Highway Construction — Bannock, Idaho

WD ID20260091-17201-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE in Bannock, Idaho (construction type: highway) is $37.35/hr base + $16.10/hr fringe = $53.45/hr total package (WD ID20260091-17201-hwy, Rev. 1).

Scroll down for all 28 trade classifications covered by this determination.

WD Number: ID20260091-17201-hwy
Revision: 1
Construction Type: highway
State: Idaho (ID)
County: Bannock
Effective: May 17, 2026
Trades covered: 28
Official source: SAM.gov reference ID20260091View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE $37.35 $16.10 $53.45 $0.00 $0.00 $0.00 $0.00
CARPENTER $26.24 $9.48 $35.72 +53% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $23.92 $9.84 $33.76 Above median +45% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $22.90 $11.99 $34.89 Above median +49% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $26.33 $11.45 $37.78 +30% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $25.47 $9.52 $34.99 Top 10% $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $19.38 $7.63 $27.01 Above median +24% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $19.18 $7.65 $26.83 Above median +23% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $20.64 $7.37 $28.01 Above median +28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $22.34 $10.90 $33.24 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZON $36.98 $16.10 $53.08 $0.00 $0.00 $0.00 $0.00
MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE $36.64 $16.10 $52.74 $0.00 $0.00 $0.00 $0.00
OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE $28.48 $13.00 $41.48 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $21.15 $8.20 $29.35 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $24.34 $8.04 $32.38 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $23.34 $9.45 $32.79 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $23.13 $9.17 $32.30 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $22.25 $6.52 $28.77 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $24.37 $7.11 $31.48 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $19.99 $7.99 $27.98 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $22.30 $7.22 $29.52 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PE $36.33 $16.10 $52.43 Top 10% +84% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00 $37.58 $16.10 $53.68 +89% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $17.69 $4.66 $22.35 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $21.59 $10.93 $32.52 Top 10% +27% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $26.61 $13.21 $39.82 Top 10% +56% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK $23.93 $11.27 $35.20 Above median +38% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $21.54 $12.19 $33.73 Above median +32% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Bannock, ID — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.