Residential Construction — Whitfield, Georgia

WD GA20260053-16614-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Whitfield, Georgia (construction type: residential) is $13.83/hr base + $0.00/hr fringe = $13.83/hr total package (WD GA20260053-16614-res, Rev. 1).

Scroll down for all 15 trade classifications covered by this determination.

WD Number: GA20260053-16614-res
Revision: 1
Construction Type: residential
State: Georgia (GA)
County: Whitfield
Effective: May 17, 2026
Trades covered: 15
Official source: SAM.gov reference GA20260053View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $13.83 $0.00 $13.83 Bottom 10% -52% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $13.11 $1.89 $15.00 -38% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.02 $3.52 $16.54 -27% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $14.51 $3.82 $18.33 -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.00 $0.00 $10.00 -45% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER $8.00 $0.00 $8.00 Above median -56% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $13.66 $3.05 $16.71 $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $8.96 $0.00 $8.96 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $26.00 $14.90 $40.90 Top 10% +78% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $25.85 $12.74 $38.59 Top 10% +68% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $10.86 $0.00 $10.86 Bottom 10% -60% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $9.47 $0.00 $9.47 Bottom 10% -59% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER FOOTNOTE: WORK ON SWINGING STAGES, BOATSWAINS CHAIRS OR SCAFFOLDS, BOOMS, OR SCISSORS LIFTS OVER 50 FT. HIGH: $1.25 PER HOUR ADDITI $32.60 $15.52 $48.12 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER FOOTNOTE: WORK ON SWINGING STAGES, BOATSWAINS CHAIRS OR SCAFFOLDS, BOOMS, OR SCISSORS LIFTS OVER 50 FT. HIGH: $1.25 PER HOUR ADDITI $32.60 $13.41 $46.01 Bottom 10% +77% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $12.17 $0.83 $13.00 -52% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Whitfield, GA — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Whitfield

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for GA20260053-16614-res →