Heavy Construction — Hall, Georgia

WD GA20260289-16593-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Hall, Georgia (construction type: heavy) is $21.64/hr base + $3.90/hr fringe = $25.54/hr total package (WD GA20260289-16593-hvy, Rev. 1).

Scroll down for all 10 trade classifications covered by this determination.

WD Number: GA20260289-16593-hvy
Revision: 1
Construction Type: heavy
State: Georgia (GA)
County: Hall
Effective: May 17, 2026
Trades covered: 10
Official source: SAM.gov reference GA20260289View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $21.64 $3.90 $25.54 +5% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.02 $3.29 $22.31 -2% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $38.65 $12.75 $51.40 +82% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.98 $1.38 $15.36 Above median -16% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $17.11 $3.23 $20.34 Above median +11% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $24.17 $4.70 $28.87 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $16.29 $0.00 $16.29 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $25.45 $0.00 $25.45 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $17.86 $0.65 $18.51 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $11.89 $0.00 $11.89 Bottom 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Hall, GA — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Hall

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for GA20260289-16593-hvy →