Building Construction — Wayne, Georgia

WD GA20260108-16695-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER in Wayne, Georgia (construction type: building) is $34.21/hr base + $23.92/hr fringe = $58.13/hr total package (WD GA20260108-16695-bld, Rev. 2).

Scroll down for all 25 trade classifications covered by this determination.

WD Number: GA20260108-16695-bld
Revision: 2
Construction Type: building
State: Georgia (GA)
County: Wayne
Effective: May 17, 2026
Trades covered: 25
Official source: SAM.gov reference GA20260108View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $34.21 $23.92 $58.13 +91% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $15.97 $1.95 $17.92 Above median -26% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $11.75 $0.00 $11.75 -48% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING $33.35 $13.40 $46.75 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING $29.50 $14.88 $44.38 Bottom 10% +57% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC $19.38 $14.42 $33.80 +4% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $13.19 $0.00 $13.19 Bottom 10% -42% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $17.72 $0.00 $17.72 -35% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $16.75 $0.00 $16.75 Bottom 10% -39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.55 $0.00 $9.55 -48% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.33 $0.00 $13.33 -27% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $15.00 $0.75 $15.75 $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $12.00 $0.00 $12.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $16.00 $1.62 $17.62 Above median -23% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $16.38 $4.56 $20.94 Bottom 10% -23% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC UNIT AND HVAC ELECTRICAL TEMPERATURE CONTROL INSTALLATION; EXCLUDING HVAC PIPE INSTALLATION $38.98 $17.01 $55.99 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC UNIT AND HVAC ELECTRICAL TEMPERATURE CONTROL INSTALLATION; EXCLUDING HVAC PIPE INSTALLATION $34.00 $16.35 $50.35 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES INSTALLATION OF HVAC PIPE, HVAC UNIT, AND HVAC ELECTRICAL/TEMPERATURE CONTROLS $18.55 $3.35 $21.90 Top 10% -19% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $34.00 $17.70 $51.70 Above median +132% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $33.00 $17.70 $50.70 +127% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $32.00 $17.70 $49.70 +123% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $13.62 $0.00 $13.62 -40% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $15.09 $3.53 $18.62 -28% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: EXCLUDES HVAC DUCT INSTALLATION $37.75 $17.95 $55.70 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $19.25 $2.54 $21.79 Bottom 10% -19% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Wayne, GA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Wayne

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for GA20260108-16695-bld →