Building Construction — Oconee, Georgia

WD GA20260321-16601-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Oconee, Georgia (construction type: building) is $33.90/hr base + $18.80/hr fringe = $52.70/hr total package (WD GA20260321-16601-bld, Rev. 2).

Scroll down for all 23 trade classifications covered by this determination.

WD Number: GA20260321-16601-bld
Revision: 2
Construction Type: building
State: Georgia (GA)
County: Oconee
Effective: May 17, 2026
Trades covered: 23
Official source: SAM.gov reference GA20260321View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $33.90 $18.80 $52.70 +139% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $24.68 $0.00 $24.68 +2% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $22.92 $0.00 $22.92 +1% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $38.65 $12.75 $51.40 +82% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $26.17 $12.23 $38.40 Top 10% +45% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $32.00 $15.05 $47.05 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $32.00 $15.05 $47.05 +71% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $31.31 $17.68 $48.99 +78% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.06 $0.00 $14.06 Above median -23% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.55 $1.90 $14.45 -21% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $14.88 $0.00 $14.88 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.23 $0.00 $15.23 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $38.53 $16.08 $54.61 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $32.93 $16.08 $49.01 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $16.80 $0.00 $16.80 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $14.86 $0.00 $14.86 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $14.05 $0.00 $14.05 $0.00 $0.00 $0.00 $0.00
PAINTER $16.14 $0.00 $16.14 -30% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $16.29 $0.00 $16.29 -29% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $41.18 $17.01 $58.19 +115% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $30.68 $10.75 $41.43 +53% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $33.00 $17.70 $50.70 Above median +127% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $38.29 $17.40 $55.69 +115% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Oconee, GA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Oconee

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for GA20260321-16601-bld →