Heavy Construction — Elbert, Georgia

WD GA20260064-16617-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Elbert, Georgia (construction type: heavy) is $20.51/hr base + $0.01/hr fringe = $20.52/hr total package (WD GA20260064-16617-hvy, Rev. 1).

Scroll down for all 9 trade classifications covered by this determination.

WD Number: GA20260064-16617-hvy
Revision: 1
Construction Type: heavy
State: Georgia (GA)
County: Elbert
Effective: May 17, 2026
Trades covered: 9
Official source: SAM.gov reference GA20260064View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $20.51 $0.01 $20.52 -16% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.30 $2.43 $21.73 -4% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $28.40 $0.52 $28.92 +2% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $15.19 $0.00 $15.19 Above median -17% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.08 $0.00 $16.08 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $24.89 $0.00 $24.89 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $25.82 $1.81 $27.63 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $21.77 $0.00 $21.77 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $16.41 $2.93 $19.34 Above median -29% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Elbert, GA — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Elbert

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for GA20260064-16617-hvy →