Heavy Construction — Power, Idaho

WD ID20260072-17228-hvy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE in Power, Idaho (construction type: heavy) is $37.35/hr base + $16.10/hr fringe = $53.45/hr total package (WD ID20260072-17228-hvy, Rev. 2).

Scroll down for all 20 trade classifications covered by this determination.

WD Number: ID20260072-17228-hvy
Revision: 2
Construction Type: heavy
State: Idaho (ID)
County: Power
Effective: May 17, 2026
Trades covered: 20
Official source: SAM.gov reference ID20260072View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
$30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE $37.35 $16.10 $53.45 Bottom 10% $0.00 $0.00 $0.00 $0.00
$30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE $36.81 $16.10 $52.91 Bottom 10% $0.00 $0.00 $0.00 $0.00
CARPENTER $23.92 $9.03 $32.95 +41% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $26.06 $11.26 $37.32 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $22.43 $15.06 $37.49 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.00 $18.74 $58.74 +101% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GENERAL OR COMMON ZONE DIFFERENTIAL: ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADI $32.15 $16.30 $48.45 +122% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $22.68 $10.90 $33.58 Above median +54% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $22.15 $10.15 $32.30 Above median +48% vs market $0.00 $0.00 $0.00 $0.00
MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE $38.06 $16.10 $54.16 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES $36.64 $16.10 $52.74 +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILE $37.58 $16.10 $53.68 +89% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5A DUMP $35.60 $17.00 $52.60 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5B DUMP $35.78 $17.00 $52.78 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5C DUMP $36.01 $17.00 $53.01 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5D DUMP $36.12 $17.00 $53.12 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5E DUMP $36.75 $17.00 $53.75 Top 10% +110% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5F DUMP $37.19 $17.00 $54.19 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $21.00 $13.42 $34.42 Above median +34% vs market $0.00 $0.00 $0.00 $0.00
YDS TO AND INCLUDING 7YDS), OILER, SCRAPER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/ $36.98 $16.10 $53.08 $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Power, ID — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.