Quick Answer

The Davis-Bacon prevailing wage for $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE in Lemhi, Idaho (construction type: heavy) is $37.58/hr base + $16.10/hr fringe = $53.68/hr total package (WD ID20260053-17221-hvy, Rev. 2).

Scroll down for all 25 trade classifications covered by this determination.

WD Number: ID20260053-17221-hvy
Revision: 2
Construction Type: heavy
State: Idaho (ID)
County: Lemhi
Effective: May 17, 2026
Trades covered: 25
Official source: SAM.gov reference ID20260053View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
$30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE $37.58 $16.10 $53.68 Top 10% $0.00 $0.00 $0.00 $0.00
CARPENTER $25.27 $9.10 $34.37 +47% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.02 $0.00 $18.02 -23% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.00 $18.74 $58.74 +101% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $27.22 $16.70 $43.92 Above median +47% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $33.37 $22.98 $56.35 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $20.26 $10.15 $30.41 Above median +39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 1 FLAGGER $33.63 $16.50 $50.13 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR $33.83 $16.50 $50.33 Top 10% +131% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $18.23 $3.77 $22.00 Above median +1% vs market $0.00 $0.00 $0.00 $0.00
LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STRE $35.68 $18.24 $53.92 Top 10% $0.00 $0.00 $0.00 $0.00
MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE $36.98 $16.10 $53.08 $0.00 $0.00 $0.00 $0.00
MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE $38.06 $16.10 $54.16 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.40 $6.59 $27.99 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $21.05 $0.00 $21.05 $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE BATCH PLANT $24.94 $11.96 $36.90 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $24.30 $8.38 $32.68 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $17.00 $0.00 $17.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $24.91 $8.79 $33.70 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $21.33 $4.25 $25.58 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PE $36.33 $16.10 $52.43 Top 10% +84% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 7: DRILL, HEAVY DUTY MECHANIC, SCRAPERS ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE $37.35 $16.10 $53.45 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.53 $0.00 $17.53 Above median -32% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $21.00 $12.10 $33.10 Top 10% +29% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $24.57 $11.22 $35.79 Top 10% +40% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Lemhi, ID — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Lemhi

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for ID20260053-17221-hvy →