Highway Construction — Pulaski, Georgia

WD GA20260274-16671-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, EXCLUDES FORM WORK in Pulaski, Georgia (construction type: highway) is $15.30/hr base + $0.00/hr fringe = $15.30/hr total package (WD GA20260274-16671-hwy, Rev. 1).

Scroll down for all 38 trade classifications covered by this determination.

WD Number: GA20260274-16671-hwy
Revision: 1
Construction Type: highway
State: Georgia (GA)
County: Pulaski
Effective: May 17, 2026
Trades covered: 38
Official source: SAM.gov reference GA20260274View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, EXCLUDES FORM WORK $15.30 $0.00 $15.30 -37% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.09 $0.00 $14.09 -38% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $13.01 $0.00 $13.01 $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: OPERATOR $15.76 $1.45 $17.21 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $17.17 $0.00 $17.17 -37% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $15.14 $0.00 $15.14 Bottom 10% -45% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT $11.00 $0.30 $11.30 Bottom 10% -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDES EROSION CONTROL $9.71 $0.00 $9.71 Bottom 10% -47% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $11.45 $0.00 $11.45 Bottom 10% -37% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $11.24 $0.00 $11.24 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.79 $0.00 $12.79 -30% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.64 $6.21 $22.85 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $12.22 $0.00 $12.22 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $11.58 $0.00 $11.58 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.22 $2.08 $17.30 $0.00 $0.00 $0.00 $0.00
OPERATOR: COMPACTOR $12.60 $2.17 $14.77 $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE SAW $18.47 $0.00 $18.47 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $20.75 $3.13 $23.88 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $18.09 $4.16 $22.25 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: HYDROSEEDER $11.68 $0.00 $11.68 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $13.64 $2.24 $15.88 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $18.21 $0.00 $18.21 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $15.16 $2.52 $17.68 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $15.31 $3.38 $18.69 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PILEDRIVER $16.70 $0.00 $16.70 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $13.15 $2.15 $15.30 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $12.64 $0.00 $12.64 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $14.22 $0.00 $14.22 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $23.30 $0.00 $23.30 +2% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $12.57 $0.00 $12.57 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $12.16 $0.00 $12.16 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $13.57 $0.00 $13.57 -50% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $14.96 $1.19 $16.15 Above median -41% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: HYDROSEEDER TRUCK $14.92 $0.00 $14.92 Top 10% -45% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $16.40 $0.00 $16.40 -40% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF THE ROAD TRUCK $12.38 $0.00 $12.38 -54% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI/TRAILER TRUCK $16.13 $0.00 $16.13 Above median -41% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $12.82 $1.61 $14.43 -47% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Pulaski, GA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.