WD ID20260097-17241-hwy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Nez Perce, Idaho (construction type: highway) is $26.24/hr base + $9.48/hr fringe = $35.72/hr total package (WD ID20260097-17241-hwy, Rev. 2).

Scroll down for all 31 trade classifications covered by this determination.

WD Number: ID20260097-17241-hwy
Revision: 2
Construction Type: highway
State: Idaho (ID)
County: Nez Perce
Effective: May 17, 2026
Trades covered: 31
Official source: SAM.gov reference ID20260097View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $26.24 $9.48 $35.72 +53% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $23.92 $9.75 $33.67 Above median +44% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $26.97 $12.10 $39.07 +34% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $25.47 $9.52 $34.99 Top 10% $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $23.40 $9.72 $33.12 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $22.86 $10.32 $33.18 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $20.64 $7.37 $28.01 Above median +28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $23.36 $10.14 $33.50 Above median +54% vs market $0.00 $0.00 $0.00 $0.00
OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE $40.89 $18.64 $59.53 Top 10% $0.00 $0.00 $0.00 $0.00
OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE $28.48 $13.00 $41.48 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $25.60 $11.61 $37.21 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $25.18 $11.55 $36.73 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $23.34 $8.48 $31.82 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $23.53 $9.55 $33.08 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $23.13 $9.17 $32.30 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $26.06 $11.66 $37.72 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $26.06 $11.74 $37.80 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $23.55 $8.54 $32.09 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $22.25 $6.52 $28.77 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $25.80 $11.56 $37.36 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $19.99 $7.99 $27.98 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $25.77 $11.72 $37.49 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $25.04 $11.68 $36.72 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $25.89 $11.70 $37.59 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 6 BULLDOZER ZONE PAY: ZONE 1 0 - 45 MILES: FREE ZONE 2 45 MILES AND OVER: +$2.00/PER HOUR IF A PROJECT IS LOCATED IN M $40.05 $23.40 $63.45 +123% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $20.76 $9.40 $30.16 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $21.64 $9.40 $31.04 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $23.46 $12.12 $35.58 Top 10% +39% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $26.61 $13.21 $39.82 Top 10% +56% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK $23.93 $11.27 $35.20 Above median +38% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $23.15 $11.77 $34.92 Above median +36% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Nez Perce, ID — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Nez Perce

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for ID20260097-17241-hwy →