Heavy Construction — Effingham, Georgia

WD GA20260294-16686-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Effingham, Georgia (construction type: heavy) is $24.02/hr base + $10.71/hr fringe = $34.73/hr total package (WD GA20260294-16686-hvy, Rev. 1).

Scroll down for all 11 trade classifications covered by this determination.

WD Number: GA20260294-16686-hvy
Revision: 1
Construction Type: heavy
State: Georgia (GA)
County: Effingham
Effective: May 17, 2026
Trades covered: 11
Official source: SAM.gov reference GA20260294View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $24.02 $10.71 $34.73 +43% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $24.34 $4.53 $28.87 Above median +19% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $21.40 $4.25 $25.65 +13% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $23.67 $8.02 $31.69 +12% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $15.81 $2.44 $18.25 Above median +0% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.95 $0.00 $16.95 Above median -7% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $22.31 $3.29 $25.60 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $16.29 $0.00 $16.29 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $25.45 $0.00 $25.45 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $22.13 $0.00 $22.13 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $11.89 $0.00 $11.89 Bottom 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Effingham, GA — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Effingham

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for GA20260294-16686-hvy →