Building Construction — Worth, Georgia

WD GA20260312-16567-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Worth, Georgia (construction type: building) is $33.90/hr base + $18.80/hr fringe = $52.70/hr total package (WD GA20260312-16567-bld, Rev. 2).

Scroll down for all 22 trade classifications covered by this determination.

WD Number: GA20260312-16567-bld
Revision: 2
Construction Type: building
State: Georgia (GA)
County: Worth
Effective: May 17, 2026
Trades covered: 22
Official source: SAM.gov reference GA20260312View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $33.90 $18.80 $52.70 +139% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $20.69 $4.48 $25.17 +4% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.12 $0.00 $13.12 -42% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $22.45 $12.41 $34.86 +23% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $32.00 $15.05 $47.05 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $32.00 $15.05 $47.05 +71% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $31.31 $17.68 $48.99 +78% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.24 $0.00 $10.24 -44% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.55 $1.90 $14.45 -21% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $14.24 $0.00 $14.24 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $14.88 $0.00 $14.88 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.23 $0.00 $15.23 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $38.53 $16.08 $54.61 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $32.93 $16.08 $49.01 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $16.80 $0.00 $16.80 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $14.86 $0.00 $14.86 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $14.05 $0.00 $14.05 $0.00 $0.00 $0.00 $0.00
PAINTER $15.33 $0.00 $15.33 -33% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $15.67 $0.00 $15.67 -32% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $38.98 $17.01 $55.99 +107% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $38.98 $17.01 $55.99 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $38.29 $17.40 $55.69 +115% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Worth, GA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Worth

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for GA20260312-16567-bld →