Building Construction — Taylor, Georgia

WD GA20260106-16649-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER in Taylor, Georgia (construction type: building) is $34.21/hr base + $23.92/hr fringe = $58.13/hr total package (WD GA20260106-16649-bld, Rev. 2).

Scroll down for all 26 trade classifications covered by this determination.

WD Number: GA20260106-16649-bld
Revision: 2
Construction Type: building
State: Georgia (GA)
County: Taylor
Effective: May 17, 2026
Trades covered: 26
Official source: SAM.gov reference GA20260106View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $34.21 $23.92 $58.13 +91% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION $18.00 $0.00 $18.00 Bottom 10% -26% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $12.45 $0.54 $12.99 -43% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER, INCLUDES METAL STUD INSTALLATION $12.00 $0.00 $12.00 Above median -53% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING $38.65 $12.75 $51.40 Above median +82% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING $32.00 $14.71 $46.71 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING $29.50 $14.88 $44.38 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $14.93 $1.11 $16.04 Bottom 10% -30% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $17.72 $0.00 $17.72 -35% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $16.75 $0.00 $16.75 Bottom 10% -39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.51 $0.59 $11.10 -39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.33 $0.00 $13.33 -27% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $15.50 $0.65 $16.15 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $38.53 $16.08 $54.61 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $12.00 $0.00 $12.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, SPRAY $26.00 $14.90 $40.90 Top 10% +78% vs market $0.00 $0.00 $0.00 $0.00
PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE $52.08 $38.44 $90.52 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE AND HVAC UNIT INSTALLATION $38.98 $17.01 $55.99 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $30.00 $16.66 $46.66 Above median +72% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $38.98 $17.01 $55.99 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $34.00 $17.70 $51.70 Above median +132% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $33.00 $17.70 $50.70 +127% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $32.00 $17.70 $49.70 +123% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $37.75 $17.95 $55.70 +115% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 18.91 0.00 ROOFER $13.62 $0.00 $13.62 Top 10% -47% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $18.81 $1.44 $20.25 Bottom 10% -25% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Taylor, GA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Taylor

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for GA20260106-16649-bld →