Highway Construction — Kootenai, Idaho

WD ID20260096-17238-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Kootenai, Idaho (construction type: highway) is $26.24/hr base + $9.48/hr fringe = $35.72/hr total package (WD ID20260096-17238-hwy, Rev. 1).

Scroll down for all 32 trade classifications covered by this determination.

WD Number: ID20260096-17238-hwy
Revision: 1
Construction Type: highway
State: Idaho (ID)
County: Kootenai
Effective: May 17, 2026
Trades covered: 32
Official source: SAM.gov reference ID20260096View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $26.24 $9.48 $35.72 +53% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $23.92 $9.75 $33.67 Above median +44% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $26.97 $12.10 $39.07 +34% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $25.47 $9.52 $34.99 Top 10% $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $23.40 $9.72 $33.12 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $22.86 $9.54 $32.40 Above median +48% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $20.64 $7.37 $28.01 Above median +28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $23.07 $10.00 $33.07 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE $40.89 $18.64 $59.53 Top 10% $0.00 $0.00 $0.00 $0.00
OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE $28.48 $13.00 $41.48 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $25.88 $11.62 $37.50 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $25.18 $11.55 $36.73 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $23.34 $8.48 $31.82 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $23.53 $9.55 $33.08 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $23.13 $9.17 $32.30 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $26.06 $11.64 $37.70 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $26.06 $11.76 $37.82 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $23.55 $8.54 $32.09 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $22.25 $6.52 $28.77 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $25.78 $11.50 $37.28 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $19.99 $7.99 $27.98 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $25.77 $11.64 $37.41 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $25.12 $11.76 $36.88 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $26.06 $11.56 $37.62 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER $37.58 $16.10 $53.68 +89% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $20.76 $9.40 $30.16 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $21.64 $9.40 $31.04 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $37.02 $20.93 $57.95 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $36.58 $20.93 $57.51 Top 10% +125% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $26.61 $13.21 $39.82 Top 10% +56% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK $23.93 $11.27 $35.20 Above median +38% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $23.14 $11.72 $34.86 Above median +36% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Kootenai, ID — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Kootenai

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for ID20260096-17238-hwy →