Residential Construction — Putnam, Georgia
WD GA20260019-16672-res · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER, EXCLUDES DRYWALL HANGING in Putnam, Georgia (construction type: residential) is $9.25/hr base + $0.00/hr fringe = $9.25/hr total package (WD GA20260019-16672-res, Rev. 1).
Scroll down for all 10 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, EXCLUDES DRYWALL HANGING | $9.25 | $0.00 | $9.25 Bottom 10% -62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $8.00 | $0.00 | $8.00 Bottom 10% -65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL HANGER | $8.78 | $0.00 | $8.78 -66% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $11.44 | $0.00 | $11.44 Bottom 10% -60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HVAC MECHANIC | $11.55 | $0.00 | $11.55 -56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $7.25 | $0.00 | $7.25 Bottom 10% -60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR | $11.89 | $0.00 | $11.89 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH ONLY | $10.47 | $0.00 | $10.47 -54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $12.72 | $0.00 | $12.72 Bottom 10% -53% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $9.73 | $0.00 | $9.73 Bottom 10% -62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Putnam, GA — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Compliance Notes
- This wage determination applies to federal contracts for residential construction in Putnam, Georgia.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.