 AXLES (IROQUOIS COUNTY) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.2 $44.97 $0.25 $45.22 Top 10% +57% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 4 AXLES (LEE COUNTY) FOOTNOTE: A.HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $ $44.98 $0.30 $45.28 Top 10% +57% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 5 AXLE TRUCKS (FORD, AND LIVINGSTON COUNTIES) FOOTNOTES: A. $1055.60 PER WEEK. B. LOWBOY WORK CLASSIFICATION IS AN ADITIONAL $1.50 PER H $45.17 $0.25 $45.42 Top 10% +58% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 5 AXLES (IROQUOIS COUNTY) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.2 $45.17 $0.25 $45.42 Top 10% +58% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 5 AXLES (LEE COUNTY) FOOTNOTE: A.HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $ $45.18 $0.30 $45.48 Top 10% +58% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 6 AXLE TRUCKS (FORD, AND LIVINGSTON COUNTIES) FOOTNOTES: A. $1055.60 PER WEEK. B. LOWBOY WORK CLASSIFICATION IS AN ADITIONAL $1.50 PER H $45.37 $0.25 $45.62 Top 10% +59% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 6 AXLES (IROQUOIS COUNTY) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.2 $45.37 $0.25 $45.62 Top 10% +59% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 6 AXLES (LEE COUNTY) FOOTNOTE: A.HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $ $45.38 $0.30 $45.68 Top 10% +59% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Bureau, IL — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Bureau

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IL20260026-14349-res →