Davis-Bacon Wage Determinations — Minidoka, Idaho
Minidoka has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.
Quick Answer
Davis-Bacon prevailing wage determinations for Minidoka, Idaho cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.
building
Active
WD: ID20260017-17224-bld Rev. 2
Effective: May 17, 2026
View trade rates →
heavy
Active
WD: ID20260057-17224-hvy Rev. 2
Effective: May 17, 2026
View trade rates →
highway
Active
WD: ID20260083-17224-hwy Rev. 2
Effective: May 17, 2026
View trade rates →
residential
Active
WD: ID20260006-17224-res Rev. 1
Effective: May 17, 2026
View trade rates →
Top-Paying Trades in Minidoka
Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.
| # | Trade | Construction Type | Base $/hr | Fringe $/hr | Total Package | |
|---|---|---|---|---|---|---|
| 1 | SHEET METAL WORKER | building | $39.20 | $23.59 | $62.79 | WD → |
| 2 | OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | highway | $40.89 | $18.64 | $59.53 | WD → |
| 3 | CEMENT MASON/CONCRETE FINISHER | highway | $40.89 | $18.64 | $59.53 | WD → |
| 4 | ELECTRICIAN | highway | $40.00 | $18.74 | $58.74 | WD → |
| 5 | IRONWORKER, STRUCTURAL | building | $33.37 | $22.98 | $56.35 | WD → |
| 6 | PLUMBER | building | $36.75 | $18.93 | $55.68 | WD → |
| 7 | MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE | heavy | $38.06 | $16.10 | $54.16 | WD → |
| 8 | POWER EQUIPMENT OPERATOR: Scraper GROUP 10 | heavy | $38.06 | $16.10 | $54.16 | WD → |
| 9 | FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | heavy | $37.58 | $16.10 | $53.68 | WD → |
| 10 | POWER EQUIPMENT OPERATOR: Bulldozer, Scraper GROUP 8 | heavy | $37.58 | $16.10 | $53.68 | WD → |
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →