Residential Construction — Boone, Illinois

WD IL20260053-17085-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for $.50 PER HOUR EXTRA in Boone, Illinois (construction type: residential) is $56.05/hr base + $51.05/hr fringe = $107.10/hr total package (WD IL20260053-17085-res, Rev. 1).

Scroll down for all 20 trade classifications covered by this determination.

WD Number: IL20260053-17085-res
Revision: 1
Construction Type: residential
State: Illinois (IL)
County: Boone
Effective: May 17, 2026
Trades covered: 20
Official source: SAM.gov reference IL20260053View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
$.50 PER HOUR EXTRA $56.05 $51.05 $107.10 $0.00 $0.00 $0.00 $0.00
BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN $53.60 $51.05 $104.65 Above median $0.00 $0.00 $0.00 $0.00
CARPENTER $37.19 $26.60 $63.79 Above median +74% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $41.03 $36.39 $77.42 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $30.61 $28.17 $58.78 +27% vs market $0.00 $0.00 $0.00 $0.00
HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACIT $51.60 $51.05 $102.65 $0.00 $0.00 $0.00 $0.00
HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACIT $56.75 $51.05 $107.80 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON, LANDSCAPE $42.72 $28.19 $70.91 +127% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: PLANTSMAN $9.00 $0.00 $9.00 -71% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL $45.15 $29.41 $74.56 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $37.90 $37.66 $75.56 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $55.54 $31.43 $86.97 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $50.25 $30.43 $80.68 Top 10% +151% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $39.47 $31.55 $71.02 Above median +58% vs market $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $44.38 $25.84 $70.22 Above median +40% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $45.49 $25.72 $71.21 Top 10% +177% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 2 - 3 AXLES FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX AXLES $48.47 $26.70 $75.17 Top 10% +161% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 4 AXLES FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX AXLES $48.62 $26.70 $75.32 Top 10% +162% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 5 AXLES FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX AXLES $48.82 $26.70 $75.52 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 6 AXLES FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX AXLES $48.93 $26.70 $75.63 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Boone, IL — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Boone

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IL20260053-17085-res →